Link Copiedcheck_circle
Auto News

Abolish Gombak, Karak Toll Plazas To Alleviate Traffic Woes - Kubang Kerian MP

Anis

Share via

image-full_normal---2024-03-05T090745.699.jpg The government has been urged by Kubang Kerian MP Datuk Seri Tuan Ibrahim Tuan Man to think about eliminating the Gombak and Karak Toll Plazas in order to reduce traffic, especially on the East Coast Highway.

The suggestion from the opposition MP drew attention to the nation's deteriorating traffic conditions, particularly in the vicinity of toll plazas.

Untitled-design---2024-03-05T090858.088.png
He stated during royal address debate in the Dewan Rakyat, "The East Coast Highway, for example, has four toll plazas that force drivers to stop: Gombak, Bentong, Karak, and the exit plazas."

Tuan Ibrahim suggested two strategies to lessen the load on drivers; entry/exit system, a system that only requires drivers to pay tolls when they enter and leave the highway.


image-full_normal---2024-03-05T090751.310.jpg

The other strategy is to eliminate toll plazas; because the Gombak and Karak toll plazas exacerbate traffic congestion and delays, they should be completely removed.
He also urged authorities to reconsider the timing of road repairs to reduce user inconvenience.

Tagged:

Karak toll
Gombak toll
East Coast Highway Phase 1 (LPT1)
LPT 2
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi

Works minister Datuk Seri Alexander Nanta Linggi has confirmed that the government has no plan to abolish Gombak and Karak tolls.

11-03-2024
Auto News

No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi

Works minister Datuk Seri Alexander Nanta Linggi has confirmed that the government has no plan to abolish Gombak and Karak tolls.

11-03-2024
Auto News

Deepavali 2025: AFA Issues TTA For KL-Karak Highway & LPT 1

AFA issues KLK and LPT1 Deepavali 2025 TTA as traffic is projected to rise by 59%.

Auto News

Over 35,000 Accidents, 730 Fatalities On LPT1 Since 2004

35,551 accidents occurred on the LPT1 from 2004 to Dec 2024, resulting in 730 fatalities.

22-04-2025
Auto News

AFA PRIME Bhd Issues TTA for KLK & LPT 1

AFA PRIME Bhd enhances traffic measures to ensure a smooth and safe Hari Raya Aidilfitri travel experience.

Auto News

TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.

Auto News

AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.

29-11-2024
Auto News

LPT3 Construction Cost Rises Three-Fold To RM9.8 Billion

LPT3 Highway Construction Cost Rises to RM9.8 Billion, Awaiting Cabinet Approval.

Latest News

Auto News

Leapmotor B10 Open For Bookings – Est. From RM110,000

Early bookings now opened for upcoming new Leapmotor B10 EV C-SUV with estimate starting price of RM110,000.

17-11-2025
Auto News

MTSB Memorandum Set to Be Presented to Cabinet Soon – Loke

The memorandum for the Malaysian Transport Safety Board will be presented to the Cabinet soon, says Transport Minister Anthony Loke.

17-11-2025
Auto News

Mitsubishi Destinator Earns 5 Stars ASEAN NCAP Rating

Mitsubishi’s all-new Destinator secures 5-star ASEAN NCAP rating, reinforcing its readiness for the region.

Auto News

Malaysia Autoshow Expands With Penang And Johor Editions In 2026

Malaysia Autoshow by MARii expands with Penang and Johor editions in 2026.

17-11-2025
Auto News

Three Laws To Be Updated For MLFF Toll System - Ahmad Maslan

The government will revise key road laws before launching the Multi-Lane Free Flow (MLFF) system.

17-11-2025
Auto News

Gua Musang-Jeli Road To Reopen By Month-End After Sinkhole Repairs

KM 11.95 of the Gua Musang-Jeli Road is being repaired after a sinkhole and landslide.

17-11-2025
Auto News

RTS Link: First Train Arrives In Johor, Testing Kicks Off At Wadi Hana Depot

Train Set 02 has arrived at Wadi Hana Depot, marking the start of critical testing and commissioning.

17-11-2025
Auto News

Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues

KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.

17-11-2025