Phase 2 MRT Putrajaya Line Commence its Tests from Oct 10 to December
Starting from October 10 to December this year, the migration session tests of the Mass Rapid Transit (MRT) Putrajaya Line Phase Two has begun its operation.
The train scheduled in the morning and evening remains the same whilst the test is being conducted.
Rapid Rail Sdn Bhd and its construction team would be in charge for the full operation of the Putrajaya Line MRT.
Chief Executive Officer of Rapid Rail Sdn Bhd, Mr. Amir Hamdan mentioned that the train assessment counted as one of the pre-conditions set by the authorities on top of measuring and testing the effectiveness of the system integrated on Putrajaya Line MRT full operation.
‘’The train assessment involves operations from Putrajaya Sentral MRT Station to Kwasa Damansara MRT Station’’ he stated in a statement.
Passengers could also receive the latest announcements at the train station for more information.
The test trains will stop at all MRT stations on the Phase 1 Putrajaya Line. However, it is not available for picking up passengers.
Written By
Jesica Sendai
from 9 to 5 grinder to 'racing' her way in the automotive industry through editorial work.
JPJ Running Numbers
KUALA LUMPUR
VPM4921
SELANGOR
BSG7503
JOHOR
JYE4625
PULAU PINANG
PRT785
PERAK
ANY6891
PAHANG
CFD485
KEDAH
KGB6356
NEGERI SEMBILAN
NEG6323
KOTA KINABALU
SJL9999*
KUCHING
QAB8364L
Last updated 04 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
MRT Putrajaya Line Get 300 Pax Capacity Women’s Coach
MRT Putrajaya Line gets women coach service capable of ferrying up to 400 pax each trip.
09-04-2024
Major Delays On MRT Putrajaya Line Caused By Trespassers - Rapidrail
The MRT Putrajaya Line experienced a service disruption this morning due to a trespassing incident.
14-02-2024
New MRT Feeder Bus From North Sungai Buloh To MRT Putrajaya
Rapid KL announced the new MRT feeder bus connecting areas north of Sg Buloh to the MRT Putrajaya Line station.
06-12-2023
Tun Mahathir Praises MRT Service
Tun M praises infrastructure and facilities in the Mass Rapid Transit (MRT) service.
26-04-2023
"Too early to assess Putrajaya MRT route on peak-hour congestion" - Loke
It is still too early to assess the effectiveness of Putrajaya's MRT service in reducing traffic congestion, says Loke.
07-04-2023
Rapid Rail Suspends LRT Operations At Six Stations, Starting April 2
Rapid KL has announced six stations on the Ampang – Sri Petaling LRT line will be suspended starting April 2.
31-03-2023
MRT Putrajaya Line Free Ride Ends Tomorrow March 31
MRT Putrajaya Line free ride ends tomorrow on March 31.
30-03-2023
KTMB Agrees To Provide CVSKL Patients Free ETS Rides
KTMB collaborates with CVSKL to offer free rides for its patients.
17-03-2023
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat