Link Copiedcheck_circle
Auto News

MRT Putrajaya Line Will Benefit 100,000 Passengers Daily When Launched

Kumeran Sagathevan

Share via


Mohd Azharuddin Mat Sah, Prasarana President and Group CEO yesterday announced that an estimated 100,000 Malaysians would benefit everyday with the opening of the Mass Rapid Transit (MRT) Putrajaya Line in March. This number are expected to grow steadily every year reported BERNAMA.


In totality, with the entire MRT connectivity both the Rapid buses and rail would see daily ridership bump from 722,000 in 2022 to an estimate of 1.2 million this year. He further added that the Putrajaya Line would be a milestone achieved for the group this year.


To recap, phase one of the MRT Putrajaya Line, which runs 17.5 km and comprises 12 stations, was launched back in 2022. The entire Putrajaya Line will house 36 stations spanning over 57.7 km and served by 49 units of four car train sets capable of carrying up to 1,200 passengers.


The Putrajaya Line interchange stations are Kwasa Damansara (with Kajang MRT Line), Sungai Buloh (with KTM), Sri Damansara Timur (with KTM), Kampung Batu (with KTM), Titiwangsa (with Ampang & Sri Petaling LRT Lines, KL Monorail), Ampang Park (with Kelana Jaya LRT Line), Tun Razak Exchange (with Kajang MRT Line), Chan Sow Lin (with Ampang & Sri Petaling LRT Lines), Sungai Besi (with Sri Petaling LRT Line) and Putrajaya Sentral (with ERL and KLIA Transit Lines).




Mohd Azharuddin further added that "Rapid Rail Sdn Bhd, a subsidiary of Prasarana, as the operator and MRT Corp, as the asset owner, are currently running extensive testing of the service,” and the exact launch date will be announced soon.


He further pressed that the Land Public Transport Agency (APAD) as the land transport governing body would also need to run tests and measure the effectiveness of the system in place before signing off for public use.

Furthermore Mohd Azharuddin said that the opening of the MRT Putrajaya Line will also aid in spurring business opportunities for small business and as now they are accessible easily. This concept was proven previously with the extension of the Light Rail Transit (LRT) network to Putra Heights.




With regards to Prasarana’s focus in 2023, Mohd Azharuddin mentioned that the focus for this year would be to increase service reliability in the rail systems. Passengers can see improved train frequencies especially during peak hours.


With regard to the Kelana Jaya LRT Line, Mohd Azharuddin says that "The LRT Kelana Jaya Line, most trains on this line are currently undergoing a special inspection and overhaul programme”. He is confident a train frequency of four minutes by August and three minutes by September 2023 can be met with the addition of new trains.


On a separate topic, Mohd Azharuddin did mention that the KL Monorail frequency would also be down to five minutes in quarter four 2023.


Tagged:

MRT Putrajaya Line Phase 2
Mass Rapid Transit Corporation Sdn Bhd (MRT Corp)
Light Rail Transit (LRT)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
"Too early to assess Putrajaya MRT route on peak-hour congestion" - Loke

"Too early to assess Putrajaya MRT route on peak-hour congestion" - Loke

It is still too early to assess the effectiveness of Putrajaya's MRT service in reducing traffic congestion, says Loke.

07-04-2023
Auto News
MRT Putrajaya Line Free Ride Ends Tomorrow March 31

MRT Putrajaya Line Free Ride Ends Tomorrow March 31

MRT Putrajaya Line free ride ends tomorrow on March 31.

30-03-2023
Auto News
PM Announces Free MRT Putrajaya Line Fares Until End Of March

PM Announces Free MRT Putrajaya Line Fares Until End Of March

PM inaugurated the full launch of MRT Putrajaya Line plus announced free fares starting March 16 to 31, 2023.

16-03-2023
Auto News
MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL

MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL

MRT Putrajaya Line Phase Two is expected to reduce traffic congestion to the city centre.

13-03-2023
Auto News
RapidKL Is Upgrading The LRT, MRT & Monorail Audio System

RapidKL Is Upgrading The LRT, MRT & Monorail Audio System

RapidKL is upgrading the LRT, MRT and Monorail audio system in phases prior to the MRT Putrajaya Line Phase 2 opening.

07-03-2023
Auto News
MRT Putrajaya Line Fully Operational Starting 16 Mar 2023, 3PM

MRT Putrajaya Line Fully Operational Starting 16 Mar 2023, 3PM

MRT Putrajaya Link (PYL) from Kwasa Damansara right up to Putrajaya Sentral would be fully operational starting 3pm, 16 Mar 2023

Auto News
Phase 2 Of The Putrajaya MRT Line 95% Completed - Prasarana

Phase 2 Of The Putrajaya MRT Line 95% Completed - Prasarana

Phase 2 of the Putrajaya MRT Line is more than 95% complete, with a final test scheduled for the end of this month.

24-02-2023
Auto News
MRT Putrajaya Line Phase Two To Have 4 Interchange & 2 Connecting Stations

MRT Putrajaya Line Phase Two To Have 4 Interchange & 2 Connecting Stations

There will be 4 new interchange stations and 2 new connection stations added along the MRT Putrajaya Line.

Latest News

Auto News
"RM100M Feels Like RM50M Now": Tun M Urges Malaysia To Buy Back Formula 1 Hosting Rights

"RM100M Feels Like RM50M Now": Tun M Urges Malaysia To Buy Back Formula 1 Hosting Rights

Tun Dr Mahathir urges Malaysia to buy back Formula 1 hosting rights for Sepang, arguing RM100M is affordable today. Read his podcast comments and cost breakdown.

13-08-2026
Auto News
11 Deaths In 4 Days: JPJ Introduces Mandatory Online Registration & 4-Photo Check For RXZ Members

11 Deaths In 4 Days: JPJ Introduces Mandatory Online Registration & 4-Photo Check For RXZ Members

After 11 fatal crashes during RXZ Members 8.0, JPJ mandates online registration, valid licenses, and 4 motorcycle photo uploads for future events. Read the full rules here.

13-08-2026
Auto News
Leaked Sepang F1 Ticket Prices Show RM200 MyKad Rate—But There’s A Catch

Leaked Sepang F1 Ticket Prices Show RM200 MyKad Rate—But There’s A Catch

Leaked F1 Sepang ticket prices show 3-day passes starting at RM200 for MyKad holders. Here is the full price breakdown and the strict verification rules you must know.

12-08-2026
Auto News
Why Are NEW Kei Cars Banned From Malaysian Showrooms, But OK To Buy Used From Recon Dealers?

Why Are NEW Kei Cars Banned From Malaysian Showrooms, But OK To Buy Used From Recon Dealers?

Ever wondered why new Kei cars aren't sold in Malaysian showrooms but thrive on recon lots? Here is how JPJ VTA rules and AP import regulations really work.

12-08-2026
Auto News
32 Robots & 10-Second Color Swaps: 5 Cool Things Inside Inokom’s New RM300M Kulim Facility

32 Robots & 10-Second Color Swaps: 5 Cool Things Inside Inokom’s New RM300M Kulim Facility

Inside Inokom's new RM300M Paint Shop 3 in Kulim, Kedah: 32 robots, 10-second color swaps, 60% CO2 reduction, and a 100% Malaysian workforce.

12-08-2026
Auto News
Everything You Need To Know About Kuching’s New Kia 3S Hub (Including Free Snacks & EV Readiness)

Everything You Need To Know About Kuching’s New Kia 3S Hub (Including Free Snacks & EV Readiness)

Looking for Kia in Kuching? Check out the new RM1.5M Kia 3S Centre on Jalan Abell featuring EV-ready servicing, a cozy lounge, and free snacks!

11-08-2026
Auto News
Over 55k Xpander & 28k Veloz Units On Our Roads: Can Hyundai STARGAZER Steal Sales From The Japanese Kings?

Over 55k Xpander & 28k Veloz Units On Our Roads: Can Hyundai STARGAZER Steal Sales From The Japanese Kings?

With 84k Xpander and Veloz units on Malaysian roads, can the new Hyundai STARGAZER (Est. RM99k) steal sales from Japanese rivals? We analyze specs, CBU launch plans, and HMY's CKD ambitions.

11-08-2026
Auto News
JPJ Inspected 12 Driving Schools In Kelantan & Issued 100 Notices For Various Offences

JPJ Inspected 12 Driving Schools In Kelantan & Issued 100 Notices For Various Offences

JPJ Kelantan audited 12 driving schools, inspecting 350 vehicles and issuing 100 notices for unsupervised 'L' drivers, missing badges, and expired road tax.

10-08-2026