Traffic Advisory Issued Ahead of 2025 Le Tour de Langkawi

The Royal Malaysia Traffic Police (JSPT) has issued a traffic advisory ahead of the 2025 Petronas Le Tour de Langkawi (LTdL), which runs from 28 September to 5 October.
The 29th edition of the race will cover 1,244.2 kilometres across eight stages, featuring 132 riders from 22 international teams.
The race begins in Langkawi on 28 September with a 96.7 km circuit to Padang Mat Sirat before heading to Perlis, Penang, Perak, Kelantan, Terengganu, Pahang, Selangor, Negeri Sembilan, Melaka, and Johor.
It will conclude in Kuala Lumpur on 5 October, with the final sprint ending at the Petronas Twin Towers.
Highlights include the punishing 198.2 km route from Gerik to Pasir Puteh (Stage 3), the challenging climb to Fraser’s Hill (Stage 5), and the longest stage, a 214.9 km ride from Malacca to Medini (Stage 7).
To ensure safety, JSPT will deploy 164 personnel, including 16 officers and 148 other ranks, supported by state police. Roads along the route will face temporary closures and diversions, depending on race progress.
-(1)-(1)-(1)-(1)-(1).png)
Motorists are advised to plan journeys early, use alternative routes, and follow traffic instructions to minimise disruption. Spectators are encouraged to arrive ahead of time at viewing points before road closures take effect.
“Public cooperation is vital for the safe and smooth running of this international sporting event,” JSPT said in a statement.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQA2396
SELANGOR
BSK1953
JOHOR
JYL1735
PULAU PINANG
PRV7106
PERAK
APC5320
PAHANG
CFE1654
KEDAH
KGD248
NEGERI SEMBILAN
NEH6071
KOTA KINABALU
SJN6727
KUCHING
QAB5213M
Last updated 16 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.65
+0.05
RON 97
RM 3.25
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.07
+0.05
EURO 5 B7
RM 3.27
+0.05
Last updated 13 Nov, 2025
Related News
Road Closures In KL Ahead Of Marathon, LTdL 2025
Major city routes will be shut in stages on Oct 4–5 for the KLSCM and LTdL finale at KLCC.
03-10-2025
Latest News
BYD Sees 2025 YTD Sales Total Reach 11,097 Units – 70% YoY Up From 2024
BYD Cars Malaysia discloses its 2025 YTD toral sales have reached 11,097 units, marking a 70% YoY increase from 2024.
14-11-2025
KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades
KLIA’s Aerotrain will be suspended nightly from 9PM to 7AM starting Nov 15 for reliability upgrades.
14-11-2025
Kelana Jaya LRT Weekend Disruptions For Upgrades
Rapid KL will upgrade the Kelana Jaya Line signalling system on Nov 15–16 and 29–30.
14-11-2025
GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain
GWM Malaysia strengthens local partnerships and production to support the nation’s new-energy mobility ambitions.
14-11-2025
Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka
Mitsubishi Motors Malaysia, together with Eon Auto Mart, announces the relocation and upgrade of its outlet in Melaka.
14-11-2025
PLUS Implements Night Contra-Flow On Elite Highway For Pipe Work
Motorists on the Elite Highway should expect a contra-flow from Nov 17–20 for pipe work.
14-11-2025
Flat Rate, Rule of 78, Reducing Balance: How Hire-Purchase Loans Really Work
We break down a RM100,000 loan over seven years to show how reducing balance interest saves you money.
14-11-2025
Genting Highlands Set To Introduce Vehicle Fee to Boost Safety
Motorists heading to Genting Highlands will soon pay a fee to fund maintenance and safety on the 24 km private road.
13-11-2025
Show More
trending_flat