Link Copiedcheck_circle
Auto News

KL Sentral Redevelopment Set to Commence in Early 2025 – MOT

Mukhlis Azman

Share via

Minister-of-Transport-YB-Anthony-Loke.jpgredone-kl-sentral-(3).jpg

The Ministry of Transport anticipates that the redevelopment of KL Sentral station will begin early next year.

The Ministry of Transport (MOT) anticipates that the redevelopment work for the Kuala Lumpur Sentral Station (KL Sentral) is slated to commence in early 2025, Bernama reports.

According to its minister, YB Anthony Loke, the terms and conditions for the Public-Private partnership (PPP) redevelopment project are still under negotiation between the government’s Public-Private Partnership Unit (UKAS) and the developer, Malaysian Resources Corp Bhd (MRCB).

“We must finalise the agreement first before we can start the construction. So we hope that the negotiation can be completed within this year, in the next two or three months, and hopefully, the project can begin by early next year,” Loke said to Bernama during the MOT press conference earlier today.

“With PPP, the entire cost will be borne by the developer. In return, the developer will receive the air rights, which allows them to construct a building on top of the station, creating a mixed-use development,” the MOT minister added.

200323-rapid-kl-LRT.jpgKTM-ETS-Train-(1).jpg

The minister was asked to comment on the progress of the KL Sentral redevelopment project, which was previously reported to begin in late 2024. Aside from that, Loke also made an assurance that the upcoming redevelopment project won’t interfere with the KL Sentral’s daily operations and public transport services such as LRT, KTM, and ETS.

The KL Sentral redevelopment project was billed by the government last year in a bid to address the increasing congestion of commuters and vehicles around the central station. The whole redevelopment project is estimated to cost around RM 1 billion, which will be borne by the developer as part of the aforementioned deal with the PPP.

Source: Bernama


Gallery

Tagged:

Minister Of Transport (MOT)
KL Sentral
Minister of Transport YB Anthony Loke
KL Sentral Redevelopment Project
Kuala Lumpur Sentral
Share This Article

Written By

Mukhlis Azman

An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman

Share via

Related News

Auto News

MOT Reviewing Platform Screen Doors For LRT Following Blind Passenger’s Death

MOT is considering platform gates at Kelana Jaya and Ampang LRT stations after a fatal accident involving a blind commuter.

10-09-2025
EV

UMWT Hands Over xEV Fleet to MOT

UMW Toyota Motor (UMWT) delivers xEV fleet to MOT, effort reinforces its role in innovating and shaping sustainable mobility policy.

Auto News

MOT: Special Electricity Tariff For Public Transport Operators

MOT mooting special electricity tariffs for public transport operators to ease their burden.

Auto News

AWAS Cameras Will Soon Implement Point-To-Point Method

AWAS cameras will be implemented using a point-to-point method instead of the static method that was previously used.

07-01-2025
Auto News

MOT Unveils 2025 Road Safety Strategy

MOT 2025 Roadmap: Stricter enforcement and new tech to curb heavy vehicle accidents.

Auto News

MOT Will Address Vehicle Inspection Compliance Loopholes

MOT commits to close vehicle inspection loopholes, including inspection-only tyre swaps, to boost road safety.

Auto News

JPJ Probes Puspakom Staff For Passing Unsafe Vehicle Inspection

JPJ’s surprise inspection at Puspakom uncovered several safety violations.

Auto News

Amendment In Road Transport Act To Curb “Mat Rempit” Issue

MOT is finalising amendments to the Road Transport Act which will deter the rampant “Mat Rempit” issue.

Latest News

Auto News

Amir Hamzah: No Daily Refuel Limits Under Budi95 For Now

Amir Hamzah: No limit on daily refuels, data analytics to monitor RM1.99 subsidy use to detect abuse.

Auto News

New RM22.7M JPJ Kajang Office Set for 2027

The new RM22.7M JPJ Kajang office will feature modern facilities and improved services for the public by 2027.

23-09-2025
Auto News

ECRL Project Hits 87% Completion by August 2025 – MoT

The ECRL project has recorded 87% overall completion as of August 2025, said Transport Minister Anthony Loke.

23-09-2025
Auto News

Amir Hamzah: No Back-to-Back Pumping of RM1.99 RON95 A Day

Amir Hamzah: Govt. won't allow multiple subsidised refuels in a day as BUDI95 takes effect Sept 30.

Auto News

Petron Lubricants Gains SIRIM Certification & Label

Petron Malaysia acquires SIRIM genuine product licence certification and label for engine lubricant product line-up.

23-09-2025
Auto News

Govt Will Allow Commercial RV Rentals from 2026 - Loke

Starting January 2026, RVs can be licensed for commercial use, making self-drive RV holidays safer and regulated.

23-09-2025
Auto News

BUDI95: RON95 Ban on Foreign Cars Still On, RM1.99 for Malaysians

BUDI95 keeps foreign-registered cars out of subsidised RON95, only Malaysians with local vehicles can pump at RM1.99 per litre.

Auto News

Rapid Rail Set To Launch Real-Time Crowd Tracking & AI Security

Rapid Rail will introduce a live tracker showing coach crowd levels so commuters can board with less stress.

23-09-2025