Link Copiedcheck_circle
Auto News

Grand Saga Highway Announces Improved New Morning Tidal Flow

Thoriq Azmi

Share via

web_Grand-Saga-Toll-Plaza_FB.jpg

Batu 11 Toll Plaza of the Cheras-Kajang Grand Saga Highway. The highway concessionaires will be implementing a new morning tidal flow scheme starting next week on June 18.


Residents and commuters who frequent the Cheras-Kajang Grand Saga Highway, take note. Said highway operators announced earlier today via its official Facebook page that it will implement a new and improved morning tidal flow system.

This effort, according to said highway concessionaires, is aimed at enhancing the efficiency of peak hour traffic flow. This new morning tidal flow scheme will be applied starting Tuesday next week (June 18), and will be applied Mondays through Fridays from 6:30AM to 8:30AM.

As detailed in the map provided, the morning KL-bound tidal flow has been enhanced with a new Entry Point 1 at KM 14.9, which is just after the Batu 11 Toll Plaza. 


448277731_973626004557516_8569705172044428959_n.jpg

The new system sees the old tidal flow entry point at KM 13.1 closed and replaced with new Entry Point 1 at KM 14.9, and Entry Point 2 at KM 12.3.


Effectively, Entry Point 1 now grants much earlier access to the tidal flow for motorists and commuters coming from Kajang. Prior to this, motorists must traverse all the way to KM 13.1, or just after the NSK hypermarket, which is where the current tidal flow entry point sits.

Said original KL-bound tidal flow entry point at KM 13.1 will now be closed and replaced with a new Entry Point 2 located at KM 12.3 where the Kajang-bound Batul 9 Toll Plaza sits.

Effectively, Entry Point 2 serves to continue granting tidal flow access to motorists coming out of Exit 704 (Bandar Tun Hussein Onn/Taman Cheras Perdana), Exit 703 (Telekom Intersection), and Exit 702 (Hulu Langat Intersection).

As for motorist and commuters from Kajang wishing to access Exit 703 and Exit 702, or the SUKE Highway (E19) on-ramps before and after the PDRM Academy, Grand Saga Highway operators advise to remain on the main pathway instead of the morning tidal flow lane.

Motorists and commuters seeking more details about this new morning tidal flow scheme can get in touch with Grand Saga Highway operators via its official Facebook and X (Twitter) pages online, or by calling its hotline at 03-9075 0505.



Tagged:

Grand Saga Highway
Cheras-Kajang Highway
morning tidal flow
Share This Article

Written By

Thoriq Azmi

Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/

Share via

Related News

Auto News

Six More Highways to Implement Open Payment System – PLUS, SPE, etc.

Starting this September, six more highways are set to implement the open payment system for their tolls.

17-05-2024

Latest News

Auto News

2026 Proton Saga Garners Over 10,000 Bookings In Just Five Days!

All-new 2026 Proton Saga charts just over 10,000 bookings in just 5 days - one booking placed every 43 seconds!

18-11-2025
Auto News

Lamborghini Among 92 Luxury Cars Seized In KL JPJ Crackdown

JPJ’s Ops Luxury has targeted high-end offenders since July, issuing over 400 notices and seizing 92 of luxury vehicles.

18-11-2025
Auto News

Lady Driver Cheats Death Following ECRL Construction Beam Collapse in Batu Caves

Lady driver narrowly escaped death as massive steel structure from the ECRL project collapsed onto her car along the MRR2.

Auto News

Penang Police Strengthen Security For Mutiara LRT Project

Penang police are coordinating with agencies to ensure the Mutiara LRT project proceeds safely without compromising public security.

18-11-2025
Auto News

Works Ministry Reviewing ANPR Toll Payments With JustGo App

Govt is reviewing the ANPR system paired with the JustGo app to streamline toll payments and reduce congestion.

18-11-2025
Auto News

Activate Your X50 RFID and Win Up to RM500 in Toll Credits

Activate your Proton X50’s built-in Touch ’n Go RFID and stand a chance to earn up to RM500 in toll rebates.

Auto News

Trans Borneo Railway Feasibility Study To Conclude By Mid-2026

Govt has begun a feasibility study for the Trans Borneo Railway, which could link Sabah, Sarawak, Brunei and Kalimantan.

18-11-2025
Auto News

LRT3 Enters Final Testing Phase, Govt Targets Dec 31 Opening

LRT3 line is now in its final round of safety and reliability tests, with its launch date hinging on Dec results.

18-11-2025