RTS Link to Deploy 100 E-Gates at Bukit Chagar ICQ

The Johor Bahru–Singapore Rapid Transit System (RTS) Link will feature 100 immigration e-gate lanes at the Bukit Chagar Integrated Immigration, Customs and Quarantine (ICQ) Complex, forming the backbone of a streamlined cross-border clearance process.
Malaysia Rapid Transit Corporation Sdn Bhd (MRT Corp) chief executive officer Datuk Mohd Zarif Hashim said the e-gates are central to the co-located ICQ concept, allowing passengers to complete both Malaysian and Singapore immigration checks within a single facility before boarding the train.
Built to handle peak-hour demand, the Bukit Chagar ICQ will also be equipped with 10 security screening lanes for body checks, 18 baggage scanners and dedicated lanes for passengers travelling without luggage, all aimed at reducing congestion and maintaining smooth passenger flow.


Mohd Zarif said close coordination between Malaysian and Singapore immigration authorities, including the use of QR-code passport clearance, will reduce reliance on manual checks and provide a more predictable border-crossing experience.
The RTS Link is expected to carry around 40,000 passengers per day at the start of operations, with daily ridership projected to rise to about 140,000 over time. At maturity, this could account for 30 to 40% of total Causeway movements.
The co-located ICQ facilities at Bukit Chagar are a key pillar of the RTS Link’s ambition to operate as a world-class international gateway when the system begins service after construction is completed on Dec 31, 2026.
To support public engagement, MRT Corp has also established a Project Information Centre at its RTS Link office, featuring interactive kiosks and virtual walkthroughs of the rail alignment. The customer experience framework was shaped using insights from KLIA and benchmarked against international standards, including those at Changi Airport.
Source: Bernama
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VQR1754
SELANGOR
BSN4692
JOHOR
JYT4665
PULAU PINANG
PSA6584
PERAK
APG1363
PAHANG
CFF8495
KEDAH
KGE8326
NEGERI SEMBILAN
NEJ8149
KOTA KINABALU
SJQ8651
KUCHING
QAB4273N
Last updated 22 Mar, 2026
Fuel Price
Petrol
RON 95
RM 2.59
+0.05
RON 97
RM 3.15
+0.05
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 3.04
+0.05
EURO 5 B7
RM 3.24
+0.05
Last updated 26 Feb, 2026
Related News
Johor–Singapore RTS Link Fare Expected at RM15 to RM22 Per Trip
Transport Minister Anthony Loke says the RTS Link could cost between RM15 and RM22 per journey, with fares to be announced in 2H2026.
23-02-2026
First RTS Link Train Set Delivered Ahead of 2026 Launch
The first train set for the Johor Bahru-Singapore RTS Link was unveiled today and will begin testing soon.
30-06-2025
First RTS Link Train Set Delivered Ahead of 2026 Launch
The first train set for the Johor Bahru-Singapore RTS Link was unveiled today and will begin testing soon.
30-06-2025
Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core
MRT Corp opens a three-month public review for the Penang Mutiara LRT, featuring a proposed six-kilometre cross-sea link to Penang Sentral.
23-02-2026
Ahmad Maslan: Gov. Mulling Further Cost-Reduction For MRT3
Deputy Finance Minister Ahmad Bin Maslan says that the government is mulling further cost-cutting measures in the MRT3 project.
31-03-2023
MRT Putrajaya Line Phase Two Operational March 2023, Total Line Spans 56.2KM
The 38.7 km-long section of the Phase Two alignment, which consists of 15 elevated stations and 9 underground stations, is expected to be operational in March 2023.
24-12-2022
Latest News
Strait of Hormuz to Malaysia: Why We’re Paying for a War 6,000km Away
Why is RON97 at RM4.55/L? We decode the Strait of Hormuz conflict, the May 2026 subsidy deadline, and why Malaysia imports oil despite being a producer.
19-03-2026
From 82 Minutes to 8: How the Mutiara Line is Giving Penangites Their Time Back
Is the 80-minute Penang Bridge crawl finally ending? The Mutiara Line LRT links Butterworth to Komtar in just 8 minutes. Get the latest 2026 project updates, station lists, and more.
17-03-2026
The 2026 Proton X90 Buyer’s Warning: 5 Critical Safety Features You Are No Longer Getting
ASEAN NCAP revokes Proton X90’s 5-star rating. The 2026 facelift is downgraded to 1-star after stripping critical ADAS features. Is your family safe? Get the full safety specs here.
16-03-2026
9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works
Toyota Malaysia hits 9,556 sales in early 2026, proving the "Multi-Pathway" strategy works. From Vios Hybrid to Vellfire HEV, see why hybrids are winning the sales war.
12-03-2026
Chery Tiggo 7 is Now the Safest Chinese SUV on the Planet, This Is Why
The Chery Tiggo 7 makes history as the only Chinese SUV to sweep 5-star ratings from Euro NCAP, ANCAP, and ASEAN NCAP. With a record 94.68 points, see why this is 2026’s safest family SUV.
11-03-2026
Sepang Dates Confirmed: Catch Team Porsche Malaysia in Action on 21–23 August
While the 2026 Porsche Carrera Cup Asia (PCCA) season kicks off in Shanghai this weekend, Malaysian fans are already looking ahead to the highlight of the year: the homecoming.
10-03-2026
Iran-US War Day 10: It’s Not Just Fuel — Malaysia’s Automotive Industry Faces New Risks
While the BUDI95 subsidy program is already feeling the heat of oil prices flirting with US$120 a barrel, the true threat to our automotive sector lies beneath the surface.
09-03-2026
Prasarana to Reveal LRT3 Launch Date This April—Here’s Everything We Know So Far
The wait for the LRT3 Shah Alam Line is entering its final stretch. After months of "will they, won't they" speculation, Prasarana has officially pointed to April 2026 as the month of truth.
05-03-2026
Show More
trending_flat