Underground “SMART” Tunnel Proposed in PJ To Mitigate Traffic And Flood
Spawning from the cancellation of the Petaling Jaya Dispersal Link (PJD Link), Petaling Jaya City Council (MBPJ) is mulling the introduction of an underground passageway planned under the Draft Special Area Plan (RKK) for Sections 19, 51, and 51A in Petaling Jaya, Selangor.
MBPJ Planning Development Department’s Director Lee Lih Shyan announced that the 1.98 KM tunnel would traverse Sections 51, 51A, Federal Highway Route 2, and the New Pantai Expressway (NPE).
Additionally, the total cost for the tunnel construction is estimated to be at RM350 million, which will be funded through the city’s development trust account using funds collected from developers. He also explained that the Stormwater Management and Road Tunnel (SMART Tunnel) is aimed at easing traffic congestion and mitigating floods in the city.
The proposed 1.98 km SMART Tunnel however does draw scepticism from several residents, especially in regards to the tunnel's effectiveness in dispersing traffic and suggested cheaper alternatives like a flyover which would potentially be better.
“We need to know where the tunnel will start and end. Since the tunnel is meant to mitigate flooding, we also need to understand where the water will be channelled to,” said David Yoong, a retired civil engineer. He added, “Based on the details we have, the tunnel will not solve the flooding or traffic problems.”
Meanwhile, long-time Section 51 resident Jermain Ryan voiced concerns about property acquisition to facilitate the tunnel's construction. “My row of houses has no walkway and is prone to flooding. We are under the LRT line too.” She also expressed that she is not convinced this tunnel near her house is viable.
Lee also has invited affected residents in the area to join in the next engagement session to discuss details with the MBPJ Engineering Department. Furthermore, stakeholders may file questions or objections to the RKK from today onwards through a form downloadable from the MBPJ website.
Source: The Star
Written By
KS
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well! https://www.linkedin.com/in/kumeran-sagathevan/
JPJ Running Numbers
KUALA LUMPUR
VPJ4022
SELANGOR
BSF9710
JOHOR
JYC6167
PULAU PINANG
PRS1692
PERAK
ANX3867
PAHANG
CFC4465
KEDAH
KGB2585
NEGERI SEMBILAN
NEG3973
KOTA KINABALU
SJL5709
KUCHING
QAB6329L
Last updated 04 Jul, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.18
-0.03
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.85
-0.03
EURO 5 B7
RM 3.05
-0.03
Last updated 03 Jul, 2025
Related News
No Motorcycles Permitted In Smart Tunnel, No Insurance Coverage For Accidents – Smart
Motorcycles are not permitted in the Smart Tunnel, and there is no insurance coverage if an accident occurs.
22-11-2022
SMART Tunnel Closure, Water Level Exceeds Danger Limit
Due to the heavy rain since 6 AM this morning, the SMART Tunnel highway had to be completely closed to make way for flood diversion works.
12-10-2022
Petaling Jaya Road Closure, 17 & 18 June - PJ10K 2023 Run
MBPJ has announced a series of road closures to facilitate the PJ10K 2023 this weekend, 17 and 18 June 2023.
15-06-2023
Latest News
KLIA Aerotrain Stalls After Downpour Causes Drainage Pump Malfunction
Just days after its grand relaunch, KLIA Aerotrain service was briefly halted when a faulty pump let rainwater flood its tunnel.
04-07-2025
Kelana Jaya LRT Delayed After Passenger Falls Onto Track
A passenger fell onto the track near Subang Alam Station around 8:00AM, causing peak-hour delays on the Kelana Jaya LRT Line.
04-07-2025
Badminton Legend Burns RM285K On Dream SUV
Former world No. 1 shuttler Tan Boon Heong revealed he lost RM285,000 on his RM530,000 Range Rover Sport.
04-07-2025
JPJ Services Offline From 10 PM Friday to 6 AM Saturday
The JPJ online services will be offline from Friday 10 PM to Saturday 6 AM for scheduled system maintenance.
04-07-2025
Experts Push For Corporate Liability In Wake Of Transport Safety Failures
With most transport firms failing safety audits, experts urge a corporate liability law to hold companies accountable for crashes.
04-07-2025
Nightly Closure of Jalan Ismail Sultan for RTS Works Until July 16
Jalan Ismail Sultan (Stulang-bound) will be closed nightly from 10PM to 5AM for RTS Link construction until July 16.
04-07-2025
Tech-Driven RON95 Subsidy Rollout in the Works
The government is developing a new tech-based RON95 fuel subsidy model to reduce misuse and ensure fairness.
03-07-2025
GWM Haval H6 HEV Gets 10-Year Hybrid Battery Warranty
GWM Malaysia enhances battery warranty for GWM Haval H6 HEV to 10 years, existing owners automatically upgraded too.
03-07-2025
Show More
trending_flat