Link Copiedcheck_circle
EV

CPOs Given Two-Years To Registration All Functioning EV Charging Bay!

Kumeran Sagathevan

Share via

CPO-2-years-reg-caricarz-(2).jpg

Nga Kor Ming, the Minister of Local Government Development, has established a two-year window for charger point operators (CPO) to submit requests to local authorities for already-installed, fully functional electric vehicle charging bays (EVCBs) reported The Star. With this project, PLANMalaysia and the Malaysian Fire and Rescue Department (JBPM) hope to make sure these operators abide by their planning and fire safety criteria.

There are 1,246 EVCBs in use as of August 30, 2023, of which 1,007 are alternating current (AC) type devices and 239 are direct current (DC) type devices. These public charging stations can be found in places like shopping centres, auto dealerships, hotels, and resorts.

CPO-2-years-reg-caricarz-(3).jpg

The Electric Vehicle Charging Bay Planning Guidelines (EVCB GPP) and the application processes have received approval from the National Physical Planning Council and will go into effect on September 18 of this year. The application process will be streamlined and accelerated by the four primary activities introduced in these guidelines.

First, utility companies like Tenaga Nasional Bhd (TNB) must be consulted by charger point operators who intend to install EVCBs in existing buildings. Depending on the device type, design, and location (indoor, outdoor, or open rooftop), the approval procedure normally takes seven to fourteen days. Departments of the local authority, such as the Engineering Department and Building Control Department, will be permitted to offer certification. A certified consultant will be in charge of the ministry's implementation of a self-regulation or self-assessment process.

VFB-EVCB-(1).png

Nga urges CPOs to give the construction of EVCBs in outdoor settings top priority. The National Electric Vehicle Charging Station Dashboard, developed by PLANMalaysia, also identifies 10,596 potential sites for EVCB installations. For business professionals and investors, this saves time.

The EVCB GPP offers recommendations on how to design and prepare for the installation of EVCBs in both new and existing developments while taking the type of charging device into consideration. The location and positioning of EVCBs, the necessary amount and size, the availability of a main electrical isolation switch, and the necessary fire safety criteria are all covered by these recommendations.

Q3-ChargeSini-(THUMB).jpeg

By installing 10,000 EVCBs nationally by 2025, the government demonstrates its commitment to the development of the nation's electric car infrastructure.



Tagged:

Charge Point Operator (CPO)
Jabatan Perancangan Bandar Dan Desa (PLANMalaysia)
Malaysian Fire and Rescue Department (JBPM)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

EV

Malaysia Leads Thailand in EV Charger Ratio

Malaysia leads ahead of Thailand in charger ratio for now, but looming policy gaps could stall future growth.

EV

TNB’s Gurun DCFC: 100% Taken, 50% Delivered, Why?

TNB’s Gurun setup underdelivers on power and over-reserves the grid, leaving little room for others.

EV

PRO-NET Partners ChargeSini,Other CPOs, For EV Charging At Condos

PRO-NET partners ChargeSini and other leading CPOs to bring affordable, convenient EV charging to over 1,000 high-rises across Malaysia.

EV

Perak Charges Ahead with EV Tourism and Official Fleet Plans

Public-private initiative powers tourism in Perak state, wider EV adoption hinted too.

EV

PETRA Pledges 10,000 EV Charging Stations by Year-End

Fadillah stresses the need for EV chargers in urban and rural areas, aims for 10,000 stations nationwide by year-end.

EV

DC Handal Joins CPO Price War - RM1/kWh DC Fast Charging!

DC Handal joins JomCharge’s price war with RM1/kWh DC Fast Charging - can CPOs sustain it?

EV

Report: TIME dotCom Enters CPO Space After Acquiring 51% Of Charge N Go

Local ISP TIME dotCom enters CPO space after reportedly acquiring 51% of Charge N Go, rebrands as Time Charge N Go now.

15-04-2024
EV

CPOs Believe 10,000 EVCB Target Doable, Approval Process Needs Streamlining

Tengku Zafrul - CPO believes the EVCB target set by the government is achievable, NEVSC to help streamline approval processes.

Latest News

EV

JomCharge Introduces New Elite Plan at RM9.90/Month

New JomCharge Elite plan gives EV users 10% off charging at over 1,000 stations for just RM9.90/month.

EV

Freelander Returns As Chery and Land Rover’s New EV SUV

The Freelander name is back, this time as an EV SUV developed by Chery and Land Rover.

EV

Exeed Exlantis E05 EREV Unveiled Ahead of Munich Debut

Previewed in China ahead of its Munich Motor Show debut is the new Exeed Exlantix E05 mid-size EREV SUV.

30-07-2025
EV

AFA in Effect: 1.45 sen/kWh Rebate Lowers EV Charging Costs This August

The first AFA-based adjustment offers direct savings for high-usage households, including EV owners.

EV

RHD Avatr 11 Launches in Singapore - Malaysia Next?

RHD version of the Avatr 11 debuts in Singapore, prompting speculation of a possible launch in Malaysia soon.

EV

Honda N-One e: Unveiled – Kei EV with 270 KM WLTP Range

The Honda N-One e: was unveiled as the production version of the Super EV Concept, featuring up to 270 km of WLTP range.

29-07-2025
EV

Thailand Cuts EV Taxes for Carmakers Using Local Parts

EVs with more Thai-made components may soon pay less excise duty under a new tax overhaul.

EV

New EV Alliance Aims to End App Chaos for Malaysian Drivers

Malaysia’s top CPOs are building a tech-driven alliance to simplify EV charging and push back against aggregator disruption.