Link Copiedcheck_circle
Auto News

SKL Inks MoU With MTD Construction – 53 KM Highway Network In Klang Valley

Kumeran Sagathevan

Share via

SKL-MOU-(3).jpg


Sungai Klang Link Sdn. Bhd. (SKL) has signed a Memorandum of Understanding (MoU) with MTD Construction Sdn. Bhd. (MTDC) to collaborate in the development and construction of a new highway project here in Klang Valley.


SKL-MOU-(4).jpg


The proposed 53 KM highway in the Klang Valley area runs parallel to the Klang River, which also will be integrated with the existing highway network through seven interchanges. This new network will start at the West Coast Expressway (WCE) interchange in Bukit Raja, Klang and end at the New Pantai Expressway 2 (NPE 2) interchange in Kuala Lumpur.


SKL-MOU-(2).jpg


The highway project was presented to the government by SKL as the concession holder through the build, own, and operate method. The proposed highway is currently in the final stages of government approval.

Under this newly-penned MoU, MTD Group will contribute in the planning, construction, and phased completion of the highway, which includes offering of comprehensive services, manpower, materials, and equipment. Additionally, the group is also tasked in the operation and maintenance of the highway once the construction has been completed.


Tagged:

Sungai Klang Link
MTD Group
WCE Expressway
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News

WCE: Six New Toll Plazas Planned Along Melaka’s 69 KM Stretch

WCE set to add six new tolls along Melaka’s 69 KM stretch to ease congestion and spread out traffic flow.

Auto News

Hari Raya 2025: Over 140K Vehicles Expected Daily on WCE

Over 140,000 vehicles are expected to use the WCE daily during this upcoming Hari Raya Aidilfitri festive season.

24-03-2025
Auto News

WCE Section 1 Is Toll-Free Until Sept 29 Ahead Of National Day

Public Works Minister Datuk Seri Alexander Nanta Linggi announced that users of the WCE passing through the Banting Interchange Section 1 are eligible for free toll starting tonight at 12.01 until Sept 29, 11.59pm.

30-08-2024
Auto News

WCE Section 11 Toll Collection Starts From July 24

WCE starts collecting toll fees from July 24, 2024 for Section 11 that spans Taiping Selatan, Trong and Beruas.

Auto News

Hari Raya 2024: WCE Expects 150,000 Cars From 6 To 17 April, 2024

WCE estimates 150,000 cars to use its highway during the Hari Raya celebrations, starting April 6, 2024.

Auto News

Raya 2023, Over 3 Million vehicles Expected To Enter Perak

More than 3 million vehicles are expected to enter Perak starting this Friday until Sunday.

19-04-2023

Latest News

Auto News

Chery Malaysia Outlines 2026 Plans, Four New SUVs Confirmed

Chery Malaysia outlines 2026 plans, with four new SUVs confirmed as the brand shifts focus toward premium and lifestyle models.

Auto News

ECRL Fares To Be Announced Ahead of 2027 Launch

ECRL fares will be disclosed several months prior to the commencement of operations in January 2027, according to Transport Minister.

30-01-2026
Auto News

Summons Discounts for Foreign Vehicles Will Be Reviewed – MOT

The Transport Ministry will review traffic summons discounts offered to foreign vehicles, says minister Anthony Loke.

30-01-2026
Auto News

Hyundai Expands Dealer Network and Insurance Partnerships

Hyundai Motor Malaysia partners with HZN and top insurers to enhance customer access and vehicle protection.

30-01-2026
Auto News

JPJ Rolls Out Flexible Road Tax Renewal For E-Hailing Vehicles

E-hailing drivers can now renew their road tax from one to 12 months, making compliance easier and more cost-effective.

30-01-2026
Auto News

Scrap Your Old Car, Get Up To RM4,000 For A New Proton

Scrap your old car and get up to RM4,000 towards a new Proton with trade-in incentives and a government grant.

Auto News

Traffic Diversions at 12 KL Intersections for 2026 Thaipusam

Traffic diversions at 12 KL intersections will be carried out in stages 2026 Thaipusam.

Auto News

Is GWM Seeking To Build Its Own Plant in Malaysia?

MITI raises prospects of a standalone GWM factory as newly launched Wey G9 begins production with 40% local content.