Link Copiedcheck_circle
Auto News

North-South Expressway will be temporarily closed tomorrow from 10am to 2pm

Jesica Sendai

Share via


To all highway users who are planning to travel tomorrow on Wednesday November 30, do plan your journey as PLUS announces that there will be a temporary closure of NSE’s Ipoh Utara-Selatan stretch between 10am and 2.30pm to construct a highway Emergency Response Exercise.   

During the closure, southbound highway drivers from the north/Kuala Kangsar will be routed to the Ipoh Utara Toll Plaza and advisable to take the FT240 Jelapang-Ampang slip road. Highway travellers travelling south should re-enter the NSE through the Ipoh Selatan Toll Plaza. 

According to the Chief Operating Officer of PLUS, Datuk Zakaria Ahmad Zabidi, “Safety of highway users is always our top priority. Therefore, emergency response exercises are conducted from time to time to measure and evaluate the level of preparedness of PLUS personnel and other agencies to ensure the safety of highway users is in good hands.”

Aside that, the Emergency Response Exercise will also involve various agencies such as the Malaysian Highway Authority, the Police, Road Transport Department, Fire and Rescue Department, Department of Environment, Civil Defence, MERS 999, National Security Council, Ministry of Health of Malaysia, MIROS, Edgenta Infrastructure Services (EIS) and many more.

Just so you know, the Emergency Response Exercise aims at gauging the readiness and response by PLUS, emergency teams and related agencies in managing emergency situations on the highway.

All highway users are advised to obey all traffic signages and instructions given by PLUS personnel throughout the exercise. For more traffic information or assistance during emergencies, highway users can contact PLUSLINE at 1800-88-0000 or click here.



Tagged:

NSE
NSE EXPRESSWAY
Share This Article

Written By

Jesica Sendai

from 9 to 5 grinder to 'racing' her way in the automotive industry through editorial work.

Share via

Related News

Auto News
A Trailer Ram over a vehicle at North South Highway

A Trailer Ram over a vehicle at North South Highway

Women dies after car hits trailer near Sg Buloh bay.

14-11-2022
Auto News
Police And PLUS Start Smartlane Routes For Holiday Traffic

Police And PLUS Start Smartlane Routes For Holiday Traffic

Police and PLUS have activated two smartlane routes on the NSE to alleviate traffic.

25-04-2023

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.