MOT Mulls Adding Komuter Train Alongside RTS Link In Johor
The Ministry of Transport (MOT) has announced intentions to launch a Komuter train service alongside the full functioning of the Rapid Transit System Link (RTS Link) on Jan 1, 2027.
Transport Minister Anthony Loke explained that the Komuter service will be integrated with the RTS Link Station in Bukit Chagar, Johor Bahru. This station is also part of the Gemas-Johor Bahru Electrified Double Tracking Train Project, which runs beneath the RTS station.
Loke went on to say, "Komuter services are currently available in Kuala Lumpur and surrounding areas. Southern regions, such as Johor Bahru, have yet to benefit from the service. There is currently an electric train service (ETS) between Gemas and JB in Johor, and connecting this track to the RTS line will allow inhabitants of Senai, Kluang, and Kulai to use the Komuter service to travel to Bukit Chagar and then transfer to the RTS to travel to Singapore."
The announcement was made at a press conference following the signing of a Memorandum of Understanding (MoU) to build a pedestrian bridge connecting Coronation Square and the Bukit Chagar RTS Link Station. This project is part of a larger initiative to turn the Bukit Chagar area into a significant public transportation hub in Johor, which coincides with the station's involvement in the Johor Bahru-Singapore RTS Link.
Loke also addressed a proposal by Johor Menteri Besar Datuk Onn Hafiz Ghazi to build a multi-tiered Automated Rapid Transit (ART) system to relieve congestion in Johor Bahru's city centre. The Minister confirmed that the government would rigorously evaluate this plan to ensure it complements the city's integrated public transportation strategy.
Loke did also provide an update on the RTS Link project's development, stating that construction of the rail infrastructure had achieved 70.45% completion as of March 31, while superstructure work on the Bukit Chagar Immigration, Customs, and Quarantine (ICQ) Complex was at 7.02%.
Additionally, a new multi-story 'Park 'N Ride' facility with 1,000 vehicle parking spaces is being built at Bukit Chagar particularly for RTS Link passengers, supplemented by an additional 700 parking spaces at Coronation Square, which is only 400 metres from the station. This totals 1,700 parking spaces designed to accommodate the expected influx of commuters.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPM4900
SELANGOR
BSG7498
JOHOR
JYE4605
PULAU PINANG
PRT744
PERAK
ANY6854
PAHANG
CFD479
KEDAH
KGB6308
NEGERI SEMBILAN
NEG6323
KOTA KINABALU
SJL9999*
KUCHING
QAB8364L
Last updated 03 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel
RTS Link operators are finalising fare strategies to encourage more commuters to switch from private vehicles to public transport.
01-07-2025
Johor On Track To Become Major Rail Hub In Malaysia
Johor is set to become a major rail hub in Malaysia underpinned by ongoing rail developments.
24-03-2025
QR Codes Coming for Drivers at Johor Checkpoints
Malaysia plans to expand QR code immigration clearance to car drivers, aiming to ease congestion at border checkpoints.
04-03-2025
JB-SG RTS Link Fares Will Consider Currency Exchange
RTS Link ticket fares will be finalized by January 2027, considering factors like Malaysia-Singapore exchange rates.
27-02-2025
Govt Calls For Bids For Elevated ART In JB
Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.
14-02-2025
RTS Link 95% Complete, Service Operation Dec 2026
The Johor Bahru-Singapore RTS is 95% complete as of last November.
13-12-2024
Loke: RTS Link 83% Complete & On Schedule For 2027 Operation
Loke recently announced that the RTS Link is 83% complete, with ongoing efforts to mitigate traffic congestion in the surrounding area.
22-08-2024
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat