5 Rapid KL MRT Stations Repair Works Commences - Completes On 16 December
Prasarana, the concession holder for Rapid line of services posted yesterday all the fixes it was undertaking to the long broken facilities at several of its MRT stations. This comes after the newly appointed Minister of Transport Anthony Loke took it upon himself to conduct a “spot check” last week on the rail services level of comfort and safety of the facilities.
Based on Rapid KL’s social media post, there were five facilities where the first round of facility refurbishment was conducted. First being the escalator handrail repair works at the National Museum to KL Sentral passenger walkway on 14 December.
The second was the step chain replacement for escalator no five at Kajang MRT station to be completed by 16 December while the third was the step chain replacement at Kota Damansara MRT station on escalator no one due to be completed by 16 December too.
Forth location undergoing repair works would be the Sri Raya MRT stations escalator which had its handrail and balustrade bearings replaced on 14 December and the final location being the Taman Connaught MRT station which had its lift core roof refurbished also on 14 December.
Rapid KL moving forward would continue to closely engage public complaints and constantly work to upkeep its facilities for the convenience of the users. Anthony Loke in a press statement today told BERNAMA that he is happy at the speed Rapid KL is working in undertaking all the repair works. He further stated that all the public facilities maintenance must be made a culture to ensure these facilities are in good working order.
Gallery





Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VPM4900
SELANGOR
BSG7498
JOHOR
JYE4605
PULAU PINANG
PRT744
PERAK
ANY6854
PAHANG
CFD479
KEDAH
KGB6308
NEGERI SEMBILAN
NEG6323
KOTA KINABALU
SJL9999*
KUCHING
QAB8364L
Last updated 03 Aug, 2025
Fuel Price
Petrol
RON 95
RM 2.05
RON 97
RM 3.17
-0.04
RON 100
RM 5.00
VPR
RM 6.23
Diesel
EURO 5 B10
RM 2.91
EURO 5 B7
RM 3.11
Last updated 31 Jul, 2025
Related News
Ten LRT KJ Line Stations Set for Upgrade – Open From 9 AM on Weekends
Ten LRT stations on the Kelana Jaya line will be upgraded, and their operation times will be affected on weekends.
28-07-2025
Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included
The Rapid KL On-Demand service has been expanded to five new zones, including Cyberjaya and Putrajaya.
17-06-2025
Rapid KL Boosts Peak Hours Operations Ahead of ASEAN Summit
Rapid KL extends peak hours train frequency to support commuters during the ASEAN Summit.
21-05-2025
Cabinet Committee Set To Tackle Road Congestion and Safety in 2025
JK-MKKJR outlines major infrastructure and enforcement plans to reduce traffic issues and accidents.
14-05-2025
Platform Automatic Gate System At KL Sentral & Tun Sambathan Now Operational
Prasarana announced that PAGS are now fully operational at KL Sentral and Tun Sambanthan stations.
26-11-2024
Prasarana Updates Peak Hour Operations For Ramadan
Prasarana has announced that the peak hours for its rail and bus services will be extended throughout Ramadan.
12-03-2024
Five LRT3 Stations Set To Be Operational In 2027
Five Light Rail Transit Line 3 (LRT3) stations that were previously cancelled should be operational by 2027, says Loke.
11-01-2024
Prasarana Will Enable Credit And Debit Card Options At Rail Stations By July
Prasarana plans to enable credit and debit card payments at ticketing counters by July.
07-12-2023
Latest News
JPJ: RM3 Million Rolls-Royce Among 53 Vehicles Seized
JPJ Ops Luxury 2.0 sees 53 high-end vehicles, including a Rolls-Royce Cullinan and Lamborghini Huracan, seized over expired road tax and insurance.
02-08-2025
Malaysian-Bound Toyota Yaris Cross Receives 5-Star ASEAN NCAP Score
The DNGA-based Toyota Yaris Cross just received a five-star score for the ASEAN NCAP crash test. Coming to Malaysia soon?
02-08-2025
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted
New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.
01-08-2025
Govt Looking To Revive MEX II Highway With New Completion Plan
The government is working with bondholders to restart the long-delayed MEX II Highway.
01-08-2025
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days
2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.
01-08-2025
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready
Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.
01-08-2025
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas
With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.
01-08-2025
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout
PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.
01-08-2025
Show More
trending_flat