Link Copiedcheck_circle
Auto News

Loke: No ETS For East Coast

Kumeran Sagathevan

Share via

492185114_1221336066023971_8440364577396966218_n.jpg


The government has no immediate plans to extend the Electric Train Service (ETS) to Malaysia’s east coast, Transport Minister Anthony Loke confirmed.

He explained that the railway infrastructure in the east coast is not suitable for electrified train operations. The tracks are single-lane and not electrified, which limits the type of trains that can be used.

“For now, only Diesel Multiple Units (DMUs) operate in that region due to infrastructure constraints,” said Loke. “But once the East Coast Rail Link (ECRL) is ready, it will cater to that corridor.”


493457617_1221335962690648_2252015196025639346_n.jpg


Loke made the remarks during a press event for the launch of Prasarana’s new fleet of diesel buses. The event was also attended by key public transport officials including APAD Director-General Datuk Azlan Shah Al Bakri, Prasarana CEO Mohd Azharuddin Mat Sah, and Rapid Bus Chairman Datuk Seri Mustafar Ali.

For now, ETS operations will remain focused on the west coast route from Padang Besar in the north to Johor Bahru in the south.

To support this, the Ministry of Transport previously announced the procurement of 10 new ETS train sets. Two of these have already been delivered to Keretapi Tanah Melayu Berhad (KTMB) under a RM400 million investment aimed at meeting growing demand.


ETS-School-Holiday-(2).jpg


KTMB has reported that ETS ridership increases by around 10% annually, reflecting strong user satisfaction. With the Gemas to Johor Bahru electrification project nearing completion, the company is preparing to expand ETS services to new destinations.

Loke also noted that while KTMB has yet to achieve full commercial viability, profitability is not its main priority.

“As a government-linked company, KTMB has a responsibility to deliver public service, not just focus on financial returns,” he said. “Our priority is to improve service quality, especially for commuter, ETS, and cargo operations.”


Source: BERNAMA

Tagged:

electric train services (ETS)
Keretapi Tanah Melayu Berhad (KTMB)
Minister of Transport YB Anthony Loke
Prasarana Malaysia Bhd
Diesel Multiple Units (DMUs)
Share This Article

Written By

Kumeran Sagathevan

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!

Share via

Related News

Auto News
ETS3 To Johor Bahru Set To Roll Out by Mid-December

ETS3 To Johor Bahru Set To Roll Out by Mid-December

The ETS3 line is set to launch by mid-Dec, extending the Electric Train Service from Gemas to JB.

03-11-2025
Auto News
KTMB Adds Extra ETS Trips For Deepavali Travel Rush

KTMB Adds Extra ETS Trips For Deepavali Travel Rush

KTMB will operate additional ETS services between Padang Besar and KL Sentral from Oct 17 to 22.

06-10-2025
Auto News
KTMB Adds 11,340 Extra ETS Seats for Aug - Sept Holidays

KTMB Adds 11,340 Extra ETS Seats for Aug - Sept Holidays

KTMB is adding 630 ETS seats daily from Aug 28 to Sept 21, totalling 11,340 extra seats across popular holiday period.

Auto News
KTMB Signal Upgrade - Train Delays from May 31 to June 2

KTMB Signal Upgrade - Train Delays from May 31 to June 2

KTMB will upgrade the signalling system between Kepong and Salak Selatan from Saturday, May 31 to Monday, June 2.

Auto News
ETS Expansion: Two New Trains Arriving In April

ETS Expansion: Two New Trains Arriving In April

Malaysia is set to receive two new ETS trains from China next month, eight more will be assembled locally.

Auto News
Gemas-JB ETS Expected To Launch In Aug 2025

Gemas-JB ETS Expected To Launch In Aug 2025

ETS between Gemas and JB is nearing completion and is expected to start running in August.

05-03-2025
Auto News
KTMB Provides Extra ETS Trains For CNY 2025

KTMB Provides Extra ETS Trains For CNY 2025

KTMB will add two more ETS trains for the KL Sentral-Padang Besar route and return trips in conjunction with the CNY.

03-01-2025
Auto News
ETS Introduces New Train Schedule Inline With KDVT Phase 1 Completion

ETS Introduces New Train Schedule Inline With KDVT Phase 1 Completion

KTMB ETS introduces new schedule, adds an additional 20 trips to coincide with KDVT Phase 1 completion.

Latest News

Auto News
RTS Link 65% Complete, First Train Arriving This Month

RTS Link 65% Complete, First Train Arriving This Month

RTS Link connecting JB and SG is officially 65% complete, with the first train set expected to arrive this month.

03-11-2025
Auto News
Toyota Skill Contest 2025 Winners Announced

Toyota Skill Contest 2025 Winners Announced

Winners for the Toyota Skill Contest 2025 organised by UMW Toyota Motor have been announced.

03-11-2025
Auto News
Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border

Budi95: Only 0.6% Max Out Quota, Govt Flags Unusual Purchase Near Border

Only 0.6% hit the 300L limit under BUDI95 programme with most recipients using only about 98 litres in Oct.

03-11-2025
Auto News
RM600 Million Super Magnet Plant Set to Power Malaysia’s EV Ambitions

RM600 Million Super Magnet Plant Set to Power Malaysia’s EV Ambitions

RM600 million JS Link–Lynas investment drives Malaysia’s push in downstream REE processing for EV and clean energy sectors.

Auto News
Datuk Abdul Rashid Musa Returns To Proton As Deputy CEO

Datuk Abdul Rashid Musa Returns To Proton As Deputy CEO

Datuk Abdul Rashid Musa returns to Proton as Deputy CEO, succeeding Roslan Abdullah.

03-11-2025
Auto News
ETS3 To Johor Bahru Set To Roll Out by Mid-December

ETS3 To Johor Bahru Set To Roll Out by Mid-December

The ETS3 line is set to launch by mid-Dec, extending the Electric Train Service from Gemas to JB.

03-11-2025
Auto News
Selangor Govt Will Decide Fate Of 19 WCE-Affected Residents

Selangor Govt Will Decide Fate Of 19 WCE-Affected Residents

The Selangor govt is set to decide soon on the fate of 19 Kampung Jawa residents affected by the West Coast Expressway project.

Auto News
APAD Orders Aeroline To Halt Services Over Repeated Non-Compliance

APAD Orders Aeroline To Halt Services Over Repeated Non-Compliance

Aeroline was directed to halt trips from Nov 6 to Dec 5 after failing to relocate to approved terminals as required by APAD.

03-11-2025