Link Copiedcheck_circle
Auto News

QR Codes Coming for Drivers at Johor Checkpoints

Kumeran Sagathevan

Share via

uses-artificial-intelligence-(AI)-to-detect-paint-flaws-on-the-cars-it-assembles-at-its-facilities-in-the-United-States.-(85).png


The Malaysian government will expand QR code immigration clearance at the Sultan Iskandar Building (BSI) and Sultan Abu Bakar Complex (KSAB) in Johor, targeting car drivers this year.

Deputy Prime Minister Datuk Seri Fadillah Yusof said this follows the successful use of QR codes for bus passengers and motorcyclists, easing congestion at the Johor-Singapore Causeway.


481277542_1190322629327095_4454720006250671227_n.jpg


"By integrating technology and improving infrastructure, immigration clearance now takes only three seconds per user," he said after chairing the Special Committee Meeting to Address Congestion on the Johor Causeway.

With Malaysia set to chair ASEAN in 2025 and boost tourism and investment, the government is taking urgent steps to address traffic congestion.

The committee agreed to extend these measures nationwide, ensuring smoother entry at all major international checkpoints.


480923368_1051037647054507_5428770025316273269_n.jpg


Home Minister Datuk Seri Saifuddin Nasution Ismail confirmed QR codes have increased motorcycle clearance from 90 to 150 per lane every 15 minutes at BSI and KSAB.

"Next, we move our focus on car users, as they now face the worst congestion," he said, adding that solutions are also being explored for entry points like Rantau Panjang, Sadao, Bukit Kayu Hitam, Padang Besar, and major airports.


Untitled-design---2023-04-18T215748.117.png


He also updated on the Johor Bahru-Singapore Rapid Transit System (RTS) Link, set to be completed by Dec 31, 2026, carrying 10,000 to 20,000 passengers per hour.

"Early preparations are crucial to manage traffic at Bukit Chagar and the RTS location in Singapore," he added.

These efforts aim to streamline immigration, improve travel efficiency, and enhance Johor-Singapore connectivity.


Source: BERNAMA


Tagged:

Causeway QR Code
CIQ QR Code
Minister of Energy Transition and Water Transformation (PETRA), Datuk Seri Fadillah Yusof
Johor Bahru-Singapore Rapid Transit System (RTS)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

EV

DPM Reaffirms 10,000 EV Chargers Target, But Are We REALLY On Track?

To hit its ambitious target of having 10,000 EV chargers up year end, Malaysia must do more than count chargers — it must chart a reliable course forward.

EV

PETRA Pledges 10,000 EV Charging Stations by Year-End

Fadillah stresses the need for EV chargers in urban and rural areas, aims for 10,000 stations nationwide by year-end.

Auto News

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News

RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel

RTS Link operators are finalising fare strategies to encourage more commuters to switch from private vehicles to public transport.

Auto News

Johor On Track To Become Major Rail Hub In Malaysia

Johor is set to become a major rail hub in Malaysia underpinned by ongoing rail developments.

24-03-2025
Auto News

JB-SG RTS Link Fares Will Consider Currency Exchange

RTS Link ticket fares will be finalized by January 2027, considering factors like Malaysia-Singapore exchange rates.

27-02-2025
Auto News

Govt Calls For Bids For Elevated ART In JB

Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.

14-02-2025
Auto News

RTS Link 95% Complete, Service Operation Dec 2026

The Johor Bahru-Singapore RTS is 95% complete as of last November.

Latest News

Auto News

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.

Auto News

30 Kindergarten Kids, Teachers Involved In Bus Crash; JPJ To Launch Audit

JPJ will audit the bus operator after a crash near UPM injured kindergarten kids and a teacher.

04-08-2025