- News
- Auto News
- Penang Second Bridge Lane Closure for Cable Inspection – 23 To 25 April
Penang Second Bridge Lane Closure for Cable Inspection – 23 To 25 April

Jambatan Kedua Sdn Bhd (JKSB) has taken to its social media to announce a temporary lane closure at the Sultan Abdul Halim Mu'adzam Shah Bridge (Penang Second Bridge). The stretch that would be affected by this closure is from KM 12.5 to KM 18.5 heading both ways.
This closure is scheduled to take place starting from April 23 (Tuesday) to April 25 (Thursday) at 9am to 5pm daily. JKSB will also be activating contra lanes during the period to help mitigate traffic accordingly.

According to JKSB further, the lane closure is to facilitate cable inspection work and the public is advised to adhere to all directional sign boards placed throughout the stretch.
Should there be any need to reach out, JKSB can be contacted via their hotline at 1-300-30-2828.
Tagged:
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

