Link Copiedcheck_circle
Auto News

Johor On Track To Become Major Rail Hub In Malaysia

Anis

Share via

Untitled-design---2025-03-24T133237.905.png
Johor is set to become a major rail hub in Malaysia in the coming years, according to State Works, Transportation, Infrastructure, and Communication Committee Chairman Mohamad Fazli Mohamad Salleh.

Mohamad Fazli, who spoke to The Star believes that the completion of two ongoing rail projects in the state will improve connectivity and drive economic development.

“The first is the Gemas-Johor Baru Electrified Double Track Rail Project (Gemas-JB EDTP), which officially began construction in January 2018. “This project aims to upgrade the existing single-track railway between Gemas and Johor Baru to a double-track electrified system, spanning approximately 192km and covering key districts such as Segamat, Kluang, Kulai and Johor Baru,” he added.

sddefault-(1).jpg
The Gemas-JB EDTP, which is expected to be completed by the third quarter of this year, would supplement the Electric Train Service (ETS), which operates from Padang Besar in Perlis to Gemas in Negri Sembilan.

According to Mohamad Fazli, the Segamat station is the first in Johor to open since March 15, and additional stations along the route will follow suit before reaching the last stop at JB Sentral.

He noted that there are 11 stops along the 192-kilometer route between Gemas and Johor Baru, including areas such as Segamat, Kluang, and Kulai, including Segamat, Genuang, Labis, Bekok, Paloh, Kluang, Mengkibol, Renggam, Layang-Layang, Kulai, and Kempas Baru.

Untitled-design---2025-03-24T133036.781.png

Speaking of the RTS Link, the State Works Chairman says the project, which connects Bukit Chagar in Johor Baru to Woodlands North in Singapore, is expected to be a game changer.

He also stated that efforts are underway to implement a unified immigration clearance system for the RTS to allow smoother cross-border mobility. An elevated Automated Rapid Transit (E-ART) system has been suggested for Johor Bahru to alleviate traffic congestion, especially as the RTS nears completion.

rts-link.jpg


“Together with the Gemas-JB EDTP, RTS Link, commuter service and hopefully the E-ART, Johor will be recognised as a rail hub in the country,” Mohamad Fazli added.

Tagged:

Johor Bahru rail developments
major rail hub in Malaysia
Johor Bahru-Singapore Rapid Transit System (RTS)
Gemas-JB EDTP
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News

RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel

RTS Link operators are finalising fare strategies to encourage more commuters to switch from private vehicles to public transport.

Auto News

QR Codes Coming for Drivers at Johor Checkpoints

Malaysia plans to expand QR code immigration clearance to car drivers, aiming to ease congestion at border checkpoints.

Auto News

JB-SG RTS Link Fares Will Consider Currency Exchange

RTS Link ticket fares will be finalized by January 2027, considering factors like Malaysia-Singapore exchange rates.

27-02-2025
Auto News

Govt Calls For Bids For Elevated ART In JB

Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.

14-02-2025
Auto News

RTS Link 95% Complete, Service Operation Dec 2026

The Johor Bahru-Singapore RTS is 95% complete as of last November.

Auto News

Loke: RTS Link 83% Complete & On Schedule For 2027 Operation

Loke recently announced that the RTS Link is 83% complete, with ongoing efforts to mitigate traffic congestion in the surrounding area.

Auto News

Faizal: Johor ART Necessary To Minimise RTS Station Congestion

The ART system in Johor Bahru can be an immediate solution to manage RTS Link congestion before completion of the LRT line.

Latest News

Auto News

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.