Link Copiedcheck_circle
Auto News

Works Ministry Will carry out flood mitigation works on LPT1

Anis

Share via

361857489_824552759033029_7622794639427686946_n.jpg
The Works Ministry will carry out immediate flood mitigation works in 14 locations along the East Coast Expressway Phase 1 (LPT1) with an RM200 million allocation to prevent future floods, according to Bernama. According to Works Minister Datuk Seri Alexander Nanta Linggi, four incidents of flooding have occurred along LPT1 since its inception in 2004. The minister said that the highway was closed to all vehicles several days before due to floods that occurred in 2007, 2014, and twice in 2021, in January and December.

360096584_824552739033031_1927453439259498910_n.jpg

“Ten flood-prone locations have been identified, namely at Kilometre (KM) 84.7, KM112, KM113, KM114, KM115, KM116, KM117, KM124, KM126 and KM198. Four more locations at risk of flooding have also been identified, namely at KM156, KM178, KM242 and at Ramp A, Jabor Junction,”

“I have been briefed and seen the progress of this project. Currently, earthworks at KM117 and KM124 are being carried out and expected to be completed in October 2024,” he added.


Tagged:

LPT 1
East Coast Highway Phase 1 (LPT1)
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

LPT 1 Highway Closure, Flood Management To Commence

Hear ye, hear ye! The government has decided to close part of the East Coast Highway Phase 1 (LPT 1) for flood management works starting 1 October.

28-09-2022
Auto News

Over 35,000 Accidents, 730 Fatalities On LPT1 Since 2004

35,551 accidents occurred on the LPT1 from 2004 to Dec 2024, resulting in 730 fatalities.

22-04-2025
Auto News

AFA PRIME Bhd Issues TTA for KLK & LPT 1

AFA PRIME Bhd enhances traffic measures to ensure a smooth and safe Hari Raya Aidilfitri travel experience.

Auto News

TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.

Auto News

AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.

29-11-2024
Auto News

LPT3 Construction Cost Rises Three-Fold To RM9.8 Billion

LPT3 Highway Construction Cost Rises to RM9.8 Billion, Awaiting Cabinet Approval.

Auto News

LTU Section 5A: Raub Bypass Opens On Friday

The Section 5A: Raub Bypass of the Lingkaran Tengah Utama (LTU) Expressway opened last night, Friday, at 12:01

08-03-2024
Auto News

Abolish Gombak, Karak Toll Plazas To Alleviate Traffic Woes - Kubang Kerian MP

Kubang Kerian MP Datuk Seri Tuan Ibrahim urged the government to think about eliminating the Gombak and Karak Toll Plazas to reduce traffic.

05-03-2024

Latest News

Auto News

MBPP Pioneers Strata Scheme For Abandoned Vehicles

Penang city council (MBPP) pioneer’s Strata Scheme for Abandoned Vehicles in housing areas using e-Dereg system.

22-09-2025
Auto News

KLIA Tout Arrested After RM800 Tourist Scam

JPJ detains tout and seizes car after viral case of two Chinese tourists being overcharged and trapped in KLIA ride.

22-09-2025
Auto News

MyKad is the Best Option for RON95 Subsidy, No New Card Required – MoF

Using MyKad to get the RON95 subsidy is the best option, with no new cards required, says the Second Finance Minister.

22-09-2025
Auto News

Malaysians Will Enjoy 300L of Petrol at RM1.99 Per Litre A Month - PMX

BUDI95 programme gives every eligible Malaysian 300 litres of subsidised RON95 monthly.

22-09-2025
Auto News

RM3.5m From Plate Sales To Protect 50,000 Drivers

MOT is using RM3.5m from special number plate sales to fund social security coverage for taxi, rental car, and school bus drivers nationwide.

22-09-2025
Auto News

Low SKPS Registrations As Drivers Struggle With Digital Process

Low awareness and digital hurdles are keeping many taxi and bus operators from signing up for the RON95 subsidy scheme.

22-09-2025
Auto News

ECRL Work Halted - Petronas Gas Pipeline Leak, Safety Zone Declared

Petronas Gas pipeline leak at the ECRL project has halted works, emergency crews racing to purge butane gas.

Auto News

RON95 Subsidy: App, Counters and Terminals Payment Options; SKPS Up Take Low

RON95 subsidy eligibility status, access and verification done via apps, counters and terminals; SKPS registrations remain low.