MRT Putrajaya Line Free Ride Ends Tomorrow March 31
MRT Putrajaya Line free rides were launched earlier this month on (March 16) at Serdang Depot. The ceremony was officiated by Prime Minister Datuk Seri Anwar Ibrahim while stating the MRT Putrajaya Line Free Rides will be set free of charge starting March 16 until 31.
Thus, there's one more day for travellers to try out the free rides which means you have today (March 30) until tomorrow to ride the PYL without any kind of fees.
RapidKL also confirms that as long as your train journey involves a PYL station or interchange station, it will be stated as free-of-charge (FOC).
To recap, apparently there’s nine underground stations and ten interchanges including connecting stations that combine the line to other public train services in Klang Valley - such as the Kajang MRT line, LRT, monorail, and KTM.
Written By
Jesica Sendai
from 9 to 5 grinder to 'racing' her way in the automotive industry through editorial work.
JPJ Running Numbers
KUALA LUMPUR
VPM5604
SELANGOR
BSG7745
JOHOR
JYE5042
PULAU PINANG
PRT1080
PERAK
ANY7246
PAHANG
CFD721
KEDAH
KGB6454
NEGERI SEMBILAN
NEG6404
KOTA KINABALU
SJL9999*
KUCHING
QAB8459L
Last updated 05 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Raya 2023, Rapid Rail Extends Service To Selected Stations On April 15
Rapid Rail extended its operation hours on selected train stations until 1.30AM this Saturday (April 15).
13-04-2023
Rapid Rail Suspends LRT Operations At Six Stations, Starting April 2
Rapid KL has announced six stations on the Ampang – Sri Petaling LRT line will be suspended starting April 2.
31-03-2023
"Need To Optimise Space On Short Commuter Trains Greater Than Need For Special Women's Coaches" - Loke
There are no special coaches for women on the public transportations because space on such trains must be maximized, says Loke.
23-03-2023
Rapid Rail & Bus Peak Hour Recalibration For Ramadan Month
Rapid KL has announced its recalibration of peak operational hours throughout the month of Ramadan this year.
23-03-2023
LOKE : Public Transport To Have Open Payment Solution Soon - Credit & Debit Card
Commuters would eventually be able to use their credit or debit cards on top of the current Touch 'n Go cards for public transports.
21-03-2023
PM Announces Free MRT Putrajaya Line Fares Until End Of March
PM inaugurated the full launch of MRT Putrajaya Line plus announced free fares starting March 16 to 31, 2023.
16-03-2023
MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL
MRT Putrajaya Line Phase Two is expected to reduce traffic congestion to the city centre.
13-03-2023
RapidKL Is Upgrading The LRT, MRT & Monorail Audio System
RapidKL is upgrading the LRT, MRT and Monorail audio system in phases prior to the MRT Putrajaya Line Phase 2 opening.
07-03-2023
Latest News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor
KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.
04-08-2025
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
Show More
trending_flat