Link Copiedcheck_circle
Auto News

Mutiara Line LRT: Penang’s RM8.3 Billion Connectivity Investment

Kumeran Sagathevan

Share via

472941840_18459635722068331_1408441763356009734_n.jpg


Transport Minister Anthony Loke recently oversaw the signing of a contract between assigned project developers MRT Corporation and asset owner SRS Consortium. Together, both are set to build the first segment of Penang’s Mutiara Line, the state’s first light rail transit (LRT) project.

The contract for this phase is valued at RM8.31 Billion, excluding land acquisition costs which will be funded by the federal government, with efforts to minimise costs through ongoing negotiations.


473532189_18459635692068331_7654155955945122492_n.jpg


The Mutiara Line will span 29.5 KM and feature 21 stations, starting from Penang South Reclamation Island-A (PSR-A) and ending at Penang Sentral and the Tun Abdul Razak Complex (Komtar). A provisional station will also be located on PSR-A.

The line includes three interchange stations: Komtar, Macallum (connecting Penang Sentral and Komtar) and Penang Sentral, which will link with KTM Komuter, ETS, and potential future metro lines.


Penang-LRT-(3).jpg


The project is divided into three tenders:

Tender 1: The first package, awarded to SRS Consortium, involves construction of 19 stations over 23.7 KM from PSR-A to Komtar. This segment’s total alignment length is 29.5 KM in a single direction.

Tender 2: Covering the extension from Macallum to Penang Sentral on Seberang Prai, this package includes a 6 KM alignment with a 3.2 KM sea-crossing bridge. The tender is expected to open in Q3 2025 and has attracted significant interest from both local and international bidders.

Tender 3: The Systems Turnkey Contract (STC) focuses on railway systems, encompassing design, procurement, construction, testing, commissioning, and maintenance. This tender opened on Dec 13, 2024, with submissions due by April 14, 2025. A second briefing is scheduled for Jan 14, 2025, in Kuala Lumpur.


2024-04-02-Penang-LRT.jpg


The upcoming LRT system will feature Grade 3 Automation driverless electric trains with each train car designed to accommodate up to 405 passengers. Initial operations will see trains running at four-minute intervals to minimise waiting times.

Additionally, to enhance commuter convenience, all stations will include Park N Ride facilities with over 1,000 parking bays available for both cars and motorcycles.

Loke has reaffirmed the federal government’s commitment to managing costs effectively, even with potential land acquisition expenses. He emphasised that negotiations with Penang state government will focus on ensuring nominal land charges through a fair and collaborative approach.




Tagged:

Penang Mutiara Line LRT Project
Mutiara Line LRT
Mass Rapid Transit Corporation Sdn Bhd (MRT Corp)
SRS Consortium Sdn Bhd (SRS)
KTM LRT
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core

Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core

MRT Corp opens a three-month public review for the Penang Mutiara LRT, featuring a proposed six-kilometre cross-sea link to Penang Sentral.

23-02-2026
Auto News
Penang Mutiara LRT Construction Kicks Off Jan 2026

Penang Mutiara LRT Construction Kicks Off Jan 2026

Penang Mutiara Line LRT starts in Jan 2026, with traffic management measures ready to minimise disruptions.

19-11-2025
Auto News
Penang Sentral Set to Become Mainland’s Integrated Transport Hub

Penang Sentral Set to Become Mainland’s Integrated Transport Hub

The Butterworth KTM station, Mutiara Line LRT, and airport expansions will turn Penang Sentral into key transport and logistics hub.

Auto News
Penang Defends Mega Projects As Key To Tackling Traffic Woes

Penang Defends Mega Projects As Key To Tackling Traffic Woes

Penang’s transport councillor says flyovers, underpasses and the LRT are essential to ease congestion.

04-09-2025
Auto News
MRT Corp Justifies RM16.8b Penang LRT Budget

MRT Corp Justifies RM16.8b Penang LRT Budget

MRT Corp says the RM16.8 billion ceiling for Penang LRT reflects market realities, but MCA wants clearer answers on taxpayers’ money.

21-08-2025
Auto News
Langkawi LRT ‘Unrealistic’, Focus Stays on Penang LRT and ECRL - Loke

Langkawi LRT ‘Unrealistic’, Focus Stays on Penang LRT and ECRL - Loke

The government is pushing ahead with the Penang LRT and ECRL, but dismissed talk of a Langkawi LRT as unrealistic.

19-08-2025
Auto News
Penang LRT Stays Within RM16 Billion Budget - MRT Corp

Penang LRT Stays Within RM16 Billion Budget - MRT Corp

Penang LRT project capped at RM16 billion, with MRT Corp aiming to deliver a cost-efficient system despite rising expenses.

30-07-2025
Auto News
Penang Still Waiting For Green Light From MOT For LRT project

Penang Still Waiting For Green Light From MOT For LRT project

Penang is set to begin Mutiara LRT construction but awaits final approval from MRT Corp and MOT.

02-07-2025

Latest News

Auto News
The RM5,000 Raya Flex: Why Malaysians are Risking a Monthly Salary to Rent an Alphard

The RM5,000 Raya Flex: Why Malaysians are Risking a Monthly Salary to Rent an Alphard

Is renting an Alphard for RM5,000 a waste or a genius move? We break down the 'Raya Flex' cost, from RM10k insurance premiums to the 'Executive Lounge' comfort that saves your back on an 18-hour East Coast jam.

27-03-2026
Auto News
Safe Passage at Hormuz: Why Malaysia’s Special Deal with Iran Won't Lower Your Petrol Price

Safe Passage at Hormuz: Why Malaysia’s Special Deal with Iran Won't Lower Your Petrol Price

PM Anwar secured safe passage for Malaysian ships, so why is RON95 hitting RM3.87/L? We decode the 400% insurance surge and the new 200L BUDI95 quota.

27-03-2026
Auto News
Fuel Subsidy Update: Your 300L Monthly Quota Could Drop to 200L This April

Fuel Subsidy Update: Your 300L Monthly Quota Could Drop to 200L This April

If you rely on subsidised RON95 petrol to get to work, take note: a major change is coming to your monthly fuel budget.

26-03-2026
Auto News
Fuel Price Shock: Diesel Spikes to RM5.52, Unsubsidised RON95 Jumps 60 Sen

Fuel Price Shock: Diesel Spikes to RM5.52, Unsubsidised RON95 Jumps 60 Sen

Massive 80-sen spike for Diesel (RM5.52) and 60-sen jump for unsubsidised RON95 (RM3.87). Learn how the Budi Madani RM300 aid and BUDI95 quota protect Malaysian drivers this week.

26-03-2026
Auto News
Strait of Hormuz to Malaysia: Why We’re Paying for a War 6,000km Away

Strait of Hormuz to Malaysia: Why We’re Paying for a War 6,000km Away

Why is RON97 at RM4.55/L? We decode the Strait of Hormuz conflict, the May 2026 subsidy deadline, and why Malaysia imports oil despite being a producer.

19-03-2026
Auto News
From 82 Minutes to 8: How the Mutiara Line is Giving Penangites Their Time Back

From 82 Minutes to 8: How the Mutiara Line is Giving Penangites Their Time Back

Is the 80-minute Penang Bridge crawl finally ending? The Mutiara Line LRT links Butterworth to Komtar in just 8 minutes. Get the latest 2026 project updates, station lists, and more.

17-03-2026
Auto News
The 2026 Proton X90 Buyer’s Warning: 5 Critical Safety Features You Are No Longer Getting

The 2026 Proton X90 Buyer’s Warning: 5 Critical Safety Features You Are No Longer Getting

ASEAN NCAP revokes Proton X90’s 5-star rating. The 2026 facelift is downgraded to 1-star after stripping critical ADAS features. Is your family safe? Get the full safety specs here.

16-03-2026
Auto News
9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works

9,000+ Drivers Chose Toyota Hybrids This Year: Proof That Toyota’s Multi-Pathway Strategy Works

Toyota Malaysia hits 9,556 sales in early 2026, proving the "Multi-Pathway" strategy works. From Vios Hybrid to Vellfire HEV, see why hybrids are winning the sales war.

12-03-2026