QR Codes Coming for Drivers at Johor Checkpoints
-to-detect-paint-flaws-on-the-cars-it-assembles-at-its-facilities-in-the-United-States.-(85)-full_normal.jpg)
The Malaysian government will expand QR code immigration clearance at the Sultan Iskandar Building (BSI) and Sultan Abu Bakar Complex (KSAB) in Johor, targeting car drivers this year.
Deputy Prime Minister Datuk Seri Fadillah Yusof said this follows the successful use of QR codes for bus passengers and motorcyclists, easing congestion at the Johor-Singapore Causeway.

"By integrating technology and improving infrastructure, immigration clearance now takes only three seconds per user," he said after chairing the Special Committee Meeting to Address Congestion on the Johor Causeway.
With Malaysia set to chair ASEAN in 2025 and boost tourism and investment, the government is taking urgent steps to address traffic congestion.
The committee agreed to extend these measures nationwide, ensuring smoother entry at all major international checkpoints.

Home Minister Datuk Seri Saifuddin Nasution Ismail confirmed QR codes have increased motorcycle clearance from 90 to 150 per lane every 15 minutes at BSI and KSAB.
"Next, we move our focus on car users, as they now face the worst congestion," he said, adding that solutions are also being explored for entry points like Rantau Panjang, Sadao, Bukit Kayu Hitam, Padang Besar, and major airports.

He also updated on the Johor Bahru-Singapore Rapid Transit System (RTS) Link, set to be completed by Dec 31, 2026, carrying 10,000 to 20,000 passengers per hour.
"Early preparations are crucial to manage traffic at Bukit Chagar and the RTS location in Singapore," he added.
These efforts aim to streamline immigration, improve travel efficiency, and enhance Johor-Singapore connectivity.
Source: BERNAMA
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VRP4940
SELANGOR
BST5760
JOHOR
JD9231J
PULAU PINANG
PSF4414
PERAK
APL3750
PAHANG
CFH6836
KEDAH
KGH9789
NEGERI SEMBILAN
NEL7664
KOTA KINABALU
SJT9792
KUCHING
QAB5392P
Last updated 11 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Fadillah: 4,100 EV Chargers Active Now as Malaysia Ramps Up Green Mobility
Malaysia has at least 4,100 EV charging points active nationwide, and it forms part of the National Energy Transition Roadmap towards Net Zero by 2050.
09-09-2025
DPM Reaffirms 10,000 EV Chargers Target, But Are We REALLY On Track?
To hit its ambitious target of having 10,000 EV chargers up year end, Malaysia must do more than count chargers — it must chart a reliable course forward.
23-05-2025
PETRA Pledges 10,000 EV Charging Stations by Year-End
Fadillah stresses the need for EV chargers in urban and rural areas, aims for 10,000 stations nationwide by year-end.
21-01-2025
Johor–Singapore RTS Link Fare Expected at RM15 to RM22 Per Trip
Transport Minister Anthony Loke says the RTS Link could cost between RM15 and RM22 per journey, with fares to be announced in 2H2026.
23-02-2026
First Johor Bahru–Singapore RTS Train Hits Woodlands
The first Johor Bahru–Singapore RTS Link train has arrived in Singapore on Wednesday, as confirmed by LTA.
05-02-2026
Bukit Chagar RTS Link Station Roof Completed, Final Facade Works Underway
Bukit Chagar station reaches a major milestone as the RTS Link roof is completed.
22-01-2026
Johor-Singapore RTS Completes First Test Run from Wadi Hana To Border
The RTS Link completes its first train test run from Wadi Hana Depot through Bukit Chagar to the Malaysia-Singapore border.
30-12-2025
Malaysia–Singapore Ink Additional Agreement for RTS Link
Malaysia–Singapore reaffirm RTS Link with an Additional Agreement to enable single-point immigration clearance.
05-12-2025
Latest News
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Would You Trust Malaysia's MLFF System To Charge The Right Car, Every Time?
Malaysia's MLFF is moving forward, but how will barrier-free tolls identify and charge the right car? Here's how RFID, ANPR and the system could work.
09-09-2026
Is "Adjusting" Used-Car Mileage Really Normal In Malaysia?
A Bro Wong-SCRUT dispute has put used-car mileage adjustment back in focus. How common is odometer tampering in Malaysia, and are buyers protected?
09-09-2026
AI Is Now Monitoring 3 Malaysian Highways - Could Automated Summonses Be Next?
AI is now monitoring BESRAYA, NPE and LEKAS, detecting traffic offences and incidents in real time. Could automated summonses eventually follow?
09-09-2026
Too Modified For Malaysian Roads? JPJ Takes Action Against 97, Seizes 37
JPJ seized 37 modified cars during Ops Ekstrem in KL, with 485 notices issued. Some owners reportedly spent up to RM150,000 on exhaust modifications.
09-09-2026
Should Malaysia Follow Singapore And Ban Holding Phones While Driving?
Malaysia is being urged to consider stricter rules on holding phones while driving, similar to Singapore's proposed approach. Here's what the law says.
08-09-2026
Car Stuck At The Service Centre? KPDN Says Transport Costs May Be Claimable
Car stuck at the service centre for warranty repairs? KPDN says Malaysian owners may seek compensation for reasonable alternative transport costs.
08-09-2026
Show More
trending_flat
