Link Copiedcheck_circle
Auto News

Trans Borneo Railway Feasibility Study To Conclude By Mid-2026

Anis

Share via

Untitled-design---2025-11-18T114714.132.png
The Transport Ministry has launched a feasibility study for the proposed Trans Borneo Railway, a project that could eventually link Sabah, Sarawak, Brunei and Indonesia’s Kalimantan. 

The study, which began in June, is expected to be completed by mid-next year, Transport Minister Anthony Loke said.

Consultants are engaging with federal ministries, state governments, agencies and industry players to gather feedback and assess local capacity. 

myy-ub-300324-cc-bulletrain-p1-(1).jpg
Discussions with Brunei and Indonesia will follow to ensure the project aligns with cross-border development plans.

“The government will evaluate the project proposal based on the findings of the feasibility study, which will cover various aspects including technical requirements, socio-economic benefits, cost considerations and the country’s long-term financial capacity,” Loke stated.

The Trans Borneo Railway was first proposed in 2015 by former prime minister Datuk Seri Najib Razak to improve connectivity across Borneo and make it easier to move people, goods and services.

RAIL_(1)-(1).png
Photo: Bernama. In April last year, Brunei-based Brunergy Utama Sdn Bhd announced plans to undertake the US$70 billion (RM330 billion) project in two phases, covering more than 1,600 kilometres with trains capable of reaching 350 km/h. 

Loke later clarified that the project remains a proposal and has not been awarded to any company. 

The feasibility study will give the government a clear picture of whether the railway is technically, financially and economically viable. 

SabahStateRailway-StationPapar-05a.jpg
If it goes ahead, the Trans Borneo Railway could be a game-changer for the region, boosting trade, connectivity and socio-economic development while linking key cities and communities across Borneo by rail for the first time.



Tagged:

Trans Borneo Railway
Trans Borneo Railway feasibility study
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Latest News

Auto News
Penang Police Strengthen Security For Mutiara LRT Project

Penang Police Strengthen Security For Mutiara LRT Project

Penang police are coordinating with agencies to ensure the Mutiara LRT project proceeds safely without compromising public security.

18-11-2025
Auto News
Works Ministry Reviewing ANPR Toll Payments With JustGo App

Works Ministry Reviewing ANPR Toll Payments With JustGo App

Govt is reviewing the ANPR system paired with the JustGo app to streamline toll payments and reduce congestion.

18-11-2025
Auto News
Activate Your X50 RFID and Win Up to RM500 in Toll Credits

Activate Your X50 RFID and Win Up to RM500 in Toll Credits

Activate your Proton X50’s built-in Touch ’n Go RFID and stand a chance to earn up to RM500 in toll rebates.

Auto News
Trans Borneo Railway Feasibility Study To Conclude By Mid-2026

Trans Borneo Railway Feasibility Study To Conclude By Mid-2026

Govt has begun a feasibility study for the Trans Borneo Railway, which could link Sabah, Sarawak, Brunei and Kalimantan.

18-11-2025
Auto News
LRT3 Enters Final Testing Phase, Govt Targets Dec 31 Opening

LRT3 Enters Final Testing Phase, Govt Targets Dec 31 Opening

LRT3 line is now in its final round of safety and reliability tests, with its launch date hinging on Dec results.

18-11-2025
Auto News
MOT: Kejara System Rebuilt for Real Enforcement by 2026

MOT: Kejara System Rebuilt for Real Enforcement by 2026

Revamped Kejara in 2026 will blacklist defaulters, unify summons rates, and enforce traffic rules consistently.

Auto News
Ahmad Maslan: Genting’s Planned Road Charge Is NOT a Toll

Ahmad Maslan: Genting’s Planned Road Charge Is NOT a Toll

Government cautions Genting against calling its proposed fee a toll to avoid public confusion.

Auto News
PLUS Unveils Five-Year Roadmap - AI, Clean Mobility and Climate Resilience

PLUS Unveils Five-Year Roadmap - AI, Clean Mobility and Climate Resilience

PLUS’s five-year plan embeds AI, climate resilience and large-scale EV charging to future-proof Malaysia’s main expressway.