Batang Kali - Genting Route Reopens On 6 Jan 2023 For Selected Vehicles Under Strict Conditions
-full_normal.jpg)
The Malaysian Road Works Department (JKR) announced via its social media yesterday that the earlier closed Jalan Negeri B66 Batang Kali - Genting Highlands Seksyen 14.0 route would be reopened to the public beginning today (6 Jan 2023) 5PM.
This route was completely shut off to the public following the fatal landslide incident on 16 December which claimed the lives of 30 holiday goers at the Father’s Organic Farm camping site.
-full_normal.jpg)
Menteri Besar Dato' Seri Amirudin Shari has earlier promised on 25 Dec 2022 to expedite the road opening before the end of Jan 2023.
However it is to note that this opening is just for a temporary route where only one (1) lane would be accessible with a few key conditions. The reason for this expedited temporary road opening is mainly for the usage of Genting Highlands employees, hence to be able to travel on it a employers letter would be required.
Secondly, vehicles permitted to use the route are Class 1 vehicles (car, taxi and MPV) and Class 6 vehicles (motorcycle and scooter). The final condition is that road users are not permitted to stop on the route where the landslide had occurred.
-full_normal.jpg)
Users are also advised to be careful when navigating this route and adhere to all road signs as road repair works are still underway. JKR however advises all road users if and when possible to use the alternative route which is much safer. The alternative routes are Jalan Negeri B23 Laluan Ulu Yam - Batu Caves and Jalan Persekutuan FT001, Laluan Kuala Lumpur - Ipoh.
Gallery
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPY5456
SELANGOR
BSK697
JOHOR
JYK7945
PULAU PINANG
PRV5504
PERAK
APC4203
PAHANG
CFE1146
KEDAH
KGC9254
NEGERI SEMBILAN
NEH5704
KOTA KINABALU
SJN6031
KUCHING
QAB4950M
Last updated 11 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.02
+0.07
EURO 5 B7
RM 3.22
+0.07
Last updated 06 Nov, 2025
Related News
Selangor MB Proposes Extension Of WCE To KLIA
Selangor MB proposed that WCE be extended to Kuala Lumpur International Airport.
28-10-2024
Jalan B66 Batang Kali-Genting To Reopen In January Instead Of End 2023
He further stated that this conclusion was reached following negotiations with the Public Works Department (JKR) yesterday. This is also to provide access to the 5,000 or so Batang Kali, Hulu Selangor inhabitants who rely on the road to get to and from employment in Genting Highlands.
25-12-2022
Selangor State Approves Additional RM21.1 Million Towards Batang Kali Landslide Rehabilitation
RM21.1 Million additional allocation has been approved by the Selangor state government for the Batang Kali slope rehabilitation works
17-01-2023
Solar Lights Transform Gerik-Jeli Highway After Crash Concerns
Solar lights now brighten the Gerik-Jeli highway as part of JKR’s safety upgrade following the recent UPSI bus crash.
31-07-2025
JRTB Gets RM55M for Repairs, Staged Rollout Planned
JKR to begin phased repairs on Gerik–Jeli stretch with RM55 million allocation.
23-06-2025
Authorities Must Follow 24h Road Repair SOP - Works Ministry
Authorities must follow the SOP set by KKR to repair damaged federal roads within 24 hours.
27-11-2024
1,577 High-Risk Slopes Identified In Malaysia - KKR
KKR has identified that 1,577 of the 34,714 slopes along Federal Roads nationwide are at very high risk.
06-11-2024
Pandamaran Flyover Closure On 30 & 31 Jan 2023 For Expansion Bridge Work
The Malaysian Roadworks Department (JKR) has announced a closure of the Pandamaran Flyover from Kesas heading to Westport via Pulau Indah Highway (FT181).
29-01-2023
Latest News
PLUS To Close Two Bangi Ramps Nightly Until Nov 28
PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.
10-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient
JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.
10-11-2025
Proton Shifts 15,575 Units In Oct 2025, Outgoing Saga Still Leads
Proton closes Oct 2025 by shifting 15,575 units, outgoing Saga sales spikes to 12-year high ahead of successor’s debut.
10-11-2025
JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams
JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.
10-11-2025
RM3b Juru–Sungai Dua Link Cuts Travel Time To Just 20 Minutes
RM3 billion traffic dispersal project aims to slash travel time between Juru and Sungai Dua from an hour to just 20 minutes.
10-11-2025
Nanta: Barrier-Free ANPR Toll System Still at RFP Stage
The Works Ministry is inviting proposals for an ANPR-based barrier-free MLFF toll system.
10-11-2025
New Leapmotor 3S Showroom Opens In Ipoh, Perak
Perak state capital of Ipoh gains new Leapmotor brand 3S showroom and service outlet operated by dealers CST Auto.
07-11-2025
Show More
trending_flat