TNB To Install charging Facilities For EVs Along PLUS Highways

As part of its partnership with PLUS Malaysia Bhd, Tenaga Nasional Bhd (TNB) will build electric vehicle (EV) charging infrastructure along the North-South Expressway, according to TNB President and Chief Executive Officer Datuk Baharin Din on Tuesday (Aug 2).
The energy company would invest RM90 million over three years to support the EV ecosystem.
“TNB aims to accelerate the battery electric vehicle (BEV) adoption to capture the RM1.3 billion market value by 2030, and welcomes collaboration with strategic partners to stimulate the growth of the BEV ecosystem,” he explained.
TNB and PLUS declared their collaboration to minimise carbon emissions on PLUS roadways through sustainability efforts in March of this year.
Both parties stated in a joint statement at the time that the measures included building a network of EV charging stations, installing energy efficiency monitoring systems, and installing solar PV systems at specific rest and relaxation (R&R) areas along the PLUS highway network.
Along with PLUS, according to Baharin, TNB also is in discussions with highway operators and federal road authority run by the Public Works Department.
By 2025, the EV industry might support 33,350 BEVs with 3,300 charging stations, generating RM80 million in yearly power revenue. By 2030, that number is expected to rise to 524,409 BEVs with 18,000 charging stations and RM1.25 billion in electricity revenue.
“By 2030, we forecast half a million EVs to be on the road with 2.3 TWh of electricity charging requirements, valued at RM1.26 billion. This also means 4.4 million tonnes of CO2 emissions reduction by taking internal combustion engine (ICE) vehicles off the road,” he added.
The growth of the EV ecosystem is a clear priority for TNB because of the potential benefits it may have on the environment and the business's bottom line, he said.
Along with developing the infrastructure for charging, TNB will also electrify 4,200 of its own vehicles, support EV-related studies, and encourage alliances among EV sector players like ZEVA in addition to establishing the charging infrastructure (Zero Emission Vehicle Association).
Gallery
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VRQ4630
SELANGOR
BST7684
JOHOR
JE4121J
PULAU PINANG
PSF6184
PERAK
APL5350
PAHANG
CFH7571
KEDAH
KGJ1529
NEGERI SEMBILAN
NEL8931
KOTA KINABALU
SJU1592
KUCHING
QAB5782P
Last updated 20 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Latest News
Perodua Ativa X Is Now RM53K - Would You Still Buy A Myvi?
The Perodua Ativa X is now RM53,000 after a RM9,500 rebate, just RM1,900 below the Myvi 1.5 H. Here's what you get with each.
17-09-2026
BUDI Diesel Can Now Be Transferred Beyond Family - Here's How It Works
BUDI Diesel eligibility can now be transferred beyond immediate family to the actual vehicle user. Here's who qualifies, how to apply and the Sept 27 deadline.
17-09-2026
Puspakom Has More Rivals Now. So Why Aren't Car Inspections Getting Cheaper?
Puspakom now has rivals for M.V.15 ownership transfer inspections, but fees won't get cheaper. Here's why JPJ is keeping rates standardised.
15-09-2026
If You're In Penang And Eyeing A Suzuki, There's A New Showroom To Check Out
Suzuki has opened a new RM1 million dealership in Juru, Penang, expanding its Malaysian network to 14 sales outlets and 13 service centres.
14-09-2026
Malaysia Has More Car Brands Than Ever. So Why Do We Still Choose Proton And Perodua?
Proton and Perodua account for nearly 63% of Malaysia's new car registrations in 2026. Here's why national brands still dominate despite growing competition.
14-09-2026
40,595 Summonses, RM12.18 Million Unpaid. JPJ's Patience Is Running Out
JPJ has given 945 transport companies 14 days to settle 40,595 outstanding summonses worth RM12.18 million or face tougher enforcement.
11-09-2026
Use The Kelana Jaya LRT? Here's Why Some Stations Won't Open Until 9.30AM
Kelana Jaya LRT track replacement works run from Sept 2026 to Sept 2027. Check the affected stations, Sunday dates and 9.30AM opening times.
10-09-2026
Your Car's Windscreen Isn't Just Glass, And This Crash Test Shows Why
Malaysia's first live windscreen crash test at MIROS shows why proper installation, adhesive and curing time matter for vehicle safety.
10-09-2026
Show More
trending_flat
