Link Copiedcheck_circle
Auto News

No Plans To Abolish Karak, Gombak Tolls To Alleviate Traffic - Nanta Linggi

Anis

Share via

Untitled-design---2024-03-11T104031.381.png

Earlier this week, PAS deputy president Datuk Seri Tuan Ibrahim Tuan Man proposed that the government close the Gombak and Karak toll plazas on the Kuala Lumpur-Karak Expressway (KLK) and East Coast Expressway (ECE) to alleviate highway congestion.

The opposition lawmaker suggested two strategies to lessen the load on drivers; entry/exit system, a system that only requires drivers to pay tolls when they enter and leave the highway.

However, works minister Datuk Seri Alexander Nanta Linggi has rejected the proposal, according to the New Straits Times.

Speaking at the opening of section 5 of the Raub bypass on the Central Spine Road (CSR) yesterday, Nanta Linggi stated that abolishing tolls on the Karak and ECE highways would result in higher road maintenance costs, which the government would bear. FW1047361_KL18_16052020_TINJAUAN-lpr.jpg


“At the moment, we have no plans to abolish the tolls,” he said. “We need the [toll] funds for highway maintenance and to ensure the safety of road users. If the tolls are abolished, the government will have to secure funds to maintain the highway and plan maintenance works. A lack of funds will jeopardise [maintaining the highways].”

Apart from confirming that the government does not intend to shut down the previously mentioned toll plazas, Nanta Linggi added that there have been no conversations about putting in place an open payment toll collection system on the Karak highway.

“Open payment has not been discussed. Open payment on the KLK needs to be studied, and if there is a need, it has to be fine-tuned," he added.

Tagged:

Kuala Lumpur-Karak Expressway (KLK)
Gombak toll
Karak toll
proposal to abolish Karak toll
Proposal to abolish GOmbak toll
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

Kuantan-Bound KL-Karak Lanes Diverted For ECRL Work Until Aug 31

Kuantan-bound lanes (KM25.75–KM26.39) are being diverted for ECRL works until Aug 31.

10-07-2025
Auto News

KL-Karak Highway Expansion Project Set to Begin in Q2 2025

AFA Prime Berhad announces that the KL-Karak highway expansion project is set to commence in Q2 2025.

20-05-2025
Auto News

TTA: 63% Traffic Surge On KLK and LPT1 Expected During CNY 2025

KLK and LPT1 expects traffic volume to increase by 63% and has issued Travel Time Advisory starting 25 Jan to 2 Feb, 2025.

Auto News

KL-Karak Highway Tolls Now Accept Debit and Credit Cards

KL-Karak Highway tolls now accept debit and credit card payments at its Gombak and Bentong Plazas.

Auto News

AFA Allocates RM2.1b For KL-Karak Highway Widening Project; Scheduled To Begin Jan 2025

AFA allocates RM2.1 billion for the KL-Karak highway widening project which is set to begin in Jan 2025.

29-11-2024
Auto News

KL-Karak Highway Road Widening Set to Begin in Jan 2025

KL-Karak Highway road widening exercise to begin in Jan 2025 at the cost of RM2.1 Billion.

Auto News

Smart Lane Not Implemented on KLK Due to Hilly Conditions – KKR

Works Minister says that Smart Lanes cannot be implemented on the KL-Karak highway due to its hilly conditions.

30-07-2024
Auto News

KL-Karak Highway Widening Project Starts This Year

The federal government has approved a project to widen the Kuala Lumpur-Karak Expressway as a means of reducing traffic congestion.

02-02-2024

Latest News

Auto News

PLUS To Close Two Bangi Ramps Nightly Until Nov 28

PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.

10-11-2025
Auto News

KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance

KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.

10-11-2025
Auto News

4.4 Mil Old Vehicles Threaten Road Safety, Incentive Alone Insufficient

JPJ data shows over 4.4 million old vehicles are still on the road making up about 17% of the country’s 25.7m active vehicles.

10-11-2025
Auto News

Proton Shifts 15,575 Units In Oct 2025, Outgoing Saga Still Leads

Proton closes Oct 2025 by shifting 15,575 units, outgoing Saga sales spikes to 12-year high ahead of successor’s debut.

10-11-2025
Auto News

JPJ Warns Public Against Fake “Free Driving Licence” TikTok Scams

JPJ has warned the public about fake TikTok posts claiming people can get free driving licences without any tests.

10-11-2025
Auto News

RM3b Juru–Sungai Dua Link Cuts Travel Time To Just 20 Minutes

RM3 billion traffic dispersal project aims to slash travel time between Juru and Sungai Dua from an hour to just 20 minutes.

Auto News

Nanta: Barrier-Free ANPR Toll System Still at RFP Stage

The Works Ministry is inviting proposals for an ANPR-based barrier-free MLFF toll system.

Auto News

New Leapmotor 3S Showroom Opens In Ipoh, Perak

Perak state capital of Ipoh gains new Leapmotor brand 3S showroom and service outlet operated by dealers CST Auto.

07-11-2025