Link Copiedcheck_circle
Auto News

New Mitsubishi 3S Centre Opens in Kajang, Selangor

Thoriq Azmi

Share via

Photo-1.jpg

MMM sees its network grow yet again as it welcomes a new Mitsubishi 3S Centre located in Kajang, Selangor into its network.


Mitsubishi Motors Malaysia (MMM) sees its network grow yet again this week as it adds another new 3S (sales, service and spare parts) centre into its network. This time, said new outlet is in Kajang, Selangor.

Operated by authorised dealers Millennium Autohaus Sdn Bhd, this new Mitsubishi 3S Centre is located at Lot 1872A, Jalan Semenyih in Kajang, Selangor. The outlet is built on a 15,800 square-foot land area with a 9,600 square-foot facility.

Both MMM and Millennium Autohaus adds that the newly opened showroom is designed to deliver a complete Mitsubishi brand experience, offering both sales and after-sales services with enhanced convenience for customers.

On display in the outlet’s showroom are MMM’s current offerings in the form of the latest third-gen Triton pick-up truck, as well as the face-lifted Xpander 7-seat crossover MPV. You can read up about both by clicking here and here.


Photo-2.jpgPhoto-3.jpg

The new outlet noted is operated by authorised dealers Millennium Autohaus Sdn Bhd.


“This showroom launch reflects our mutual commitment to providing exceptional customer service and expanding Mitsubishi's footprint across Klang Valley,” remarked Shinya Ikeda, CEO of MMM, during the dealership’s official opening ceremony.

Notably, this is the second Mitsubishi brand outlet established by Millennium Autohaus, with its first located in Kota Damansara that first opened back in Sept 2021. It also now stands as MMM’s 19th 3S centre that’s now operational in the Klang Valley region.

Altogether, MMM now boasts a network that consists of 63 showrooms and 63 service centres nationwide, with 8 of the former being full-fledge 4S (sales, service, spare parts, and body & paint) centres.




Tagged:

Mitsubishi Motors Malaysia (MMM)
Mitsubishi 3S Centre
Kajang
Selangor
Millennium Autohaus Sdn Bhd
Share This Article

Written By

Thoriq Azmi

Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/

Share via

Related News

Auto News

11-06-2025
New Car

10-01-2025
Auto News

19-11-2024
Auto News

18-10-2024
Auto News

17-10-2024
Auto News

15-10-2024
Review

30-09-2024
New Car

12-09-2024

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.