ENZHMS
Link Copiedcheck_circle
Auto News

Anthony Loke: 3 Minute LRT Interval & Full Operational System By June 2023

KS

Share via


In a media press conference today, YB Anthony Loke addressed a few issues pertaining to the rail services under the purview of Prasarana.


LRT Kelana Jaya line currently is serviced by 38 sets of LRT trains which results in the five minute service interval. This is due to the fact that 18 more trains are still in various stages of maintenance. He however assured the public that all 56 trains will be fully operational by the third quarter of 2023.


He further added that Prasarana has been instructed to speed up the maintenance work to have at least 48 trains running in order to achieve the targeted 3-minute interval schedule. Prasarana has also acquired 19 new trains to service the Kelana Jaya LRT route which will start delivering in August 2023.


Prasarana, according to Loke, would also carry out major maintenance work on its LRT system which includes power generators;he does on to agree that the service is still not stable with back to back disruptions. However, the management has been instructed to have in place back-up plans and SOPs in place to lessen future disruptions. This is in view of the last massive five day Kelana Jaya LRT line closure which affected commuters badly. An independent report on that is under-way and will be made public when it's available.



Based on his personal spot-checks a couple of days back where facilities in the LRT and monorail stations are not up to par, Loke added that the ministry is in the stages of awarding the contract for the replacement of 16 elevators in monorail station this coming February.


Other than that, Prasarana has also ordered 192 handrail units and 22 step chain units to facilitate  repair works on 46 of the 706 escalators. They have also taken into account about 600 light bulbs which require changing and 17 roof leakage to be addressed immediately.


Moving beyond that, Loke has also instructed its division in the Transport Ministry to work with other ministerial departments such as DBKL, MPSJ and others to ensure there is a proper continuity to facility maintenance, upkeep and development to achieve a more comprehensive public transport ecosystem.




Loke said he had also instructed the management of the Land Division of the Transport Ministry to expand the scope of the committee for all public transport facilities in the Klang Valley for a more comprehensive public transport ecosystem.


The final matter address was with regards to the all important first and last mile transport. According to Loke, Prasarana will further look into this matter and engage other parties including the e-hailing operators in order to make public transportation more feasible to the masses. A cost implication study will be carried out by Prasarana on this matter. 




Share This Article

Written By

KS

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well! https://www.linkedin.com/in/kumeran-sagathevan/

Share via

JPJ Running Numbers

KUALA LUMPUR

VPG4347

SELANGOR

BSF5076

JOHOR

JYA5080

PULAU PINANG

PRR4984

PERAK

ANW6804

PAHANG

CFC1457

KEDAH

KGA9451

NEGERI SEMBILAN

NEG2394

KOTA KINABALU

SJL3102

KUCHING

QAB5152L

Last updated 18 Jun, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.07

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.74

EURO 5 B7

RM 2.94

Last updated 12 Jun, 2025

Related News

Auto News
Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included

Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included

The Rapid KL On-Demand service has been expanded to five new zones, including Cyberjaya and Putrajaya.

17-06-2025
Auto News
Rapid KL Boosts Peak Hours Operations Ahead of ASEAN Summit

Rapid KL Boosts Peak Hours Operations Ahead of ASEAN Summit

Rapid KL extends peak hours train frequency to support commuters during the ASEAN Summit.

21-05-2025
Auto News
Cabinet Committee Set To Tackle Road Congestion and Safety in 2025

Cabinet Committee Set To Tackle Road Congestion and Safety in 2025

JK-MKKJR outlines major infrastructure and enforcement plans to reduce traffic issues and accidents.

14-05-2025
Auto News
Platform Automatic Gate System At KL Sentral & Tun Sambathan Now Operational

Platform Automatic Gate System At KL Sentral & Tun Sambathan Now Operational

Prasarana announced that PAGS are now fully operational at KL Sentral and Tun Sambanthan stations.

26-11-2024
Auto News
Prasarana Updates Peak Hour Operations For Ramadan

Prasarana Updates Peak Hour Operations For Ramadan

Prasarana has announced that the peak hours for its rail and bus services will be extended throughout Ramadan.

12-03-2024
Auto News
Five LRT3 Stations Set To Be Operational In 2027

Five LRT3 Stations Set To Be Operational In 2027

Five Light Rail Transit Line 3 (LRT3) stations that were previously cancelled should be operational by 2027, says Loke.

11-01-2024
Auto News
Prasarana Will Enable Credit And Debit Card Options At Rail Stations By July

Prasarana Will Enable Credit And Debit Card Options At Rail Stations By July

Prasarana plans to enable credit and debit card payments at ticketing counters by July.

07-12-2023
Auto News
Weekly Prasarana Transport Services Report Now Available To The Public

Weekly Prasarana Transport Services Report Now Available To The Public

Prasarana is now sharing its performance indicators with the public.

16-05-2023

Latest News

Auto News
Amir Hamzah: RON95 Subsidy Coming Reform Before 2026 Carbon Tax

Amir Hamzah: RON95 Subsidy Coming Reform Before 2026 Carbon Tax

RON95 petrol subsidies to be rationalised ahead of 2026 carbon tax rollout, comes as part of Malaysia’s energy transition.

17-06-2025
Auto News
Malaysian Single-Mom Truckers Make Local Headlines

Malaysian Single-Mom Truckers Make Local Headlines

In a male-dominated industry, 39-year-old Irzunika Idris and 40-year-old Marlia Ramli became truck drivers to support their kids.

17-06-2025
Auto News
Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included

Rapid KL On-Demand Adds 5 New Zones — Cyberjaya & Putrajaya Included

The Rapid KL On-Demand service has been expanded to five new zones, including Cyberjaya and Putrajaya.

17-06-2025
Auto News
PRO-NET Opens Three New Proton e.MAS & smart Dealerships

PRO-NET Opens Three New Proton e.MAS & smart Dealerships

PRO-NET has expanded both its Proton e.MAS and smart dealer network by opening three new outlets in Malaysia.

17-06-2025
Auto News
FT Dept, JPJ Told To Deal With Abandoned Vehicles

FT Dept, JPJ Told To Deal With Abandoned Vehicles

FT Dept and JPJ ordered to review and improve laws on abandoned vehicle disposal in KL and Putrajaya.

17-06-2025
Auto News
Gerik Crash: PSV Licence Suspended, RM1.7M Aid Raised

Gerik Crash: PSV Licence Suspended, RM1.7M Aid Raised

JPJ suspends Gerik crash bus driver’s PSV licence as investigations rule out technical failure.

17-06-2025
Auto News
PLUS Opens Three New Lanes At Rawang Selatan Toll Plaza

PLUS Opens Three New Lanes At Rawang Selatan Toll Plaza

PLUS has announced the addition of three new lanes at the Rawang Selatan toll plaza (Exit 115).

16-06-2025
Auto News
RON95 Petrol Subsidy Rationalisation Will Proceed – PMX

RON95 Petrol Subsidy Rationalisation Will Proceed – PMX

The government will proceed with the RON95 fuel subsidy rationalisation, says Prime Minister Anwar Ibrahim.

16-06-2025

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.