Leaking Gas Pipeline, Subang - Glenmarie Line Is Closed for 25 Days
The route from Subang heading to Glenmarie will be temporarily closed due to repair work on a leaking gas pipeline at the LRT 3 construction area at Jalan Persiaran Kerjaya, Section U1.
It is expected that the repair work will take 25 days before the road can be reused by the public.
Shah Alam District Police Chief Assistant Commissioner Baharudin Mat Taib said the police received information about the utility transferment yesterday and understood that the leaking channel is currently the main channel that supplies natural gas to the Federal Territory of Kuala Lumpur and surrounding areas.
According to Baharudin, the fire brigade recommended that this route be closed to ensure the safety of road users and residents in the surrounding area.
"For your information, the location of this road closure is the main route link from Subang to Glenmarie. If the full closure is carried out, it will cause severe congestion towards the Federal Highway towards Shah Alam.
"To avoid congestion, a contra route will be opened starting from the intersection of Temasya Kasih to the Palm Grove Building.
"The route distance between the two locations is about 350 meters. The time period for road closure and opening of contra routes is expected to be 25 days (repair period is expected to be completed)," he said in a statement today.
The picture shows the route from Subang towards Glenmarie which is closed and the contra route which is opened.
He added that during the 25 day period, patrols will be conducted by the Traffic Investigation and Enforcement Division (BSPT) of the Shah Alam IPD and the MRT to study the level of traffic congestion and also the safety of road users.
"Road users are advised to drive prudently, obey traffic signals and be careful when passing through the contra routes involved," Baharudin continued.
JPJ Running Numbers
KUALA LUMPUR
VPN1069
SELANGOR
BSG9062
JOHOR
JYE7314
PULAU PINANG
PRT2155
PERAK
ANY9487
PAHANG
CFD1469
KEDAH
KGB7107
NEGERI SEMBILAN
NEG6782
KOTA KINABALU
SJM210
KUCHING
QAB8847L
Last updated 10 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.94
+0.03
EURO 5 B7
RM 3.14
+0.03
Last updated 07 Aug, 2025
Related News
New GAC Flagship 3S Centre Opens In Glenmarie
New GAC Flagship 3S Centre opens in Glenmarie, Shah Alam, houses ICE and EV models plus full-fledge service centre.
22-10-2024
Three New BYD Outlets In The Klang Valley Officially Opened
Chinese EV marque BYD officially opens three new outlets within the Klang Valley this month.
08-05-2023
Latest News
Report: Hap Seng Drops smart Automobiles Brand
Renowned legacy local dealership firm Hap Seng star quietly drops smart Automobiles brand from its portfolio.
08-08-2025
230km Southern WCE Feasibility Study To Conclude By Dec
Study underway on 230km WCE from Banting to Gelang Patah to ease North-South Expressway jams.
08-08-2025
Bateriku Launches SIRIM-Certified Astra Batteries
Astra batteries from Bateriku are now SIRIM-certified, free insurance and warranty assist on offer too.
08-08-2025
Agong Gets To Grips With Aurus Senat In Russia
Agong Sultan Ibrahim gets behind the wheel of the Aurus Senat - Russia’s homegrown presidential limo.
08-08-2025
JPJ Will Seize Vehicles From Firms Hiring Foreign Commercial Drivers
JPJ will get tougher on companies hiring foreigners to drive commercial vehicles, with the possibility of vehicle seizure.
08-08-2025
Loke: Accessibility, Safety Upgrades Coming To LRT Stations
Prasarana studying plans to install barriers at older LRT stations for enhanced passenger safety.
08-08-2025
Grab Halts Mandarin Driver Option After Backlash
Grab has paused its Mandarin-speaking driver option after backlash, saying it was only a test to help Chinese tourists.
08-08-2025
RM20 Million Allocated to Upgrade Federal Highway Motorcycle Lanes – KKR
A total of RM20 million will be allocated to upgrade the motorcycle lanes on the Federal Highway, the Works Ministry says.
08-08-2025
Show More
trending_flat