KLSCM 2023 - Major Roads, Highways Closed On September 30 And October 1
The Ampang-Kuala Lumpur Elevated Highway (Akleh) and the Duta-Ulu Kelang Motorway (Duke) are among the major roads that will be closed on Saturday (September 30) and Sunday (October 1) to accommodate the 2023 Kuala Lumpur Standard Chartered Marathon (KLSCM).
Datuk Allaudeen Abdul Majid, the police chief of Kuala Lumpur, said the international running event, which will take place on Saturday and Sunday depending on the category, is expected to draw 25,000 participants from Malaysia and abroad.
He stated that several roads, including Jalan Raja (Dataran Merdeka) leading to Jalan Raja Laut, Jalan Sultan Ismail, and Jalan Dang Wangi, will be closed and diverted from midnight to 11 a.m. on Saturday.
Jalan Ampang leads to the city centre, Jalan Kuching leads to the Dato Onn Roundabout, and Jalan Parlimen, Jalan Cenderawasih, and Jalan Hishamuddin leads to Jalan Raja. On Sunday, 29 roads will be closed, including Akleh and Duke (from Ulu Kelang north to the Duta Toll).
“Other roads to be closed include Jalan Lebuh Ampang to Jalan Tun Perak, Jalan TAR from Chow Kit to Dataran Merdeka, Jalan Sultan Azlan Shah from the direction of Sentul to Jalan TAR, Jalan Sultan Ismail on both directions, Jalan Tun Razak to Jalan Ampang from the Kg Pandan roundabout and Jalan Tun Razak to Jalan Kuching in the city centre near the World Trade Centre,” he said in a statement.
In addition to KLSCM 2023, Allaudeen stated that police will close some roads in conjunction with the Petronas Le Tour Langkawi Malaysia 2023 (LTDL 2023), which began on Saturday in Kerteh, Terengganu and will end on October 30 in KLCC, Kuala Lumpur.
He stated that the cycling race will pass through several major roads in the capital, with nine roads closed.
“Among the roads involved are Jalan Jelatek to Jalan Ampang in the city centre and to Jalan Kg Pandan, Jalan Tun Razak to Jalan Ampang starting in front of the PNB building, from Jalan Sultan Ismail-Jalan Ampang intersection to the Jalan Ampang-Jalan Yap Kwan Seng intersection.
All of the road closures and diversions will take place from 3.15 pm to 4.15 pm,” he said.
As a result, he advised those planning to travel on those roads to plan ahead of time and work with the police to ensure a smooth flow of traffic in the area.
He stated that the public can contact the Kuala Lumpur Traffic Hotline at 03-2071 9999 / 03-2071 9777, the Kuala Lumpur Police Hotline at 03-2115 9999, or the Kuala Lumpur Traffic Facebook page with any questions.
Gallery

Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPS6031
SELANGOR
BSH8371
JOHOR
JYG8397
PULAU PINANG
PRU1525
PERAK
APB2738
PAHANG
CFD4995
KEDAH
KGC3086
NEGERI SEMBILAN
NEH1445
KOTA KINABALU
SJM6409
KUCHING
QAB1806M
Last updated 20 Sep, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.21
+0.03
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.93
+0.03
EURO 5 B7
RM 3.13
+0.03
Last updated 18 Sep, 2025
Related News
KLCC Roads Closed Saturday For Sarong Music Run
Expect road closures and traffic delays around KLCC tomorrow for the Malaysia Sarong Music Run 2025.
19-09-2025
ASEAN Foreign Ministers’ Meeting Sees Traffic Disruptions in KL from July 5
Traffic near KLCC will be affected starting July 5 as Malaysia hosts ASEAN Foreign Ministers’ Meeting from July 8 to 11.
02-07-2025
KL Road Closures For Masi Magam Chariot Procession
Major roads in Kuala Lumpur will be closed in stages today for the Masi Magam 2025 procession.
12-03-2025
NKVE Partial Lane Closure For Seven Months Beginning March 30
NKVE will have a partial lane closure from 10 p.m. to 5 a.m. daily beginning March 30.
29-03-2023
Jalan Cheras To Close From March 7 - May ; Contraflow At EkoCheras, MRT Taman Mutiara Stretch
DBKL has announced that the Jalan Cheras stretch in front of the MRT Taman Mutiara station will be closed and diverted beginning March 7.
01-03-2023
Latest News
TQ Wuling Bingo EV CKD Production Set to Begin in Dec 2025
The new SGMW-Tan Chong joint venture EV plant will start its local assembly efforts this Dec with the TQ Wuling Bingo.
19-09-2025
MyKad Checks Urged Ahead of Fuel Price Drop
Home minister urges Malaysians to fix faulty MyKad chips early to enjoy the upcoming targeted fuel subsidy.
19-09-2025
GAC Emkoo Awarded 5-star ASEAN NCAP Rating
Upcoming GAC Emkoo C-SUV earns coveted 5-star rating form ASEAN NCAP crash-testing regime.
19-09-2025
KLCC Roads Closed Saturday For Sarong Music Run
Expect road closures and traffic delays around KLCC tomorrow for the Malaysia Sarong Music Run 2025.
19-09-2025
Sand, Log Trucks Dominate Kelantan Roads - JPJ
Sand and log trucks make up most heavy vehicle traffic in Kelantan, with fewer overloaded cases.
19-09-2025
Customs Seizes 32 Imported Cars Worth RM8.45 Million
Ops Purple uncovered vehicles stored beyond the legal limit, with unpaid duties and taxes totalling RM5.38 million.
19-09-2025
MAA: Aug 2025 Sales Up 4.2%, YoY Growth Modest at 0.6%
Latest MAA Aug 2025 sales figures see PVs contribute 67,302 units, with CVs taking the remaining 5,739.
19-09-2025
PLUS Kulai–Senai Smart Lane Closed Starting Sept 22
PLUS closes Kulai–Senai Smart Lane on Sept 22 for road widening. Separately, it also continues RM37m restroom refurbishments across its highway network.
19-09-2025
Show More
trending_flat