Kajang-SILK Highway Road Closure - 26 To 27 May, Pedestrian Overpass Construction

This closure is to facilitate the construction works to install a new pedestrian overpass bridge at Sungai Ramal around Food Valet and JB Autoworld.
-full_normal.jpg)
Therefore road users are advised to observe the speed limits as well as the instructions of the ground staff when driving along the construction area. Prolintas has taken the precautions to set up traffic controllers and safety warning signs along the area.
-full_normal.jpg)
Road users heading towards Putrajaya would be required to exit the slip road at the N9 Food Court and rejoin back the main road right after passing the construction site. As for those heading towards Kajang, they would be required to take a longer de-tour passing through Kawasan Perindustrian MIEL, Bangi Homestay Golf Resort and Taman Sri Langat before rejoining the Kajang-SILK Highway.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPY6516
SELANGOR
BSK1152
JOHOR
JYK8645
PULAU PINANG
PRV5857
PERAK
APC4390
PAHANG
CFE1290
KEDAH
KGC9419
NEGERI SEMBILAN
NEH5778
KOTA KINABALU
SJN6176
KUCHING
QAB4991M
Last updated 12 Nov, 2025
Fuel Price
Petrol
RON 95
RM 2.60
RON 97
RM 3.20
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.02
+0.07
EURO 5 B7
RM 3.22
+0.07
Last updated 06 Nov, 2025
Related News
Honda City Owner Nabbed For Avoiding Toll Amounting To RM256.20
rolintas enforcement officers at the Kajang SILK Highway route where they nabbed a driver of a white Honda City who had been successfully evading toll payment at the tune of RM256.20 inclusive of administrative charges.
17-10-2022
Kajang Silk Highway Morning Tidal Flow Returns, Runs Until March 26
Prolintas reactivates morning tidal flow for the Sungai Ramal-Uniten stretch of the Kajang Silk Highway until March 26.
17-03-2025
PROLINTAS Get RM2.7 Billion Financing For Restructuring Effort
Prolintas secures RM2.7 billion financing from Bank Pembangunan’s Tawarruq Asset Financing to aid its restructuring effort.
13-01-2024
Latest News
LATAR Interchange Opens, Direct Access To Eco Grandeur
The Eco Grandeur Interchange and Toll Plaza has officially opened, offering direct access through Exit 2502 to Eco Grandeur.
11-11-2025
Penang Sentral Set to Become Mainland’s Integrated Transport Hub
The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.
11-11-2025
Six Bidders Eye Barrier-Free MLFF Toll System - Report
Six consortiums are reportedly competing to roll out Malaysia’s long-awaited MLFF toll system.
11-11-2025
EV Ownership Risky, Battery Leasing Could Ease Depreciation Risks - Analysts
EVs can lose nearly half their value in five years, while high battery costs and limited infrastructure keep ownership risky.
11-11-2025
PLUS To Close Two Bangi Ramps Nightly Until Nov 28
PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.
10-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient
JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.
10-11-2025
JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams
JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.
10-11-2025
Show More
trending_flat