ASEAN 2025: Rapid Rail Steps Up With More Trains, Safety Upgrades
Rapid Rail Sdn Bhd (Rapid KL) is gearing up to handle the expected commuter rush during the ASEAN Summit 2025, with plans to add more trains and extend peak-hour operations from Oct 26 to 28.
Acting chief executive officer Nor Azmi Mohd Yusof said the company is reviewing its schedules to keep trains running smoothly despite major road closures around KLCC and other key areas during the event.
“We will operate as usual during the ASEAN Summit, but are aware that several main routes will be closed. If needed, Rapid KL will deploy additional trains and extend peak-hour frequency to accommodate passengers,” he told Bernama.
With traffic expected to be heavy, the public is being encouraged to use public transport throughout the summit period.
Nor Azmi said the company had recently strengthened its rail network, with 27 new train sets added to the Kelana Jaya Line and automatic platform gates (APG) fully installed on the KL Monorail Line last Dec.
For the Ampang and Kelana Jaya lines, the tender process for APG installation is underway, with work expected to start by the end of the year and completed within 16 months.

“These two lines are the only ones without automatic platform gates. We have begun installing temporary barriers covering up to 70% of the platform area to reduce the risk of passengers falling,” Nor Azmi noted.
Rapid KL is also reviewing feeder bus routes and coordinating with police to ensure smooth movement during the summit.

The company aims to reach 1.35 million daily passengers by Dec, supported by better crisis management training and stronger coordination through Incident Commanders during service disruptions.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VQJ3921
SELANGOR
BSL8546
JOHOR
JYQ2135
PULAU PINANG
PRX9017
PERAK
APE4426
PAHANG
CFE8702
KEDAH
KGD9485
NEGERI SEMBILAN
NEJ3406
KOTA KINABALU
SJP8258
KUCHING
QAB681N
Last updated 23 Jan, 2026
Fuel Price
Petrol
RON 95
RM 2.54
+0.02
RON 97
RM 3.10
+0.02
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.88
+0.04
EURO 5 B7
RM 3.08
+0.04
Last updated 22 Jan, 2026
Related News
No KL Car Free Morning This Sunday Due To ASEAN summit
The Kuala Lumpur Car Free Morning (KLCFM) on May 25 is canceled due to ASEAN Summit road closures.
23-05-2025
PLUS Announces Several Road Closures For ASEAN Summit
PLUS announces several road closures on May 23-26 and May 28 for the ASEAN Summit 2025.
22-05-2025
PDRM Set For Two-Day Dry Run Ahead Of 46th ASEAN Summit
PDRM set to simulate convoy movements in KL ahead of next week’s high-level 46th ASEAN Summit meetings.
21-05-2025
New Proton Saga & Proton e.MAS 5 Presented at the 2025 ASEAN Summit
The new Proton Saga and the e.MAS 5 were presented to the Malaysian and Chinese prime ministers during the ASEAN Summit.
28-10-2025
LLM Activates Traffic Plan Ahead of 47th ASEAN Summit in KL
LLM and PDRM roll out a coordinated traffic management plan to ensure smooth travel during the ASEAN Summit.
23-10-2025
ASEAN Summit 2025: Road Closures & Diversions Announced
Road closures and diversions in Klang Valley announced ahead of the upcoming 46th ASEAN Summit.
19-05-2025
Rapid Rail Breakdowns Drop Sharply This Year - Loke
Proactive maintenance and real-time monitoring have cut train disruptions significantly this year.
20-11-2025
KL Monorail Stranded 373 Passengers After System Glitch
KL Monorail train got stuck between Jalan Sultan Ismail and Chow Kit, stranding 373 passengers.
20-11-2025
Latest News
KL’s Lalaport Hub Nears Approval for Singapore Express Buses
KL’s Lalaport transport hub nears approval, set to streamline express bus travel to Singapore by February.
22-01-2026
Overloaded Lorry Crackdown Reduces Road Deaths
Stricter JPJ checks on overloaded lorries are helping make Malaysian roads safer with fewer fatal accidents.
22-01-2026
Bukit Chagar RTS Link Station Roof Completed, Final Facade Works Underway
Bukit Chagar station reaches a major milestone as the RTS Link roof is completed.
22-01-2026
Puspakom - New Brake Inspection Rules for Heavy Vehicles
Puspakom’s new brake inspection rules for heavy vehicles target unsafe brake settings that increase accident risks.
22-01-2026
Updated Fuel Prices From 22 To 28 January
The Ministry of Finance (MoF) has announced the retail prices of all fuels in Malaysia, for the coming week of 22 to 28 January, 2026, the rates are as such.
21-01-2026
Govt Set To Present Lemon Law To Parliament
Malaysia is set to introduce a Lemon Law in 2026, strengthening consumer protection and making dispute resolution easier.
21-01-2026
Smart Lanes Showing Big Drop in Highway Accidents - Nanta
New data shows smart lanes reduce accidents by up to 74%, while keeping highways safe and easing traffic flow.
21-01-2026
KTM Double-Track Klang Line Set For March Completion
KTM’s Klang Valley double-track upgrade between Subang Jaya and Klang is expected to be completed by March.
21-01-2026
Show More
trending_flat
