No Motorcycles Permitted In Smart Tunnel, No Insurance Coverage For Accidents – Smart

Motorcycles are not permitted in the Smart Tunnel, and there is no insurance coverage if an accident occurs.
The Stormwater Management and Road Tunnel, also known as the Smart Tunnel, is one of the Klang Valley stretches where motorbikes and heavy vehicles are not permitted, and this has been the case for some time...
Smart, the tunnel's operator, sent a reminder to motorcyclists earlier today that two-wheeled vehicles are not permitted to enter the tunnel. Smart emphasised in a tweet (https://twitter.com/Smarttunnel/status/1594541110432505856?s=20&t=DFCssm2JcnVtV132OirH4Q) that motorcyclists and pillion riders are not insured if they are involved in an accident inside the tunnel.

According to the company's website, the only vehicles permitted to use the Smart Tunnel are passenger cars, MPVs, and SUVs with a height of little more than two metres.
The Smart Tunnel has three entry/exit points: Sungai Besi, adjacent to RMAF airport in Jalan Tun Razak, the Kg Pandan roundabout, next to RHB Bank in Jalan Sultan Ismail, and the Park Royal Hotel traffic signal, next to Berjaya Times Square.
Gallery
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQD4314
SELANGOR
BSK7926
JOHOR
JYM7016
PULAU PINANG
PRW5192
PERAK
APD3302
PAHANG
CFE4386
KEDAH
KGD4127
NEGERI SEMBILAN
NEH8729
KOTA KINABALU
SJP2679
KUCHING
QAB7369M
Last updated 13 Dec, 2025
Fuel Price
Petrol
RON 95
RM 2.64
-0.02
RON 97
RM 3.27
-0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.06
-0.02
EURO 5 B7
RM 3.26
-0.02
Last updated 11 Dec, 2025
Related News
RM68 SMART Tunnel Pass Offers Unlimited Travel This Merdeka
Unlimited SMART Tunnel travel from Aug 16 to Sept 16 for just RM68 with the MUTP.
13-08-2025
Underground “SMART” Tunnel Proposed in PJ To Mitigate Traffic And Flood
MBPJ mulls underground tunnel to better control peak hour traffic and flood water.
31-05-2024
SMART Tunnel Closure, Water Level Exceeds Danger Limit
Due to the heavy rain since 6 AM this morning, the SMART Tunnel highway had to be completely closed to make way for flood diversion works.
12-10-2022
Latest News
Govt Rules Out Tiered RON95 Pricing After 300 litres
Government rules out tiered RON95 prices under BUDI95, keeps RM1.99 for first 300 litres
12-12-2025
Hyundai Partners EON, Expands Local Network
Hyundai and EON have signed a LOI to open two new dealerships in Klang Valley and Penang.
12-12-2025
Perodua Traz/Nexis D66B Set to Debut on December 17
The long-awaited Perodua Traz/Nexis D66B SUV is set to make its official debut later on December 17, 2025.
12-12-2025
Gemas-JB Electrified Train Cuts KL-Johor Travel To 4 Hours
The new electrified Gemas-Johor Bahru train line slashes travel time from KL to Johor to just 4 hours 20 minutes.
12-12-2025
PLUS and KEC Ink MoU to Advance Smart Mobility
PLUS and KEC Smart Mobility signs agreement to develop smarter, greener and more connected expressway operations.
12-12-2025
LRT3 Won’t Launch This Year As Glitches Persist, No New Date Set
The LRT3 faces another delay after 33 software glitches were discovered during fault-free tests and no new opening date has been fixed yet.
12-12-2025
CKD GWM WEY G9 Rolls Out at New EPMB Plant
CKD GWM WEY G9 rolls out from EPMB’s new Phase 2 plant, strengthening Malaysia’s NEV localisation ecosystem.
12-12-2025
Proton Shifts 13,451 Units Throughout Nov 2025
Proton closes Nov 2025 by shifting 13,451 units, touts to be “on target” for record exports growth too.
11-12-2025
Show More
trending_flat