KTMB Leases 62 New Train Sets for RM10.7 Billion From CRRC

The government unveiled a new strategy to enhance the Keretapi Tanah Melayu Berhad (KTMB) railway network by acquiring passenger train assets on lease. This was announced by Transport Minister Anthony Loke during a joint press conference yesterday with Minister of Economy Rafizi Ramli.
Loke further added that this approach will be implemented through a government-to-government (G2G) mechanism between Malaysia and China, aiming to improve the quality of public transportation services.
Phase 1 of this initiative, scheduled from 2024 to 2027, involves the addition of 62 new passenger train sets at an estimated cost of RM10.7 billion, which will be paid in instalments over a 30-year lease period. The 62 trains include 36 three-car set of electric multiple unit (EMU) trains, 12 six-car set of EMU trains, and 14 six-car set diesel multiple unit (DMU) trains.
Currently, almost 90% of KTMB’s passenger trains are manufactured by China’s state-owned CRRC (China Railway and Rolling Stock Corporations).

Loke further mentioned that one of the key advantages of leasing is that the cost covers all levels of maintenance, repair, and overhaul (MRO) by CRRC. This strategy will work better after viewing the challenges faced by KTMB’s passenger trains, particularly the Electric Train Service (ETS) and KTM Komuter, in terms of availability and reliability.
Presently, only 68 passenger train sets are operational nationwide. Without immediate improvements, the quality of KTMB’s services could further deteriorate.
Meanwhile Rafizi, in support of this initiative, stated that his ministry is working closely with the Ministry of Transport to transform Malaysia’s public transport landscape, with a specific focus on the Klang Valley.
The government aims to increase passenger train services across Malaysia to 299 trains by 2030, with a goal of achieving 80% railway track utilisation in Peninsular Malaysia by the same year. This will not only reduce congestion and improve environmental sustainability but also act as a key driver of economic growth.
Source: The SUN
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQN6134
SELANGOR
BSM8245
JOHOR
JYS3290
PULAU PINANG
PSA1644
PERAK
APF5708
PAHANG
CFF5290
KEDAH
KGE5361
NEGERI SEMBILAN
NEJ6411
KOTA KINABALU
SJQ5614
KUCHING
QAB3514N
Last updated 01 Mar, 2026
Fuel Price
Petrol
RON 95
RM 2.59
+0.05
RON 97
RM 3.15
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.04
+0.05
EURO 5 B7
RM 3.24
+0.05
Last updated 26 Feb, 2026
Latest News
Kelana Jaya LRT trains “out of service” but line running normally - RapidRail
Rapid Rail clarified that temporary train withdrawals on the Kelana Jaya LRT line are part of standard safety procedures.
27-02-2026
Leapmotor C10 Plus Debuts In Malaysia - 299 hp, 510 km Range, From RM139k
The 2026 Leapmotor C10 PLUS and exclusive Night Edition arrive in Malaysia with longer range, faster charging, and upgraded performance.
27-02-2026
Chery Malaysia Teams Up with Lee Chong Wei for Youth Badminton Cup
Chery Malaysia joins forces with Lee Chong Wei to sponsor the inaugural national youth tournament with RM100,000 in prizes.
27-02-2026
Updated Fuel Prices From 26 February To 4 March
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 26 February to 4 March, 2026, the rates are as such.
25-02-2026
APAD to Investigate Kelana Jaya LRT Breakdowns, Prasarana Ordered to Explain
Transport Minister has directed APAD to probe recent Kelana Jaya LRT disruptions and warned action may be taken against Prasarana.
25-02-2026
Chery TIGGO CROSS HEV Grand Prize Winner Announced
Joan Gan became the grand prize winner of a Chery TIGGO CROSS HEV, chosen from over 1,300 participants in Chery Malaysia’s year-end PHEV lucky draw.
24-02-2026
LRT3 Set for June 2026 Launch, Contractor Faces RM2.73 Million Daily Penalty for Delays
The Shah Alam LRT3 line is targeted to begin operations by June 2026, with contractors liable for RM2.73 million per day in delay penalties.
24-02-2026
Johor–Singapore RTS Link Fare Expected at RM15 to RM22 Per Trip
Transport Minister Anthony Loke says the RTS Link could cost between RM15 and RM22 per journey, with fares to be announced in 2H2026.
23-02-2026
Show More
trending_flat