Link Copiedcheck_circle
Auto News

CNY 2024: Toll Free Travel From 8 To 9 February

Kumeran Sagathevan

Share via

Toll-Free-CNY-2024-(1).png


In ushering in the upcoming Chinese New Year celebrations, Public Works Minister Datuk Seri Alexander Nanta Linggi has announced toll exemptions exclusively for private vehicles (Class 1) for two days.

The toll free travel period would run from midnight 12.01AM, 8 February till 11.59PM 9 February 2024. This toll exemption would apply to all tolled roads nationwide with exception to the Sultan Iskandar Building (BSI) and Tanjung Kupang border crossing toll plazas.

According to Nanta, "This decision reflects the unity government's dedication to supporting citizens and alleviating their financial burdens”. He further added that this exercise would cost the government approximately RM42.99 million.


Toll-Free-CNY-2024-(3).jpgToll-Free-CNY-2024-(2).jpg


The minister further advised travellers to plan their journey in accordance with Travel Time Advisory by respective highway operators. Motorists are also advised to ensure they have sufficient credit in their Touch ‘n Go card.

Although the government is announcing this toll free travel period, road users are still required to tap-in and out at all toll plazas as a measure of calculating the amount the government would need to reimburse the toll concessionaires.

Travellers can also stay informed about highway traffic conditions through the Malaysian Highway Authority's social media channels.


Tagged:

Public Works Minister Datuk Seri Alexander Nanta Linggi
Toll Free
CNY 2024 Toll Free
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
Nanta: Barrier-Free ANPR Toll System Still at RFP Stage

Nanta: Barrier-Free ANPR Toll System Still at RFP Stage

The Works Ministry is inviting proposals for an ANPR-based barrier-free MLFF toll system.

Auto News
SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah

SSLR2 Highway Launched: RM7.6b Project Will Link Sarawak and Sabah

The 335km Sarawak–Sabah Link Road Phase 2 will connect key towns across northern Sarawak into Sabah.

Auto News
Govt Yet to Decide on Toll-Free Travel for Next Year’s Festive Season

Govt Yet to Decide on Toll-Free Travel for Next Year’s Festive Season

Govt has yet to decide on bringing back toll-free travel for next year’s festive season, says the Works Minister.

25-07-2025
Auto News
East-West Highway Safe, More Upgrades Coming - Works Minister

East-West Highway Safe, More Upgrades Coming - Works Minister

The Works Ministry told Bernama the JRTB is safe for users, but more upgrades are on the way under the 13th Malaysia Plan.

22-07-2025
Auto News
New Marang Bridge 55% Done, Set to Finish By Jan 2027

New Marang Bridge 55% Done, Set to Finish By Jan 2027

The RM338mil Marang Bridge project is over halfway complete and on track for January 2027.

15-07-2025
Auto News
KKR Only Gets Half of RM4B Needed for Road Repairs – Ahmad Maslan

KKR Only Gets Half of RM4B Needed for Road Repairs – Ahmad Maslan

The Public Works Ministry only received half of the RM 4 billion required to repair the damaged roads in Malaysia.

30-06-2025
Auto News
RM4b Needed, Critical Road Repairs Come First

RM4b Needed, Critical Road Repairs Come First

Road repairs will be done in stages due to budget limits, with priority on the most severe sections.

19-06-2025
Auto News
Bukit Kayu Hitam ICQS-Sadao CIQ Project On Track For Completion This Year

Bukit Kayu Hitam ICQS-Sadao CIQ Project On Track For Completion This Year

Bukit Kayu Hitam ICQS-Sadao CIQ project is 47% finished and expected to be completed by Sept.

06-05-2025

Latest News

Auto News
BYD Sees 2025 YTD Sales Total Reach 11,097 Units – 70% YoY Up From 2024

BYD Sees 2025 YTD Sales Total Reach 11,097 Units – 70% YoY Up From 2024

BYD Cars Malaysia discloses its 2025 YTD toral sales have reached 11,097 units, marking a 70% YoY increase from 2024.

14-11-2025
Auto News
KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA Aerotrain To Stop Nightly From Nov 15 For Reliability Upgrades

KLIA’s Aerotrain will be suspended nightly from 9PM to 7AM starting Nov 15 for reliability upgrades.

14-11-2025
Auto News
Kelana Jaya LRT Weekend Disruptions For Upgrades

Kelana Jaya LRT Weekend Disruptions For Upgrades

Rapid KL will upgrade the Kelana Jaya Line signalling system on Nov 15–16 and 29–30.

14-11-2025
Auto News
GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain

GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain

GWM Malaysia strengthens local partnerships and production to support the nation’s new-energy mobility ambitions.

Auto News
Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka

Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka

Mitsubishi Motors Malaysia, together with Eon Auto Mart, announces the relocation and upgrade of its outlet in Melaka.

14-11-2025
Auto News
PLUS Implements Night Contra-Flow On Elite Highway For Pipe Work

PLUS Implements Night Contra-Flow On Elite Highway For Pipe Work

Motorists on the Elite Highway should expect a contra-flow from Nov 17–20 for pipe work.

14-11-2025
Auto News
Flat Rate, Rule of 78, Reducing Balance: How Hire-Purchase Loans Really Work

Flat Rate, Rule of 78, Reducing Balance: How Hire-Purchase Loans Really Work

We break down a RM100,000 loan over seven years to show how reducing balance interest saves you money.

Auto News
Genting Highlands Set To Introduce Vehicle Fee to Boost Safety

Genting Highlands Set To Introduce Vehicle Fee to Boost Safety

Motorists heading to Genting Highlands will soon pay a fee to fund maintenance and safety on the 24 km private road.