Link Copiedcheck_circle
Auto News

ETS Segamat–Johor Bahru Extension is On Track, No Delays – MoT

Mukhlis Azman

Share via

the-new-gemas-jb-ets-v0-tky281xrea5d1.jpg

Transport Minister Anthony Loke says the ETS extension project from Segamat to Johor Bahru is on track with no delays.

The ETS extension project from Segamat to Johor Bahru is on track with no delays, says Transport Minister Anthony Loke.

MoT-Minister-YB-Anthony-Loke.jpg

Transport Minister YB Anthony Loke

Speaking to The Star after opening the ASEAN-China International Rail Transit Forum 2025 earlier today, Loke said things remain on track for the entire stretch of the project, which is scheduled to be ready by "the end of the year."

"It is inaccurate to say that there is a delay. In fact, I have said a few months ago that the project will be completed in phases. The first phase was the opening of the Gemas to Segamat in March (2025)," Loke continued.

ETS-Extension-Gemas-JB-Map.pngKTM-ETS-Train-(1).jpg

The electrification and double tracking project (EDTP) for the ETS line consists of three main phases, with the first one stretching from Gemas to Segamat, the second one covering Segamat to Kluang, and the third one from Kluang to Johor Bahru.

As of now, the ETS service is already running on the stretch of the first phase, while the commencement date for the second phase stretch, which was intended to open before Aug 31, is still pending confirmation from a "very important person" who will be given the honour to drive the first ETS to Kluang.

Loke, however, did not reveal the true identity of said VIP.

KTM-ETS-Train-(2).jpg

Commenting on the perception of the ETS extension project being delayed, the minister explained that the first new train just finished testing, and that is the reason why the ministry was not able to make any announcement any earlier, other than waiting for confirmation from the "VIP train driver."

Source: The Star


Gallery

Tagged:

ETS
Minister of Transport YB Anthony Loke
ETS Johor Bahru
ETS Extension Project
ETS Electrification & Double Tracking Project
Share This Article

Written By

Mukhlis Azman

An avid two-wheeler that writes and talks about four-wheelers for a living, while dreaming of an urban transit-laden Malaysia. @mukhlisazman

Share via

Related News

Auto News

ETS 3 Final Phase to Johor Bahru Set for December Launch – MoT

Transport Minister Anthony Loke said the final phase of the ETS 3 project to Johor Bahru will be launched this December.

26-08-2025
Auto News

MoT Set to Add 10 New KTM ETS Train Sets in Q1 2025

The Ministry of Transport has procured 10 new KTM ETS train sets, set to be operational later in Q1 2025.

19-12-2024
Auto News

ETS, Komuter Will Be Refurbished To Increase Frequency - Loke

Older Electric Train Service (ETS) and Komuter trains will be refurbished to increase capacity and frequency.

01-03-2024
Auto News

Commuters, ETS Passengers Can Still Travel On KTMB Services

ETS and Komuter passengers can continue to use KTMB services by using a temporary shuttle bus.

13-12-2023
Auto News

KTMB: Additional Raya, Labour Day Train Tickets Presently On Sale

KTMB launches extra ETS trains in conjunction with Hari Raya and Labour Day.

26-03-2023
Auto News

Additional KTMB Train Services for GE-15 Announced

KTMB adds special additional train services, starting from 18 to 20 Nov amidst upcoming 15th General Election.

01-11-2022
Auto News

Loke: No Rush on Dashcam Mandate for E-Hailing

Loke says mandating dashcams with audio in e-hailing vehicles requires deeper consultation.

Auto News

MTSB Bill in the Works to Streamline Transport Safety

The MTSB Bill is being drafted to integrate agencies like MIROS and AAIB, ensuring efficient transport safety management.

Latest News

Auto News

Why Your Next Group Trip Costs 80% More: Diesel Hits Historic RM6.02 (April 2-8)

Malaysia's tour bus and van rates jump 80% as diesel hits a historic high.

01-04-2026
Auto News

Bye-Bye RM1.99? Why Your Petrol Subsidy is Now a 'Timed' Reality

Will RON95 hit RM2.87? SERC warns of a "timed reality" for Malaysia's petrol subsidies. Break down the RM4 billion subsidy bill and what the 200L quota cut means for you.

01-04-2026
Auto News

MITI Breaks Silence: The Truth Behind the '80% Export' Ultimatum

MITI breaks its silence on the viral BYD "80% export" rumors. From the RM100k EV price floor to the truth behind the BYD Shark "ban," here is the official clarification on Malaysia's automotive future.

31-03-2026
Auto News

DUI Offenders Face Direct Compensation to Families Under New Law

Transport Minister Anthony Loke confirms new amendments to Act 333 for DUI offenders.

31-03-2026
Auto News

7 Years of Peace of Mind: Why the Saga MC3’s New Warranty is a "Must-Have" Add-On

Proton's new RM1,200 extended warranty for the Saga MC3 offers 7 years of cover. We decode the costs, the 1.5L i-GT engine risks, and the resale value hacks.

30-03-2026
Auto News

Reality Check: Decoding the Massive Gaps in Maslan’s Cycling & Biodiesel Proposals

We decode the RM643m funding gap in Ahmad Maslan's B20 biodiesel plan and the reality of cycling in Malaysia. Is the 7-point fuel fix a dream or a disaster?

30-03-2026
Auto News

Final 24 Hours: 3 Things You Must Do Before the BUDI95 Quota Drops to 200L Tomorrow

Midnight Deadline: The BUDI95 quota drops to 200L in less than 24 hours. See the 3 vital steps every driver must take today to avoid a massive price shock at the pump tomorrow.

30-03-2026
Auto News

Proton Wants to Forgive Your “Service Sins” from RM120

Lapsed your Proton service for 12 months? Get a fresh start with PROTON’s 2026 campaign. Packages from RM120 for Persona/Saga and RM216 for X-series SUVs.

30-03-2026