DASH Toll Collection Starts Tomorrow - Ensure TnG Credit Is Sufficient!
-full_normal.jpg)
And just like that, the Damansara-Shah Alam Elevated Expressway (DASH) has been operational for about a month and a half with today being the LAST day for FREE expressway usage. According to Projek Lintasan Damansara-Shah Alam Sdn Bhd (PROLINTAS), the concession holder company for DASH, Thursday, 1 December 2022 at 12.01 midnight, toll collection will begin.
The DASH Expressway which was launched last October 13, spans a length 20.1-kilometre highway connecting Puncak Perdana to Penchala. There are in total 13 intersections spanning the length of the expressway.
-full_normal.jpg)
According to PROLINTAS, all users would be charged the same toll rate when they pass through any of the three toll plazas on DASH Highway, namely Denai Alam Toll Plaza, RRIM Toll Plaza (Kwasa Damansara) and Kota Damansara Toll Plaza based on their vehicle class.
Cars and buses would be charged a toll fare of RM2.30, taxi RM1.20, lorry RM4.60 while large trailers RM6.90. Toll collections would be fully electronic using either Touch 'N Go, SmartTAG or RFID cards. Users are advised to ensure that the Touch 'N Go card and e-wallet balance is sufficient before entering the DASH Expressway.
-full_normal.jpg)
According to the operators, DASH Highway’s Operation Division will constantly monitor the smoothness of the toll collection system at all three toll plazas in addition to stationing staff at the toll plaza lanes in both directions of the highway, especially during peak hours to assist users who face difficulties. Users are also advised to comply with road safety rules and direction signs provided when passing through the toll plaza to ensure a smooth journey to their destination.
Now that the expressway is not free, we do sincerely hope that all feedback and complaints be addressed better especially with regards to the road surface condition at the entirety of the expressway.
Gallery
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQD7825
SELANGOR
BSK8756
JOHOR
JYM8964
PULAU PINANG
PRW6011
PERAK
APD4031
PAHANG
CFE4685
KEDAH
KGD4501
NEGERI SEMBILAN
NEH9159
KOTA KINABALU
SJP3024
KUCHING
QAB7469M
Last updated 17 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
PNB Weighs RM3 Billion Sale of PROLINTAS
PNB is said to be considering a sale of its toll road operator, PROLINTAS, in a deal potentially worth RM3 billion.
16-07-2025
PROLINTAS Get RM2.7 Billion Financing For Restructuring Effort
Prolintas secures RM2.7 billion financing from Bank Pembangunan’s Tawarruq Asset Financing to aid its restructuring effort.
13-01-2024
Elmina Intersection (EXIT 3504) From GCE Highway Closed - Plane Crash Investigation & Clean-up
PROLINTAS Group has announced the temporary closure of the Elmina Intersection (EXIT 3504) on the GCE Highway in both directions following the plane crash incident
18-08-2023
SUKE Expressway Interchange Closure - Rain Water Drain Pipe Works, 24 & 25 July
Temporary closure of the Shell Bandar Tasik Selatan interchange on MRR2 towards Sungai Besi would take place on 24 and 25 July from 11PM to 5AM during the off-peak hours for scheduled repair works of the Rain Water Drain Pipe (RWDP)
25-07-2023
SUKE Expressway Phase 2 Toll Collection Starts Today - RM2.30 For Cars
SUKE Expressway Phase 2 Toll Collection Starts Today, 30 June 2023 - RM2.30 For Cars
30-06-2023
SUKE Highway Emergency Hotline Just For Show?
Incident shared by road user on social media highlights SUKE Highway emergency hotline being unmanned. This should be cause for concern.
27-04-2023
Cops Nab DASH Highway Street Racers, Some Still At Large
Police detain illegal street racers caught on CCTV for street racing along DASH Highway.
28-02-2023
PROLINTAS announces toll rates decrease by 15% - AKLEH, GCE Guthrie, LKSA, & Kajang SILK highways
15% reduction on toll rates - AKLEH, GCE Guthrie, LKSA, & Kajang SILK highways.
20-10-2022
Latest News
No More Heavy Vehicles On Kuala Terengganu Drawbridge From Jan 1
Heavy vehicles will no longer be allowed to use the Kuala Terengganu drawbridge from Jan 1.
16-12-2025
OMODA & JAECOO Wrap Up 2025 With Season of Rewards
OMODA & JAECOO 2025 Season of Rewards offers extended service packages and practical ownership benefits.
16-12-2025
Overloaded Trucks Crackdown Showing Results, Transport Rates Remain Stable
Strict enforcement against overloaded trucks is paying off, improving road safety and transport efficiency without hiking rates.
16-12-2025
Gemas-JB ETS Needs Better Access To Curb City Traffic - Expert
Experts urge improved first-mile access, feeder buses, and park-and-ride options for the Gemas- JB ETS.
16-12-2025
SCS Adopts Advanced European Testing Systems
SCS raises the bar for vehicle inspections with advanced European testing technology.
16-12-2025
Shah Alam LRT Launch Delayed To Avoid Another 2021 Kelana Jaya Crash
Prasarana delays the Shah Alam LRT opening, prioritising passenger safety and thorough testing after past LRT mishaps.
15-12-2025
Federal Highway Won’t Be Upgraded, Costs Deemed Too High
Despite worsening traffic conditions, the Federal Highway will not be upgraded, with the government citing high costs.
15-12-2025
Bollards Are There for Your Safety, Not Decoration - DBKL
DBKL is reminding the public that bollards play a crucial role in keeping pedestrians safe.
15-12-2025
Show More
trending_flat