ENZHMS
Link Copiedcheck_circle
Auto News

BESRAYA & LEKAS Toll Rates To Be Reduced Starting 1 January 2023

KS

Share via


The toll rates for Sungai Besi Expressway (BESRAYA) and Kajang-Seremban Expressway (LEKAS) will be reduced starting 12.01am 1 Jan 2023. This was shared by Public Works Minister Datuk Seri Alexander Nanta Linggi on his social media site.


Talks of this reduction was announced by the previous prime minister Ismail Sabri last October with Ampang-Kuala Lumpur Elevated Highway (AKLEH), Guthrie Corridor Expressway (GCE), Lebuhraya Kemuning-Shah Alam (LKSA) and Kajang Dispersal Link Expressway (SILK) toll fare reduction redacted much earlier on 20th Oct 2022.




Alexander Nanta further added that the reduction is as per the decision made by Cabinet on Dec 21. He further added that there will be a reduction of up to RM0.15 for Class 1 vehicles going through Loke Yew and Mines toll plazas (North & South) on the Besraya Expressway while toll rate for Class 1 on LEKAS Expressway would be down from 0.1811 Cents/KM to 0.1666 Cents/KM on closed toll system. The Ampangan Toll Plaza would however retain its current rate.


To put into perspective, this would mean that on the BESRAYA toll rate which was RM2 would now be RM1.85 while the entire LEKAS stretch which was RM8.30 would now cost RM7.80.




Alexander Nanta also said that, “Through this rate restructuring exercise the government would save an estimated RM1.978 billion in compensation during the concession period, a saving that can be channelled to fund more important needs in the country”.





Gallery

Share This Article

Written By

KS

More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well! https://www.linkedin.com/in/kumeran-sagathevan/

Share via

JPJ Running Numbers

KUALA LUMPUR

VPM4730

SELANGOR

BSG7431

JOHOR

JYE4425

PULAU PINANG

PRT569

PERAK

ANY6659

PAHANG

CFD365

KEDAH

KGB6235

NEGERI SEMBILAN

NEG6290

KOTA KINABALU

SJL9999*

KUCHING

QAB8348L

Last updated 02 Aug, 2025

Fuel Price

Petrol

RON 95

RM 2.05

RON 97

RM 3.17

-0.04

RON 100

RM 5.00

VPR

RM 6.23

Diesel

EURO 5 B10

RM 2.91

EURO 5 B7

RM 3.11

Last updated 31 Jul, 2025

Related News

Auto News
Highway Maintenance Work Halted For Smooth Traffic Flow, Says Nanta

Highway Maintenance Work Halted For Smooth Traffic Flow, Says Nanta

The government confirms highway maintenance work will be halted to ensure smooth traffic flow.

19-04-2023
Auto News
Scheduled Maintenance Works On Besraya Highway Until Nov 30

Scheduled Maintenance Works On Besraya Highway Until Nov 30

Besraya highway reportedly set to see maintenance works performed nightly until Nov 30, prompting lane closures in stages.

05-06-2025
Auto News
BESRAYA Expressway Closed 21 May - IJM Duo Challenge 2023 Run

BESRAYA Expressway Closed 21 May - IJM Duo Challenge 2023 Run

IJM Dua Highway Challenge 2023 Run - Besraya Expressway would be temporarily closed from the slip road towards Salak Selatan & slip road between Jalan Istana to Pandan Jaya & Jalan Shamelin (both directions) from 2.00 am - 11.00 am this Sunday 21 May 2023.

20-05-2023
Auto News
3.8 Million Vehicles To Flood Highways This CNY Holidays, PDRM & JPJ To Be On High Alert

3.8 Million Vehicles To Flood Highways This CNY Holidays, PDRM & JPJ To Be On High Alert

YB Datuk Seri Alexander Nanta Linggi announced that there would be a total of 3.8 million vehicles on all the expressways nationwide during this upcoming Chinese New Year (CNY) holiday.

17-01-2023
Auto News
Govt Yet to Decide on Toll-Free Travel for Next Year’s Festive Season

Govt Yet to Decide on Toll-Free Travel for Next Year’s Festive Season

Govt has yet to decide on bringing back toll-free travel for next year’s festive season, says the Works Minister.

25-07-2025
Auto News
East-West Highway Safe, More Upgrades Coming - Works Minister

East-West Highway Safe, More Upgrades Coming - Works Minister

The Works Ministry told Bernama the JRTB is safe for users, but more upgrades are on the way under the 13th Malaysia Plan.

22-07-2025
Auto News
New Marang Bridge 55% Done, Set to Finish By Jan 2027

New Marang Bridge 55% Done, Set to Finish By Jan 2027

The RM338mil Marang Bridge project is over halfway complete and on track for January 2027.

15-07-2025
Auto News
KKR Only Gets Half of RM4B Needed for Road Repairs – Ahmad Maslan

KKR Only Gets Half of RM4B Needed for Road Repairs – Ahmad Maslan

The Public Works Ministry only received half of the RM 4 billion required to repair the damaged roads in Malaysia.

30-06-2025

Latest News

Auto News
Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

Chery’s Lepas Brand Entering Malaysia Soon? ‘Official’ IG Page Sighted

New ‘official’ IG page we sighted by chance indicates Chery’s new Lepas sub-brand is set to enter Malaysia very soon.

01-08-2025
Auto News
Govt Looking To Revive MEX II Highway With New Completion Plan

Govt Looking To Revive MEX II Highway With New Completion Plan

The government is working with bondholders to restart the long-delayed MEX II Highway.

01-08-2025
Auto News
2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift Sees 999 Units Shifted In 5 Days

2025 Proton X50 Facelift sees 999 units delivered in just five days, production hits 2,000 units mark as of end of July too.

01-08-2025
Auto News
Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Turanza 6 Tyres Launched in Malaysia – 14 to 21 Inches, EV-Ready

Bridgestone Malaysia has introduced the new Turanza 6 tyres in Malaysia, with sizes ranging from 14 to 21 inches.

01-08-2025
Auto News
Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

Johor Proposes RTS2 Link Between Iskandar Puteri and Tuas

With Bukit Chagar terminal nearing completion, Johor eyes new RTS2 link to Tuas to further ease cross-border travel.

01-08-2025
Auto News
PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC to KKR: Avoid Costly Missteps in Delayed MLFF Rollout

PAC wants KKR to ensure no hidden costs to government or road users in the upcoming MLFF toll system rollout.

01-08-2025
Auto News
Klang’s Hop-On Hop-Off Bus Launching This Aug

Klang’s Hop-On Hop-Off Bus Launching This Aug

Klang’s open-top hop-on hop-off bus launches mid-August, covering heritage sites and Port Klang’s mangroves.

01-08-2025
Auto News
Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

Anwar: 13MP Pushes for Improved Connectivity – Better Buses, Trains and Roads

The 13th Malaysia Plan focuses on better connectivity through buses, trains, roads, and smarter planning.

31-07-2025

Show More

trending_flat
Carz Automedia Malaysia Logo
About Us

CarzAutoMedia: Stay connected to the latest car news! Get instant updates on new releases, industry trends, and automotive innovations. Your go-to source for 24/7 coverage of everything automotive.

© 2025 CariCarz.com. All Rights Reserved.