Link Copiedcheck_circle
Auto News

Additional RM100 Million Allocated To Maintain, Fix Federal Roads

Thoriq Azmi

Share via

KKR-Road-works---theStar.jpg

Federal road repairs conducted by the Public Works Ministry (KKR). (Image: The Star)


The government has reportedly approved an additional budget allocation worth RM100 million for the maintenance and repair of federal roads across Peninsular Malaysia, reports local newswire Bernama recently.

According to Deputy Works Minister Datuk Ahmad Maslan, said funds will be utilised for periodic maintenance work on pavement and non-pavement roads. He adds that RM70 million will be used for 79 periodic pavement maintenance work, with the remaining RM30 million allocated for 200 on-pavement periodic maintenance works.

The Deputy Minister clarified that pavement road maintenance works involved repairing damaged pavements and road structures using milling and paving, overlay, road structure reconstruction and resurfacing.

Non-pavement periodic maintenance, on the other hand, covers repairing road assets other than pavements and road structures. This includes painting road lines, maintaining bridges, fixing drains, as well as repairing signs and barriers.

“For the southern zone, which consists of Johor, Negeri Sembilan and Melaka, we are offering 18 periodic pavement works worth RM15.06 million, and 36 non-pavement works worth RM6.5 million,” added Datuk Ahmad Maslan. Altogether, this represent a fifth of the total additional funds allocated.

The Deputy Minister even highlighted that Johor state received the largest allocation totalling at RM11.75 million. He reportedly confirmed this whilst speaking at the Peninsular Malaysia-Southern Zone Federal Road Maintenance Programme 2024.

From which, RM8.05 million will be spent on 10 periodic pavement road maintenance works.  For non-pavement periodic maintenance, the state received RM3.7 million for 36 maintenance works.

Whilst this is a welcomed initiative, it’s worth highlighting that the additional allocation won’t rectify everything – more will be needed. Works Minister Datuk Seri Alexander Nanta Linggi had previously raised that RM4 billion was needed to annually maintain all federal road stretches in the country, but only RM1 billion has been allocated annually for decades instead.




Tagged:

Public Works Ministry (KKR)
Datuk Seri Ahmad Maslan
RM100 million
federal roads Malaysia
Share This Article

Written By

Thoriq Azmi

Former DJ turned driver, rider and story-teller. I drive, I ride, and I string words together about it all. [#FuelledByThoriq] IG: https://www.instagram.com/fuelledbythoriq/

Share via

Related News

Auto News
East-West Highway Sees Over 250 Crashes As Of June 2025

East-West Highway Sees Over 250 Crashes As Of June 2025

JRTB saw 257 accidents involving 442 vehicles between Jan and June, mostly cars, followed by MPVs, motorcycles, and lorries.

28-07-2025
Auto News
East-West Highway Safe, More Upgrades Coming - Works Minister

East-West Highway Safe, More Upgrades Coming - Works Minister

The Works Ministry told Bernama the JRTB is safe for users, but more upgrades are on the way under the 13th Malaysia Plan.

22-07-2025
Auto News
KKR: RM94 Million Spent on Restoring Roads After 2024 Floods

KKR: RM94 Million Spent on Restoring Roads After 2024 Floods

The government spent RM94 million to restore roads and infrastructure damaged by the 2024 floods, with most repairs now completed.

Auto News
KKR Only Gets Half of RM4B Needed for Road Repairs – Ahmad Maslan

KKR Only Gets Half of RM4B Needed for Road Repairs – Ahmad Maslan

The Public Works Ministry only received half of the RM 4 billion required to repair the damaged roads in Malaysia.

30-06-2025
Auto News
Potholes Must Be Fixed Within 24 Hours - Works Minister

Potholes Must Be Fixed Within 24 Hours - Works Minister

The Works Minister urged the Federal road concessionaires to temporarily patch damaged roads within 24 hours.

24-03-2025
Auto News
Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Report: Over RM1.9 billion Spent To Maintain Pen. Malaysia Roads In 2024

Works Minister revealed over RM1.9 billion was spent to maintain roads in 11 states across Peninsular Malaysia in 2024.

26-02-2025
Auto News
1,577 High-Risk Slopes Identified In Malaysia - KKR

1,577 High-Risk Slopes Identified In Malaysia - KKR

KKR has identified that 1,577 of the 34,714 slopes along Federal Roads nationwide are at very high risk.

06-11-2024
Auto News
KKR Seeking RM20 Million To Build R&R Along LTU Highway

KKR Seeking RM20 Million To Build R&R Along LTU Highway

Works Ministry seeks RM20 million budget allocation to set-up R&R along LTU Highway.

Latest News

Auto News
KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN Probes SG Driver Sighted Pumping RON95 in Johor

KPDN is probing a viral incident where a Singapore-registered car was seen pumping subsidised RON95 fuel.

Auto News
Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

Traffic along the NSE near Tangkak will be diverted in both directions from Aug 5 for bridge construction.

04-08-2025
Auto News
1,489 Summonses Issued in VEP Enforcement Operation – JPJ

1,489 Summonses Issued in VEP Enforcement Operation – JPJ

JPJ has issued a total of 1,489 summonses during an enforcement operation on VEP at the JB-Singapore land border.

04-08-2025
Auto News
No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

No Green Light Yet For Cross-Border Ride-Hailing Between SG, JB.

Singapore holds off on cross-border ride-hailing plans, opting instead to improve its existing taxi scheme with Malaysia.

04-08-2025
Auto News
RM110 Million Collected from Special Plate Sales Since 2023 – MoT

RM110 Million Collected from Special Plate Sales Since 2023 – MoT

A total of RM110 million has been collected from sales of special number plates since 2023, the Transport Ministry says.

04-08-2025
Auto News
Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

Nanta: 80% of Accidents Driver-Linked, Road Budget 70% Short

With 80% of accidents linked to drivers, the Works Ministry still grapples with limited funds to fix and rebuild roads.

Auto News
LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

LRT3 Shah Alam Line Opening Could Be Delayed to Oct 31 – Report

The LRT3 Shah Alam line opening could be delayed until Oct 31 instead of the planned launch date of Sept 30.

04-08-2025
Auto News
ETS to JB Sentral ‘On Track’, But Not Quite There Yet

ETS to JB Sentral ‘On Track’, But Not Quite There Yet

KTMB says electrification works between Kluang to JB Sentral are ongoing and the extension will proceed once conditions are met.