Link Copiedcheck_circle
Auto News

Loke: Accessibility, Safety Upgrades Coming To LRT Stations

Kumeran Sagathevan

Share via

Untitled-design---2025-07-04T163921.973-full_normal.jpg


The absence of platform barriers at many Light Rail Transit (LRT) stations has been flagged as a safety concern, especially for passengers with disabilities.

Transport Minister Anthony Loke said the issue stems from older LRT stations being built without physical barriers between the platforms and train tracks. In contrast, newer MRT stations are fully equipped with safety systems that include these barriers.

To address the gap, Loke said operator Prasarana is now looking into adding platform barriers at older LRT stations. While they might not completely close the space between trains and platforms, the aim is to reduce risks by introducing some form of physical separation.


Loke-DashCam-(7).jpg


Loke however also admitted this won’t be a simple fix. Retrofitting existing stations would require a major redesign, involve high costs and take time to carry out.

He was speaking in the Dewan Rakyat in response to a question from Khairil Nizam Khirudin (PN Jerantut), who brought up the tragic death of a visually impaired man who fell onto the tracks and was struck by a train at the Wangsa Maju LRT station in Feb.

As a short-term solution, auxiliary police officers have been deployed at key stations. These personnel are specially trained to be more alert and responsive to the needs of disabled passengers, helping to prevent similar accidents.


Untitled-design---2025-07-04T163954.926-full_normal.jpg


Loke also stressed that the government remains committed to making public transport safer and more accessible for everyone. That includes ongoing upgrades to facilities for people with disabilities and the installation of lifts at older and rural KTM stations.

He added that rail operators continue to train their frontline staff to provide assistance with professionalism, efficiency, and empathy, ensuring passengers with special needs are treated with care and respect.


Source: MalayMail

Tagged:

Light Rail Transit (LRT) platform barrier
platform barriers
Minister of Transport YB Anthony Loke
Light Rail Transit (LRT)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
Aerotrain Disruption A Minor Glitch, ETS3 Project On Track - Loke

Aerotrain Disruption A Minor Glitch, ETS3 Project On Track - Loke

KLIA’s Aerotrain glitch was a minor software bug, not a breakdown, while ETS3 to Johor Bahru is on track, says Transport Minister.

07-08-2025
Auto News
ETS Segamat–Johor Bahru Extension is On Track, No Delays – MoT

ETS Segamat–Johor Bahru Extension is On Track, No Delays – MoT

Transport Minister Anthony Loke says the ETS extension project from Segamat to Johor Bahru is on track with no delays.

06-08-2025
Auto News
LRT3 Hits 99% Completion - Loke

LRT3 Hits 99% Completion - Loke

LRT3, which will connect Bandar Utama to Johan Setia, is 99% complete and on track for launch, says Transport Minister.

30-07-2025
Auto News
Bas.My Launched with Focus on Accessibility and Affordability

Bas.My Launched with Focus on Accessibility and Affordability

Loke: 48 brand-new buses and 13 routes, Bas.My is setting a new standards for stage buses in Kedah.

Auto News
Turun Anwar Rally: Loke Urges Train Use, PDRM May Divert 16 Roads

Turun Anwar Rally: Loke Urges Train Use, PDRM May Divert 16 Roads

Transport Minister and PDRM urges public to plan ahead and use public transportation to ease congestion caused by Turun Anwar rally.

Auto News
MRT3 Gets MOT Approval, Completion Set for 2026

MRT3 Gets MOT Approval, Completion Set for 2026

The 51.6 KM MRT Circle Line is officially approved, full rollout expected by end of 2026.

Auto News
JPJ Plans Major Reform For Kejara System

JPJ Plans Major Reform For Kejara System

JPJ is wrapping up its review of long-awaited improvements for the Kejara system.

Auto News
Loke: No ETS For East Coast

Loke: No ETS For East Coast

Transport Minister Loke confirms ETS will not be extended to the east coast due to single-track, unelectrified rail lines.

Latest News

Auto News
Agong Gets To Grips With Aurus Senat In Russia

Agong Gets To Grips With Aurus Senat In Russia

Agong Sultan Ibrahim gets behind the wheel of the Aurus Senat - Russia’s homegrown presidential limo.

Auto News
JPJ Will Seize Vehicles From Firms Hiring Foreign Commercial Drivers

JPJ Will Seize Vehicles From Firms Hiring Foreign Commercial Drivers

JPJ will get tougher on companies hiring foreigners to drive commercial vehicles, with the possibility of vehicle seizure.

08-08-2025
Auto News
Loke: Accessibility, Safety Upgrades Coming To LRT Stations

Loke: Accessibility, Safety Upgrades Coming To LRT Stations

Prasarana studying plans to install barriers at older LRT stations for enhanced passenger safety.

Auto News
Grab Halts Mandarin Driver Option After Backlash

Grab Halts Mandarin Driver Option After Backlash

Grab has paused its Mandarin-speaking driver option after backlash, saying it was only a test to help Chinese tourists.

08-08-2025
Auto News
RM20 Million Allocated to Upgrade Federal Highway Motorcycle Lanes – KKR

RM20 Million Allocated to Upgrade Federal Highway Motorcycle Lanes – KKR

A total of RM20 million will be allocated to upgrade the motorcycle lanes on the Federal Highway, the Works Ministry says.

08-08-2025
Auto News
Over 39,000 Road Issues Flagged On MyJalan App Since Launch

Over 39,000 Road Issues Flagged On MyJalan App Since Launch

MyJalan app logs over 39,000 complaints, but most fall outside federal jurisdiction, says Deputy Works Minister.

07-08-2025
Auto News
PLUS Eyes MLFF ANPR Toll Trials This Month - JustGo Digital App

PLUS Eyes MLFF ANPR Toll Trials This Month - JustGo Digital App

PLUS will begin trials for automatic number plate recognition (ALPR) toll system with its JustGo Digital App, part of proposed MLFF system, across nine toll plazas this month.

Auto News
Kelana Jaya Line Signalling Works Delayed, Phase 2 Work Starts Sept 6

Kelana Jaya Line Signalling Works Delayed, Phase 2 Work Starts Sept 6

Kelana Jaya Line Phase 2 and 3 signalling works will now begin on Sept 6, with select stations opening later on affected dates.