RM1.8 billion allocated for federal roads maintenance this year
![]()
(Image source: Google)
Local newswire Bernama reports that the Works Ministry has allocated up to RM1.8 billion towards federal road maintenance. According to Senior Works Minister Datuk Seri Fadillah Yusof, RM150 million from said amount was for maintenance works for Pahang, Johor and Negeri Sembilan states.
The minister went on to detail that RM66.08 million went into road maintenance in the state of Pahang, whereas Negeri Sembilan and Johor saw an expenditure of RM23.63 million and RM60.9 million respectively. “These maintenance works are important to keep those roads in good condition,” Fadillah said to reporters.
In Johor, the proposals for road upgrading works on federal road FT050, which stretches from Ayer Hitam to Kluang, specifically from Section 33.8 until the Kluang Stadium junction in Section 49.1, will only be submitted to the federal authorities next year, Fadillah added.

(Image source: Google)
Aimed at reducing fatal accidents throughout said alignment, the Phase 3B project has an estimated value of RM385.3 million under the 12th Malaysia Plan (12MP). It’s also a continuation of the Phase 3A project worth RM219 million that is under construction, and is expected to be complete in October 2024, the senior works minister added further.
“This location has recorded the highest rate of accidents in Malaysia due to the absence of road shoulders, medians and U-turns, with 52 accidents reported from 2020 to June 2022,” said Fadillah.
The Senior Works Minister continued further by adding that the federal road FT050 is the main toll-free route that connects the Batu Pahat, Kluang and Mersing districts. It will also involve construction works to add road shoulders, medians, U-turns and other related works.
Apart from all this, the minister also noted that a further RM600,000 allocation has been approved towards upgrading street lights along federal road FT050. This is meant to further increase said stretch of road’s safety for users. - BERNAMA
Written By
Thoriq Azmi
Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/
JPJ Running Numbers
KUALA LUMPUR
VRQ2733
SELANGOR
BST7217
JOHOR
JE3179J
PULAU PINANG
PSF5744
PERAK
APL4862
PAHANG
CFH7429
KEDAH
KGJ1321
NEGERI SEMBILAN
NEL8542
KOTA KINABALU
SJU1383
KUCHING
QAB5687P
Last updated 18 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Latest News
Perodua Ativa X Is Now RM53K - Would You Still Buy A Myvi?
The Perodua Ativa X is now RM53,000 after a RM9,500 rebate, just RM1,900 below the Myvi 1.5 H. Here's what you get with each.
17-09-2026
BUDI Diesel Can Now Be Transferred Beyond Family - Here's How It Works
BUDI Diesel eligibility can now be transferred beyond immediate family to the actual vehicle user. Here's who qualifies, how to apply and the Sept 27 deadline.
17-09-2026
Puspakom Has More Rivals Now. So Why Aren't Car Inspections Getting Cheaper?
Puspakom now has rivals for M.V.15 ownership transfer inspections, but fees won't get cheaper. Here's why JPJ is keeping rates standardised.
15-09-2026
If You're In Penang And Eyeing A Suzuki, There's A New Showroom To Check Out
Suzuki has opened a new RM1 million dealership in Juru, Penang, expanding its Malaysian network to 14 sales outlets and 13 service centres.
14-09-2026
Malaysia Has More Car Brands Than Ever. So Why Do We Still Choose Proton And Perodua?
Proton and Perodua account for nearly 63% of Malaysia's new car registrations in 2026. Here's why national brands still dominate despite growing competition.
14-09-2026
40,595 Summonses, RM12.18 Million Unpaid. JPJ's Patience Is Running Out
JPJ has given 945 transport companies 14 days to settle 40,595 outstanding summonses worth RM12.18 million or face tougher enforcement.
11-09-2026
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Show More
trending_flat