Link Copiedcheck_circle
Auto News

Stellantis Aims To Expand Footprint In Malaysia With EV Launch

Anis

Share via

Untitled-design---2023-12-26T124900.831.png

Stellantis is reportedly testing models from other brands such as Opel, Alfa Romeo, and DS.

Stellantis NV, a well-known global automaker, has announced plans to launch its first electric vehicle (EV) in Malaysia by 2024, as well as the launch of additional brands that will have a significant impact on Malaysia's automotive landscape. 

In addition to Peugeot and Citroen models, the company is testing models from other brands such as Opel, Alfa Romeo, and DS, paving the way for a broader product range in the country, The Star reported.

Untitled-design---2023-12-26T125109.681.png

Stellantis manufacturing plant in Gurun, Kedah.


By choosing to redefine Bermaz Auto Bhd, its local partner, as a super dealer, Stellantis is able to take direct control of sales and distribution, resulting in a more streamlined and productive organizational structure.
Daniel Gonzalez, COO of Stellantis for general distributors and ASEAN, demonstrated the company's dedication to the Malaysian market by announcing plans to introduce the new Peugeot 408 by April of the following year.
Stellantis also intends to launch Jeep models for the domestic and international markets, indicating a substantial growth in the brand's portfolio. Untitled-design---2023-12-26T125038.962.png

On the EV front, the cars that will be assembled in Malaysia will be based on the STLA Medium platform, which features vehicles that can travel up to 700 kilometers on a single charge.
Stellantis has also focused on producing battery packs and battery electric vehicles (BEVs) locally. A possible RM5 billion investment in local sourcing might promote economic expansion and job creation.
In order to launch the STLA Medium platform in the ASEAN area, the company also intends to invest more than RM2 billion. Plans for this expansion also call for hiring more engineers, achieving energy autonomy, and raising the production capacity of the Gurun plant. Untitled-design---2023-12-26T124957.054.png

Tagged:

Stellantis NV
Bermaz Auto Berhad
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News
Report: New Mazda Models Could Rev Up BAuto’s Prospects

Report: New Mazda Models Could Rev Up BAuto’s Prospects

Despite analyst’s downgrades, Carz.com.my sees strong potential in BAuto's upcoming Mazda models.

Auto News
Kenanga IB Downgrades Auto Sector - Subsidies, Speculation & Stagnation

Kenanga IB Downgrades Auto Sector - Subsidies, Speculation & Stagnation

Kenanga IB downgrades Malaysia’s auto sector outlook to neutral as market uncertainty deepens.

Auto News
Bermaz Auto Eyes Recovery Amid Competitive Pressures

Bermaz Auto Eyes Recovery Amid Competitive Pressures

Bermaz Auto braces for recovery with new model launches and EV expansion, despite competition from Chinese automakers.

EV
Deepal S07 Secures ANCAP 5-Star Rating Ahead of Malaysian Launch

Deepal S07 Secures ANCAP 5-Star Rating Ahead of Malaysian Launch

The Malaysia-bound Deepal S07 secures top-tier ANCAP 5-star safety rating ahead of its planned Q2 2025 launch.

New Car
Launched: Mazda CX-5 MazdaSports Limited Edition

Launched: Mazda CX-5 MazdaSports Limited Edition

The Mazda CX-5 SUV is now exclusively available with a special MazdaSports Limited Edition package for an extra RM12,000.

EV
XPeng G6 ROI Opening In 7 Days? BAuto Poised On Building Brand Equity

XPeng G6 ROI Opening In 7 Days? BAuto Poised On Building Brand Equity

BAuto confident in growing XPeng brand by creating consumer confidence as it did through Kia and Mazda brands.

EV
Thai-Bound XPeng G6 Detailed – Up To 755 KM Range, Est. From THB 1.5 million+

Thai-Bound XPeng G6 Detailed – Up To 755 KM Range, Est. From THB 1.5 million+

XPeng G6 EV SUV specs and prices detailed for Thai market – could Malaysia get similar offer later?

20-03-2024
New Car
Launched: Mazda CX-5 Facelift – 5 Variants, 4 Powertrains, From RM144,469.20 Onwards

Launched: Mazda CX-5 Facelift – 5 Variants, 4 Powertrains, From RM144,469.20 Onwards

Bermaz Motor officially announces availability of face-lifted Mazda CX-5 crossover range priced between RM144.469.20 and RM192,060.40.

29-01-2024

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.