Link Copiedcheck_circle
Auto News

5 Rapid KL MRT Stations Repair Works Commences - Completes On 16 December

Kumeran Sagathevan

Share via


Prasarana, the concession holder for Rapid line of services posted yesterday all the fixes it was undertaking to the long broken facilities at several of its MRT stations. This comes after the newly appointed Minister of Transport Anthony Loke took it upon himself to conduct a “spot check” last week on the rail services level of comfort and safety of the facilities.


Based on Rapid KL’s social media post, there were five facilities where the first round of facility refurbishment was conducted. First being the escalator handrail repair works at the National Museum to KL Sentral passenger walkway on 14 December.




The second was the step chain replacement for escalator no five at Kajang MRT station to be completed by 16 December while the third was the step chain replacement at Kota Damansara MRT station on escalator no one due to be completed by 16 December too.


Forth location undergoing repair works would be the Sri Raya MRT stations escalator which had its handrail and balustrade bearings replaced on 14 December and the final location being the Taman Connaught MRT station which had its lift core roof refurbished also on 14 December.




Rapid KL moving forward would continue to closely engage public complaints and constantly work to upkeep its facilities for the convenience of the users. Anthony Loke in a press statement today told BERNAMA that he is happy at the speed Rapid KL is working in undertaking all the repair works. He further stated that all the public facilities maintenance must be made a culture to ensure these facilities are in good working order. 



Gallery

Tagged:

Prasarana
Rapid Rail
Rapid KL
YB Anthony Loke
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

Ten LRT KJ Line Stations Set for Upgrade – Open From 9 AM on Weekends

Ten LRT stations on the Kelana Jaya line will be upgraded, and their operation times will be affected on weekends.

28-07-2025
Auto News

Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included

The Rapid KL On-Demand service has been expanded to five new zones, including Cyberjaya and Putrajaya.

17-06-2025
Auto News

Rapid KL Boosts Peak Hours Operations Ahead of ASEAN Summit

Rapid KL extends peak hours train frequency to support commuters during the ASEAN Summit.

Auto News

Cabinet Committee Set To Tackle Road Congestion and Safety in 2025

JK-MKKJR outlines major infrastructure and enforcement plans to reduce traffic issues and accidents.

Auto News

Platform Automatic Gate System At KL Sentral & Tun Sambathan Now Operational

Prasarana announced that PAGS are now fully operational at KL Sentral and Tun Sambanthan stations.

26-11-2024
Auto News

Prasarana Updates Peak Hour Operations For Ramadan

Prasarana has announced that the peak hours for its rail and bus services will be extended throughout Ramadan.

12-03-2024
Auto News

Five LRT3 Stations Set To Be Operational In 2027

Five Light Rail Transit Line 3 (LRT3) stations that were previously cancelled should be operational by 2027, says Loke.

11-01-2024
Auto News

Prasarana Will Enable Credit And Debit Card Options At Rail Stations By July

Prasarana plans to enable credit and debit card payments at ticketing counters by July.

07-12-2023

Latest News

Auto News

BYD Sees 2025 YTD Sales Total Reach 11,097 Units – 70% YoY Up From 2024

BYD Cars Malaysia discloses its 2025 YTD toral sales have reached 11,097 units, marking a 70% YoY increase from 2024.

14-11-2025
Auto News

KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA’s Aerotrain will be suspended nightly from 9PM to 7AM starting Nov 15 for reliability upgrades.

14-11-2025
Auto News

Kelana Jaya LRT Weekend Disruptions For Upgrades

Rapid KL will upgrade the Kelana Jaya Line signalling system on Nov 15–16 and 29–30.

14-11-2025
Auto News

GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain

GWM Malaysia strengthens local partnerships and production to support the nation’s new-energy mobility ambitions.

Auto News

Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka

Mitsubishi Motors Malaysia, together with Eon Auto Mart, announces the relocation and upgrade of its outlet in Melaka.

14-11-2025
Auto News

PLUS Implements Night Contra-Flow On Elite Highway For Pipe Work

Motorists on the Elite Highway should expect a contra-flow from Nov 17–20 for pipe work.

14-11-2025
Auto News

Flat Rate, Rule of 78, Reducing Balance: How Hire-Purchase Loans Really Work

We break down a RM100,000 loan over seven years to show how reducing balance interest saves you money.

Auto News

Genting Highlands Set To Introduce Vehicle Fee to Boost Safety

Motorists heading to Genting Highlands will soon pay a fee to fund maintenance and safety on the 24 km private road.