Link Copiedcheck_circle
Auto News

18 Ramps & Highway Interchange Closed For ‘Anak Sarawak DASH Penchala Link Night Run’

Kumeran Sagathevan

Share via


 

The ‘Anak Sarawak LLM DASH Penchala Link Tunnel Night Run’ is set to flag off at 9pm on the 5th November. This night run is jointly organised by Sarawak Volunteer Association (PSS), the Malaysian Highway Authority (LLM), Damansara-Shah Alam Elevated Expressway (DASH) and Sistem Penyuraian Trafik KL Barat (SPRINT).


Following this, several parts of the highway designated for this event would be closed to the public on the 5th November to 6th November to facilitate the night run participants and other activities surrounding the event.



Below are the DASH ramps that would be closed from 9am 5th November right up to 5am 6th November;

·        Ramp 13D from Damansara-Puchong Highway (LDP) to DASH

·        Ramp 13E from Penchala Link to DASH

·        Ramp 13F from LDP to DASH

·        Ramp 13G from Jalan PJU 7/9 to DASH

Meanwhile the below DASH ramps would be closed for a shorter period from 6pm 5th November to 5am 6th November;

·        Ramp 9F Persiaran Surian (for participant parking)

·        Ramp 9G Persiaran Surian

·        Ramp 10A Persiaran Kenanga (for participant parking)

·        Ramp 11A Persiaran Mahogani (for VIP access)

·        Ramp 12A Jalan PJU 8/1 Damansara Perdana



As for the closures on SPRINT highway, there would be a further nine (9) locations involved which will be closed by stages from 5th November ending at 1.01am on 6th November. The locations are;

·        Damansara Perdana (Ramp Penchala Link)

·        Mutiara Damansara (Penchala Link)

·        LDP North KM4.4 (IKEA)

·        LDP South KM3.5 (Empire Damansara)

·        Junction connecting Taman Tun Dr. Ismail (TTDI) to Penchala west bound

·        Junction connecting TTDI Kg. Sg. Penchala to Penchala (towards Mont Kiara)

·        Hartamas to Penchala exit west bound (towards LDP)

·        Kerinchi heading north connecting west Penchala (towards LDP)

·        Jalan Duta connecting to Penchala west bound (towards LDP)


We would like to advise road users to pre-plan their route on these days especially for those living in the area to avoid any delays due to the expected congestion. For those living in this area the Saturday traffic even on any normal days is already horrendous and this road closure is bound to make things worse. Try to use alternate routes when possible.   




Gallery

Tagged:

Road Closure
Damansara-Shah Alam Elevated Expressway (DASH)
Sarawak Volunteer Association (PSS)
Malaysian Highway Authority (LLM)
Sistem Penyuraian Trafik KL Barat (SPRINT)
Anak Sarawak LLM DASH Penchala Link Tunnel Night Run
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

2025 PJ Half Marathon Road Closures Start Tomorrow – Aug 16

PJ Half Marathon will see multiple road closures from Saturday evening.

Auto News

NPE & Besraya Road Closure For IJM Allianz Duo Highway Challenge 2025

IJM Allianz Duo Highway Challenge 2025 returns with pre-dawn flag-offs and road diversions across NPE and Besraya.

Auto News

Tuas Second Link Closed For Chemical Spill Emergency Drill on July 23

All Malaysia-bound lanes will be shut for a cross-border chemical spill simulation from 5AM to 2PM.

Auto News

RTS Link: Key Road Closure in JB Until End of 2026

Jalan Johor Bahru–Endau closed for 18 months starting June 3 as RTS construction ramps up.

Auto News

PDRM Set For Two-Day Dry Run Ahead Of 46th ASEAN Summit

PDRM set to simulate convoy movements in KL ahead of next week’s high-level 46th ASEAN Summit meetings.

Auto News

Xi Jinping’s Official Visit: 17 Key Routes Affected

PDRM will enforce road closures and diversions in Klang Valley and Putrajaya from April 15 to April 17for Chinese President Xi Jinping’s official visit.

Auto News

14 Roads Closed in Phases for King's Installation Ceremony on Saturday - July 20

14 roads would be closed in phases to facilitate traffic flow during the King’s Installation Ceremony this Saturday, 20 July.

Auto News

Agong's Farewell Ceremony - 7 Roads Closed On January 30

Seven (7) routes in the nation's capital will be completely closed on Tuesday (January 30), while 13 routes will be closed gradually in conjunction with the Yang di-Pertuan Agong farewell ceremony.

Latest News

Auto News

Upgraded Mitsubishi Eon Auto Mart 3S Centre Reopens in Melaka

Mitsubishi Motors Malaysia, together with Eon Auto Mart, announces the relocation and upgrade of its outlet in Melaka.

14-11-2025
Auto News

GWM Malaysia Accelerates Localisation Drive To Strengthen Supply Chain

GWM Malaysia strengthens local partnerships and production to support the nation’s new-energy mobility ambitions.

Auto News

PLUS Implements Night Contra-Flow On Elite Highway For Pipe Work

Motorists on the Elite Highway should expect a contra-flow from Nov 17–20 for pipe work.

14-11-2025
Auto News

Flat Rate, Rule of 78, Reducing Balance: How Hire-Purchase Loans Really Work

We break down a RM100,000 loan over seven years to show how reducing balance interest saves you money.

Auto News

Genting Highlands Set To Introduce Vehicle Fee to Boost Safety

Motorists heading to Genting Highlands will soon pay a fee to fund maintenance and safety on the 24 km private road.

Auto News

ACCCIM Calls For Gradual Enforcement Of Lorry Bridge Load Limits

ACCCIM urges a phased rollout of lorry bridge load limit rules to avoid disrupting logistics and the supply chain.

13-11-2025
Auto News

Malaysia’s First BYD Tech Discovery Day Kicks Off in KL – Nov 14-16, Plaza Arkadia

Malaysia’s first BYD Tech Discovery Day is set to take place later this week on Nov 14-16 at Plaza Arkadia, KL.

13-11-2025
Auto News

MOF: RM36.3B Collected from Vehicle Taxes Over Three Years

Import and excise duties alone contributed more than RM26 billion, underscoring the auto sector’s economic weight.