ENZHMS
Link Copiedcheck_circle
Auto News

Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Thoriq Azmi

Share via

KKR-Road-works---theStar.jpg

It has been revealed that over RM1.9 billion was spent by the Govt via the Works Ministry last year to maintain federal roads across Peninsular Malaysia last year.


Works Minister Datuk Seri Alexander Linggi reportedly revealed that his ministry spent over RM1.9 billion to maintain roads in 11 states across Peninsular Malaysia last year.

The minister revealed this as part of a response to a question raised by Datuk Seri Jeffrey Kitingan in Dewan Rakyat recently where asked about the sum allocated for road maintenance in Peninsular Malaysia and Sabah.

Datuk Seri Alexander then detailed that the total sum spent to maintain these roads across Peninsular Malaysia was RM1.909 billion. The expenditure covered works performed over a 13,596.85 KM stretch of roads.

The effort included routine maintenance, periodic pavement and non-pavement maintenance, bridge maintenance, streetlamps and signal lights, as well as small maintenance allocations for each district engineer.


447970935_18030647501079211_7755285677274691871_n.jpgJetpatcher_Selangor-Journal_-(2).jpg


The minister also revealed RM317,973 million was spent in Sabah last year to cover the same road maintenance aspect as in Peninsular Malaysia. He adds the sum noted represents 13.23% of the total budget allocated, whilst neighbouring Sarawak and Labuan each received 6.378% and 0.95%.

Altogether, road works and maintenance across Peninsular Malaysia took up 79.45% of the allocated budget last year, averaging 7.22% for each state

"To address and reduce maintenance backlogs, the ministry is always working towards obtaining additional allocations from the Finance Ministry to ensure the safety and comfort of road users in Sabah," added Nanta.



Share This Article

Written By

Thoriq Azmi

Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/

Share via

JPJ Running Numbers

KUALA LUMPUR

VPG3497

SELANGOR

BSF4838

JOHOR

JYA4553

PULAU PINANG

PRR4758

PERAK

ANW6434

PAHANG

CFC1277

KEDAH

KGA9315

NEGERI SEMBILAN

NEG2297

KOTA KINABALU

SJL2913

KUCHING

QAB5083L

Last updated 17 Jun, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.07

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.74

EURO 5 B7

RM 2.94

Last updated 12 Jun, 2025

Related News

Auto News

Potholes Must Be Fixed Within 24 Hours - Works Minister

The Works Minister urged the Federal road concessionaires to temporarily patch damaged roads within 24 hours.

24-03-2025
Auto News

1,577 High-Risk Slopes Identified In Malaysia - KKR

KKR has identified that 1,577 of the 34,714 slopes along Federal Roads nationwide are at very high risk.

06-11-2024
Auto News

KKR Seeking RM20 Million To Build R&R Along LTU Highway

Works Ministry seeks RM20 million budget allocation to set-up R&R along LTU Highway.

11-10-2024
Auto News

Additional RM100 Million Allocated To Maintain, Fix Federal Roads

Govt. reportedly approves additional allocation of RM100 million to maintain and fix federal roads across Peninsular Malaysia.

02-09-2024
Auto News

Works Minister: RM4 Billion Needed To Repair Federal Roads

Works Minister Datuk Seri Alexander Nanta Linggi revealed up to RM4 billion is needed to repair federal roads.

30-07-2024
Auto News

652 Heavy Vehicle Accidents Recorded, Weigh-in Motion System Coming Soon

Q1 2024 saw 652 accidents involving heavy vehicles resulting in 287 fatalities due to various reasons including speeding and overloading.

24-06-2024
Auto News

KKR Claims To Achieve 100% Pothole Patching Rate From MYJalan Reports

KKR has received 14,031 reports via the MYJalan App and has resolved 86% of it.

25-04-2024
Auto News

Hari Raya 2024: Toll Free Travel On April 8 & 9

The government would provide users with two days of toll-free travel nationwide in conjunction with the Hari Raya 2024 celebrations on April 8 and 9.

29-03-2024

Latest News

Auto News

PLUS Opens Three New Lanes At Rawang Selatan Toll Plaza

PLUS has announced the addition of three new lanes at the Rawang Selatan toll plaza (Exit 115).

16-06-2025
Auto News

RON95 Petrol Subsidy Rationalisation Will Proceed – PMX

The government will proceed with the RON95 fuel subsidy rationalisation, says Prime Minister Anwar Ibrahim.

16-06-2025
Auto News

Car Wash Worker Severely Injured After Vehicle Plunges From 3rd Floor

A car wash worker driving a customer’s Toyota Camry crashed through the wall of a building in Old Klang Road on Sunday.

16-06-2025
Auto News

Roslan Abdullah Joins GWM Malaysia As New COO

Former deputy CEO of Proton Roslan Abdullah appointed as new COO at GWM Malaysia.

16-06-2025
Auto News

Mustang, BMW Owners Caught With Expired Road Tax, Citing Financial Issues

Financial issues cited by Mustang and BMW X5 owners caught with expired road tax during JPJ operation.

16-06-2025
Auto News

Nanta: Damaged Road Surface Linked to Cyclist’s Death

Road damage blamed on heavy lorry traffic; urgent repairs ordered following fatal crash.

16-06-2025
Auto News

Gerik Crash: No signs Of Brake, Steering Failure

Preliminary investigations into the fatal June 9 bus crash in Gerik, have not revealed any technical malfunctions.

15-06-2025
Auto News

Gerik Crash: Motac Urges Return Of Authority Over Tourism Vehicles

In response to the fatal bus crash involving UPSI students, Motac aimed to regain control over tourism transport for safety reasons.

13-06-2025

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.