Link Copiedcheck_circle
Auto News

Elevated Highway Aims To End Traffic Disaster In Seberang Prai

Anis

Share via

Untitled-design---2025-03-28T111323.191.png
Penang's first third-level flyover and an 8.95-kilometer elevated highway will be built as part of the upcoming Juru-Sungai Dua Elevated Highway (JSEH). The RM3bil JSEH, expected to be completed in 2030, aims to alleviate traffic congestion on Penang's mainland, specifically the "longest traffic jam in the northern region," which often stretches over 17 km.

The state infrastructure committee chairman, Zairil Khir Johari, announced that the new 17.4-kilometer, eight-lane link will separate local and highway traffic, similar to the Ipoh North-South Expressway section. 3236124.jpg


This new system will replace the current outdated highway, which forces vehicles to exit at Juru, navigate local roads, and re-enter at Sungai Dua.

“There are times when over 80% of the daily traffic in Seberang Perai is just passing through. The vehicles just exit the expressway in the south and drive north to the toll plaza towards Kedah, Perlis and even southern Thailand.

"With the JSEH, motorists in Kedah, Perlis and mainland Penang will no longer have to ‘share’ the road. JSEH will completely separate through-traffic and local traffic,” he says in a The Star report.

Zairil noted that island traffic using the Penang Bridge to reach the mainland will be able to access the North-South Motorway via JSEH immediately upon bridge exit, instead of going to the Juru toll plaza.

“We will also eliminate one of the most “feared” intersections along this route near Juru Auto City.

“From the current eight phases with many traffic lights and a flyover, it will become free-flowing with two elevated u-turns for local traffic to cross over,” he stated. 

JSEH's construction cost of RM3bil was kept low due to minimal land acquisition requirements. The highway will utilize existing highway space and reserve land adjacent to the route, minimizing the need for land purchases.

screenshot-2024-11-01-091119_4691704_20241101091142.jpg


This approach was confirmed by the chairman of the state infrastructure committee, who also highlighted that the highway incorporates elevated segments, flyovers, ramps, slip roads, and split toll plazas.

“This is also why we can start the construction quickly,” said Zairil, adding that physical work was expected to start by the fourth quarter.


Tagged:

Juru-Sungai Dua Elevated Highway (JSEH)
JSEH
Penang mainland
elevated highway
Share This Article

Written By

Anis

Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........

Share via

Related News

Auto News

EKVE 91% Completed, To Be Opened In Stages In 2024 - Works Ministry

The East Klang Valley Expressway EKVE is 91% complete, according to the Works Ministry.

08-03-2023
Auto News

PJD Link Doesn’t Exist In Selangor’s Plans For Now - MB

PJD Link project has not been submitted for planning approval in Selangor, says MB.

02-03-2023
Auto News

The new SUKE highway is set to open very soon

New Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) will be opened to the public soon, and here’s what you ought to know.

15-09-2022

Latest News

Auto News

Malaysians Told To Ignore False Claims Of RON95 Rationing

The Finance Ministry has denied viral claims of RON95 rationing and urged Malaysians to beware of suspicious messages and links.

29-08-2025
Auto News

Johor Speeds Up Road Repairs with Pothole Pro JCB

Johor lead Asia-Pacific region by adopting Pothole Pro JCB for faster, longer-lasting road repairs.

Auto News

Loke: KLIA Taxi Touting Betrays Nation’s Image

KLIA taxi touts overcharging tourists by up to RM400 are tarnishing Malaysia’s reputation.

Auto News

PLUS Expects 2.2 Million Vehicles This Merdeka Weekend

PLUS is bracing for 2.2 million vehicles daily over the Merdeka weekend and is urging drivers to plan ahead using its updated app.

29-08-2025
Auto News

Nanta: MYJalan Will Become National Road Database

MYJalan app set to evolve from complaint channel to key tool in managing Malaysia’s road network.

Auto News

Transport Ministry Pushes MAHB To Keep KLIA Aerotrain Glitch-Free

Transport Ministry wants MAHB to keep the aerotrain running smoothly with strict daily monitoring.

28-08-2025
Auto News

JSPT Set To Pilot e-Police Reporting on PLUS Highway from Sept 1

e-Police Reporting pilot begins Sept 1 on PLUS, giving motorists in non-injury accidents the option to file reports online.

Auto News

MSF Merdeka Race 2025 Set To Feature 111-Lap Enduro And More

MSF Merdeka Race 2025 marks eighth edition this weekend, features 111-lap enduro race event and more.

28-08-2025