Phase 2 MRT Putrajaya Line Commence its Tests from Oct 10 to December
Starting from October 10 to December this year, the migration session tests of the Mass Rapid Transit (MRT) Putrajaya Line Phase Two has begun its operation.
The train scheduled in the morning and evening remains the same whilst the test is being conducted.
Rapid Rail Sdn Bhd and its construction team would be in charge for the full operation of the Putrajaya Line MRT.
Chief Executive Officer of Rapid Rail Sdn Bhd, Mr. Amir Hamdan mentioned that the train assessment counted as one of the pre-conditions set by the authorities on top of measuring and testing the effectiveness of the system integrated on Putrajaya Line MRT full operation.
‘’The train assessment involves operations from Putrajaya Sentral MRT Station to Kwasa Damansara MRT Station’’ he stated in a statement.
Passengers could also receive the latest announcements at the train station for more information.
The test trains will stop at all MRT stations on the Phase 1 Putrajaya Line. However, it is not available for picking up passengers.
Written By
Jesica Sendai
from 9 to 5 grinder to 'racing' her way in the automotive industry through editorial work.
JPJ Running Numbers
KUALA LUMPUR
VPM4921
SELANGOR
BSG7503
JOHOR
JYE4625
PULAU PINANG
PRT785
PERAK
ANY6891
PAHANG
CFD485
KEDAH
KGB6356
NEGERI SEMBILAN
NEG6323
KOTA KINABALU
SJL9999*
KUCHING
QAB8364L
Last updated 04 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Government Announces Free MRT, LRT fares, for a month
The government has announced the provision of free services for a month starting today for all public transport operated by RapidKL.
16-06-2022
MRT Putrajaya Line Phase Two Operational March 2023, Total Line Spans 56.2KM
The 38.7 km-long section of the Phase Two alignment, which consists of 15 elevated stations and 9 underground stations, is expected to be operational in March 2023.
24-12-2022
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat