Link Copiedcheck_circle
Auto News

QR Codes Coming for Drivers at Johor Checkpoints

Kumeran Sagathevan

Share via

uses-artificial-intelligence-(AI)-to-detect-paint-flaws-on-the-cars-it-assembles-at-its-facilities-in-the-United-States.-(85).png


The Malaysian government will expand QR code immigration clearance at the Sultan Iskandar Building (BSI) and Sultan Abu Bakar Complex (KSAB) in Johor, targeting car drivers this year.

Deputy Prime Minister Datuk Seri Fadillah Yusof said this follows the successful use of QR codes for bus passengers and motorcyclists, easing congestion at the Johor-Singapore Causeway.


481277542_1190322629327095_4454720006250671227_n.jpg


"By integrating technology and improving infrastructure, immigration clearance now takes only three seconds per user," he said after chairing the Special Committee Meeting to Address Congestion on the Johor Causeway.

With Malaysia set to chair ASEAN in 2025 and boost tourism and investment, the government is taking urgent steps to address traffic congestion.

The committee agreed to extend these measures nationwide, ensuring smoother entry at all major international checkpoints.


480923368_1051037647054507_5428770025316273269_n.jpg


Home Minister Datuk Seri Saifuddin Nasution Ismail confirmed QR codes have increased motorcycle clearance from 90 to 150 per lane every 15 minutes at BSI and KSAB.

"Next, we move our focus on car users, as they now face the worst congestion," he said, adding that solutions are also being explored for entry points like Rantau Panjang, Sadao, Bukit Kayu Hitam, Padang Besar, and major airports.


Untitled-design---2023-04-18T215748.117.png


He also updated on the Johor Bahru-Singapore Rapid Transit System (RTS) Link, set to be completed by Dec 31, 2026, carrying 10,000 to 20,000 passengers per hour.

"Early preparations are crucial to manage traffic at Bukit Chagar and the RTS location in Singapore," he added.

These efforts aim to streamline immigration, improve travel efficiency, and enhance Johor-Singapore connectivity.


Source: BERNAMA


Tagged:

Causeway QR Code
CIQ QR Code
Minister of Energy Transition and Water Transformation (PETRA), Datuk Seri Fadillah Yusof
Johor Bahru-Singapore Rapid Transit System (RTS)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

EV
DPM Reaffirms 10,000 EV Chargers Target, But Are We REALLY On Track?

DPM Reaffirms 10,000 EV Chargers Target, But Are We REALLY On Track?

To hit its ambitious target of having 10,000 EV chargers up year end, Malaysia must do more than count chargers — it must chart a reliable course forward.

EV
PETRA Pledges 10,000 EV Charging Stations by Year-End

PETRA Pledges 10,000 EV Charging Stations by Year-End

Fadillah stresses the need for EV chargers in urban and rural areas, aims for 10,000 stations nationwide by year-end.

Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel

RTS Link Fare Study Underway to Ensure Affordable Cross-Border Travel

RTS Link operators are finalising fare strategies to encourage more commuters to switch from private vehicles to public transport.

Auto News
Johor On Track To Become Major Rail Hub In Malaysia

Johor On Track To Become Major Rail Hub In Malaysia

Johor is set to become a major rail hub in Malaysia underpinned by ongoing rail developments.

24-03-2025
Auto News
JB-SG RTS Link Fares Will Consider Currency Exchange

JB-SG RTS Link Fares Will Consider Currency Exchange

RTS Link ticket fares will be finalized by January 2027, considering factors like Malaysia-Singapore exchange rates.

27-02-2025
Auto News
Govt Calls For Bids For Elevated ART In JB

Govt Calls For Bids For Elevated ART In JB

Public-Private Partnership Unit (UKAS) will soon be initiating the process of soliciting proposals for ART in JB.

14-02-2025
Auto News
RTS Link 95% Complete, Service Operation Dec 2026

RTS Link 95% Complete, Service Operation Dec 2026

The Johor Bahru-Singapore RTS is 95% complete as of last November.

Latest News

Auto News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized

JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.

Auto News
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score

The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?

02-08-2025
Auto News
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.

01-08-2025
Auto News
Govt Looking To Revive MEX II Highway With New Completion Plan

Govt Looking To Revive MEX II Highway With New Completion Plan

The government is working with bondholders to restart the long-delayed MEX II Highway.

01-08-2025
Auto News
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.

01-08-2025
Auto News
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.

01-08-2025
Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

Auto News
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.