Link Copiedcheck_circle
Auto News

Loke: Accessibility, Safety Upgrades Coming To LRT Stations

Kumeran Sagathevan

Share via

Untitled-design---2025-07-04T163921.973-full_normal.jpg


The absence of platform barriers at many Light Rail Transit (LRT) stations has been flagged as a safety concern, especially for passengers with disabilities.

Transport Minister Anthony Loke said the issue stems from older LRT stations being built without physical barriers between the platforms and train tracks. In contrast, newer MRT stations are fully equipped with safety systems that include these barriers.

To address the gap, Loke said operator Prasarana is now looking into adding platform barriers at older LRT stations. While they might not completely close the space between trains and platforms, the aim is to reduce risks by introducing some form of physical separation.


Loke-DashCam-(7).jpg


Loke however also admitted this won’t be a simple fix. Retrofitting existing stations would require a major redesign, involve high costs and take time to carry out.

He was speaking in the Dewan Rakyat in response to a question from Khairil Nizam Khirudin (PN Jerantut), who brought up the tragic death of a visually impaired man who fell onto the tracks and was struck by a train at the Wangsa Maju LRT station in Feb.

As a short-term solution, auxiliary police officers have been deployed at key stations. These personnel are specially trained to be more alert and responsive to the needs of disabled passengers, helping to prevent similar accidents.


Untitled-design---2025-07-04T163954.926-full_normal.jpg


Loke also stressed that the government remains committed to making public transport safer and more accessible for everyone. That includes ongoing upgrades to facilities for people with disabilities and the installation of lifts at older and rural KTM stations.

He added that rail operators continue to train their frontline staff to provide assistance with professionalism, efficiency, and empathy, ensuring passengers with special needs are treated with care and respect.


Source: MalayMail

Tagged:

Light Rail Transit (LRT) platform barrier
platform barriers
Minister of Transport YB Anthony Loke
Light Rail Transit (LRT)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

New RM22.7M JPJ Kajang Office Set for 2027

The new RM22.7M JPJ Kajang office will feature modern facilities and improved services for the public by 2027.

23-09-2025
Auto News

Loke: KLIA Taxi Touting Betrays Nation’s Image

KLIA taxi touts overcharging tourists by up to RM400 are tarnishing Malaysia’s reputation.

Auto News

Use Of Three-Wheelers For Agriculture Subject To Regulations - MOT

MOT says three-wheeled motorcycles may be used for farming, but only with full compliance to safety and licensing rules.

25-08-2025
Auto News

Govt Plans to Add 50 New Train Sets for KTM ETS & Komuter Services

The government is planning to add 50 new train sets to meet growing demand for KTM ETS & Komuter services.

25-08-2025
Auto News

Langkawi LRT ‘Unrealistic’, Focus Stays on Penang LRT and ECRL - Loke

The government is pushing ahead with the Penang LRT and ECRL, but dismissed talk of a Langkawi LRT as unrealistic.

19-08-2025
Auto News

Malaysian Transport Safety Board Proposal Back on Table – MOT

The Ministry of Transport is drafting a policy to establish the Malaysian Transport Safety Board (MTSB).

13-08-2025
Auto News

Aerotrain Disruption A Minor Glitch, ETS3 Project On Track - Loke

KLIA’s Aerotrain glitch was a minor software bug, not a breakdown, while ETS3 to Johor Bahru is on track, says Transport Minister.

07-08-2025
Auto News

ETS Segamat–Johor Bahru Extension is On Track, No Delays – MoT

Transport Minister Anthony Loke says the ETS extension project from Segamat to Johor Bahru is on track with no delays.

06-08-2025

Latest News

Auto News

Amir Hamzah: No Daily Refuel Limits Under Budi95 For Now

Amir Hamzah: No limit on daily refuels, data analytics to monitor RM1.99 subsidy use to detect abuse.

Auto News

New RM22.7M JPJ Kajang Office Set for 2027

The new RM22.7M JPJ Kajang office will feature modern facilities and improved services for the public by 2027.

23-09-2025
Auto News

ECRL Project Hits 87% Completion by August 2025 – MoT

The ECRL project has recorded 87% overall completion as of August 2025, said Transport Minister Anthony Loke.

23-09-2025
Auto News

Amir Hamzah: No Back-to-Back Pumping of RM1.99 RON95 A Day

Amir Hamzah: Govt. won't allow multiple subsidised refuels in a day as BUDI95 takes effect Sept 30.

Auto News

Petron Lubricants Gains SIRIM Certification & Label

Petron Malaysia acquires SIRIM genuine product licence certification and label for engine lubricant product line-up.

23-09-2025
Auto News

Govt Will Allow Commercial RV Rentals from 2026 - Loke

Starting January 2026, RVs can be licensed for commercial use, making self-drive RV holidays safer and regulated.

23-09-2025
Auto News

BUDI95: RON95 Ban on Foreign Cars Still On, RM1.99 for Malaysians

BUDI95 keeps foreign-registered cars out of subsidised RON95, only Malaysians with local vehicles can pump at RM1.99 per litre.

Auto News

Rapid Rail Set To Launch Real-Time Crowd Tracking & AI Security

Rapid Rail will introduce a live tracker showing coach crowd levels so commuters can board with less stress.

23-09-2025