Goodyear Malaysia Looking For Buyers For Its Shah Alam Factory
The American tire giant Goodyear decided in March to close its Malaysian manufacturing plant as part of its cost-cutting measures, and now it is offering its Shah Alam Section 15 factory for sale.
An advertisement appeared in The Edge for the week of July 29-August 4, 2024, inviting tenders for a 29.3-acre industrial parcel described as prime industrial property and located at Lot 51, Persiaran Selangor, Section 15, Shah Alam, Selangor.
The advertisement, placed by real estate consultancy firm CBRE WTW, also stated that the land has "potential for redevelopment". The tender's closing date is August 28, 2024.
For the record, after decades of operation, Goodyear Malaysia has decided to close its Shah Alam production plant. This decision is part of Goodyear's regional transformation plan, in which the American tyremaker aims to optimise its footprint and portfolio in Asia-Pacific.
Photo: NST.
Established in 1972, Goodyear Malaysia's Shah Alam plant is one of the few dedicated tyre manufacturing facilities in the country. With the plant's closure, Toyo and Continental are the only two tyre companies that continue to manufacture locally.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VPM5539
SELANGOR
BSG7726
JOHOR
JYE4987
PULAU PINANG
PRT1064
PERAK
ANY7209
PAHANG
CFD677
KEDAH
KGB6433
NEGERI SEMBILAN
NEG6396
KOTA KINABALU
SJL9999*
KUCHING
QAB8457L
Last updated 04 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Goodyear Sells Dunlop Brand to SRI for RM3.14 Billion
Goodyear sells Dunlop brand to SRI for RM3.14 Billion as part of its cost cutting strategy.
09-01-2025
First Van With Puncture-Proof Tires Hits Singapore's Roads
Van fitted with puncture-proof tires made its way from the DHL Express office in Tai Seng Drive to Potong Pasir.
13-01-2023
Goodyear Malaysia Closure: Rafidah Questions Govt’s Motives
Goodyear Malaysia’s closure prompts Rafidah Aziz to quiz the government's actual appreciation of investors already in Malaysia.
08-03-2024
Goodyear Malaysia Is Shutting Down Its Shah Alam Plant This Year
Goodyear Malaysia has announced the closure of its Shah Alam production plant, set to take place in June 2024.
07-03-2024
Cooper Tires Brand Now Available At Selected Goodyear Autocare Stores
Cooper Tires brand and products for cars, crossover SUVs, 4x4, and pick-up trucks now available through selected Goodyear Autocare stores.
26-04-2023
Goodyear Safeguarding Your Journey This Festive Season By Looking After Your Tyres
Goodyear's "Raya Bergaya Bersama Goodyear" promotion will run from now until Wednesday, May 31, 2023, with more prizes.
11-04-2023
First Van With Puncture-Proof Tires Hits Singapore's Roads
Van fitted with puncture-proof tires made its way from the DHL Express office in Tai Seng Drive to Potong Pasir.
13-01-2023
Goodyear Demonstrates New Tyre Made From 90% Sustainable Materials
Goodyear shows off new tyre that promises low C02 footprint and heightened efficiency.
06-01-2023
Latest News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor
KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.
04-08-2025
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5
Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.
04-08-2025
1,489 Summonses Issued in VEP Enforcement Operation – JPJ
JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.
04-08-2025
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.
Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.
04-08-2025
RM110 Million Collected from Special Plate Sales Since 2023 – MoT
A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.
04-08-2025
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short
With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.
04-08-2025
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report
The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.
04-08-2025
ETS to JB Sentral ‘On Track’, But Not Quite There Yet
KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.
04-08-2025
Show More
trending_flat