ENZHMS
Link Copiedcheck_circle
Auto News

KL Monorail Stranded 373 Passengers After System Glitch

Anis

Share via

585175882_1194952279398249_3043098170752054861_n.jpg A technical fault on the KL Monorail left 373 passengers stranded earlier today, causing delays and a minor medical incident. 

The train got stuck between Jalan Sultan Ismail and Chow Kit stations, leaving commuters trapped on board, with one passenger reportedly fainting.

Emergency responders from the Titiwangsa Fire and Rescue team were on the scene quickly after receiving a call at 9:39AM. 


"With support from monorail staff, all passengers were safely transferred to a replacement train and evacuated near Jalan Sultan Ismail Station

"The passenger who fainted received immediate treatment and was handed over to Ministry of Health personnel for further care. The rescue operation wrapped up at 11:03AM," the department said in a statement.

585004443_1194952349398242_5680617728013487684_n.jpg
Rapid Rail later confirmed that the disruption was caused by a system error at Medan Tuanku Station. While transit officers were able to evacuate those on the stalled train, the problem affected the whole monorail line.

"To keep commuters moving, Rapid Rail activated alternative transport. A shuttle train is running between KL Sentral and Hang Tuah, another connects Hang Tuah and Bukit Nanas, and buses are covering the Titiwangsa to Bukit Nanas route," it stated. 

Rapid Rail engineers are currently on-site to fix the issue and resume normal operations. Commuters are advised to plan ahead and consider alternative transport for the day.


Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

JPJ Running Numbers

KUALA LUMPUR

VQA6246

SELANGOR

BSK2975

JOHOR

JYL3776

PULAU PINANG

PRV8397

PERAK

APC6284

PAHANG

CFE2065

KEDAH

KGD1196

NEGERI SEMBILAN

NEH6422

KOTA KINABALU

SJN7437

KUCHING

QAB5433M

Last updated 20 Nov, 2025

Fuel Price

Petrol

RON 95

RM 2.65

RON 97

RM 3.28

+0.03

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 3.10

+0.03

EURO 5 B7

RM 3.30

+0.03

Last updated 20 Nov, 2025

Latest News

Auto News

Rapid Rail Breakdowns Drop Sharply This Year - Loke

Proactive maintenance and real-time monitoring have cut train disruptions significantly this year.

20-11-2025
Auto News

KLIA Roof Leak: MAHB Halts Work On RM5.27 Million Contract

KLIA Terminal 1 roof work halted as investigation launched after rainwater leakage.

20-11-2025
Auto News

MRR2 Steel Canopy Collapse: Skylift Boom Collision Blamed

DOSH launches investigation after a skylift boom struck a temporary steel canopy, causing it to fall on a moving vehicle.

Auto News

KL Monorail Stranded 373 Passengers After System Glitch

KL Monorail train got stuck between Jalan Sultan Ismail and Chow Kit, stranding 373 passengers.

20-11-2025
Auto News

Truck Operators Give 48-Hour Ultimatum, Loke Stands Firm On Load Limits

Truck operators give Anthony Loke 48 hours to respond to their 26-point memorandum on overloaded lorry limits.

20-11-2025
Auto News

LEPAS Malaysia Gears Up for 2026 – L8 and L6 PHEVs Coming?

LEPAS Malaysia is set for a 2026 debut, possibly bringing the L8 and L6 PHEVs for which too.

Auto News

Updated Fuel Prices From 20 To 26 November

The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 20 to 26 November, 2025, the rates are as such.

19-11-2025
Auto News

Works Ministry Yet To Receive Genting Road Charge Proposal

Works Ministry clarifies no formal proposal received as Genting Malaysia plans charges for road maintenance.

19-11-2025

Show More

trending_flat
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.